ML17053D156

From kanterella
Jump to navigation Jump to search
Advises of Review of Util 800620,1217 & 31 Responses to TMI Action Plan Item II.K.3.3, Reporting Relief Valve & Safety Valve Failures & Challenges. Item Resolved
ML17053D156
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/14/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Dise D
NIAGARA MOHAWK POWER CORP.
References
TASK-2.K.3.03, TASK-TM NUDOCS 8205190050
Download: ML17053D156 (4)


Text

J, DISTR IBUIIOH."

oc e Ei1.e DEisenhut NRC PDR PPolk L PDR SNorris ORB¹2 Rdg OELD AEOD Docket No.60-220 IE ACRS-10 Gray File I<

Do ld P Di TCol burn Vice President - Engineering c/o Hiss Catherine R. Seibert Niagara Nohawk Power Corporation 300 Erie Boulevard Hest

Syracuse, New York 13202 gP

~~

~

~~c S.

'r +

C~

Dear Hr. Disc:

II 0)

(

Subject:

TIKI Action Plan Item II.K.3.3, Repor ting Relic Safety Valve Failures 'and Challenges Re:

Nine Nle Point Nuclear Station, Unit No.

1 However, we wish to formalize these reporting requirements; therefore, we will contact you in the future requesting, that you incorporate the reporting requirements in your. Technical Specifications..

Sincerely, Qgjginai >cn~" ""

He have reviewed your responses dated Dune 20, 1980, December 17, 1980 and December 31, 1980 to the above TIII Action Plan Item.

You have com-mitted to meeting the reporting requirements pmvided in our previous guidance including a report on reli~f, valve (RV)'and safety valve (SV) failures and challenges for the period April 1, 1980 through December 31, 1980 and future repor ting of RV and SV failures and challenges.

No further review of this item by NRR is planned.

Because you have com-mitted to meeting the above reporting requirements, we consider this item resolved for your facility..

CC; See next page Domenic B. Vassallo, Chief Operating Reactors Branch ¹2 Division of Licensing f 8205190050 820514 PDR ADOCK 05000220 I, P PDR OFFICE/

SURNAME/

OATE 5 ORB¹2~D SNP'ri s

~ ~ ~ ~ ~ ~ ~I~ ~ ~ ~ ~ ~ ~

~ 0

~

5/h /82

~

~

~ If\\ ~r ~ r ~ ~ ~ ~ ~

~

~ ~

ORB¹2:DL PPolk/cab 5/rk/82

~

~ ~ 1

~ 0 ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ 5/

/82 5//+82 ORB¹3:DL C-ORB¹2:DL TColburn DVassallo NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~r9M

h

~

~

~

~

4

Yir. Donald P. Disc cc Leonard M. Trosten, Esq.

LeBoeuf, Lamb, Leiby 8 MacRae 1333 New Hampshire
Avenue, N.

W.

Suite 1100 Washington, D.

C.

20036 State University College at Oswego Penfield Library - Documents

Oswego, New York 13126 Resident Inspector c/o U.S.

NRC P.O.

Box 126

Lycoming, New York 13093 Carl D. Hobelmar Esq.
LeBoeuf, Lamb, Lei by 5 MacRae 1333 New Hampshire
Avenue, N.W.

Suite 1100 Washington, D.C.

20036 Ronald C.

Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

g P,it REgtr Wp0 ss A,

ss j,.

/y 0

  • ++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 14, 1982 r

Doc t No. 50-220

~

~

~

~

~

Mr.

D aid P. Disc Vice P /ident - Engineering c/o Miss Catherine R. Seibert Niagara Mo)ayk Power Corporation 300 Erie BoEskevard West

Syracuse, Neh'pork 13202

Dear Mr. Disc:

Subject:

TMI Aetio i lan Item II.K.3.

Reporting Relief Valve and Safety Va Failures

and, allenges e

Re:

Nine Mile Poin uclear tion, Unit No.

1 We have reviewed your respo es ted June 20, 1980, December 17, 1980 and December 31, 1980 to the e TMI Action Plan Item.

You have com-mitted to meeting the report

'qequirements provided in our previous guidance including a report "liief valve (RV) and safety valve (SV) failures and challenges fo he p

iod April 1, 1980 through December 31, 1980 and future reportin f RV an y5V failures and challenges.

No further review of this m by NRR i~planned.

Because you have com-mitted to meeting the ve reporting Ye, uirements, we consider this item resolved for you acility.

However, we wish to Ermalize these report )g requirements; therefore, we will contact yo n the future requestingqt)at you incorporate the reporting require ts in your Technical Special cations.

Sincerely, Domenic B. Vassa, o,

Chief Operating Reactors ranch b'2 Division of Licensin g CC:

See ne page