Docket No. 50-220 September 30, 1981 Mr. Donald P. Disc Vice President - Engineering c/o Miss Catherine R. Seibert Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Disc:
SUBJECT:
FIRE PROTECTION SCHEDULAR RELIEF - NINE MILE POINT NUCLEAR POWER PLANT (UNIT 1)
We have completed our review of'our letter dated September 11, 19&1.
Prior to this time you had requested, and received NRC approval for, schedular relief regarding four fire protection modifications.
Of these four items, three have been completed.
Your letter requested fuither schedular relief for the remaining item, Fire Detection Systems.
We have reviewed your submittal and have decided to grant the requested extension in accordance with 10 CFR 50.48(d).
The fire detection system was to be installed by September 30, 1981.
However, in your letter you indicated that equipment delivery problems have resulted in a revised installation date of November 1, 1981.
Furthermore, you indicated that. preoperational testing might extend beyond November 1, 1981.
We have reviewed your efforts to obtain fire detection equipment in a timely fashion.
We have concluded that you have made a best effort and that your effort is considered good cause for granting schedular relief.
However, such relief cannot extend beyond November 17, 1981 in accordance with the requirements of 10 CFR 50 Appendix R.
Therefore, as ver bally agreed to by members of your staff, the fire detection system must be completely installed, preoperationally tested and functional by November 17, 1961.
In order to ensure public health and safety, you indicated that compensatory measures will be taken prior to detection system completion.
A high degree of early warning is already provided by normal plant tours, and security personnel make hourly tours of all main buildings within the plant.
In addition, operating and maintenance personnel make irregular tours for various reasons.
Finally, during system preoperational testing, fire watches will be posted as specified by Technical Specifications for removal from service of one extinguishing system.
We have concluded that these interim measures, in conjunction with plant procedures for the control of combustibles, adequately reduce potential fire 'damage to equipment required for safe plant shutdown.
OFFICE/
~
~ ~ ~ ~
~ ~
~
~ ~
~ ~ ~
SURNAME/
~ ~ ~ ~ ~ ~
821 0150590 8f0930'1 PDR ADQCK 05000220,i"-"
~.".
F PDR NRC OFFICIAL RECORD COPY
- USGFO: 19~29.824
g EV
~
M
~
~
A I
I'
~
I ft I
~"
~
I '
I
~
~
V 'r M
I I
I I"
M I
I lr I
EM V
I I
I MM n,t I
~
MP'M V'1 I
~
MII
"- <~
~
t1r. Donald P. Disc Based on our review, we conclude that Niagara mohawk's efforts to date and equipment unavailability are good cause for extending the fire (etection system completion date.
Furthermore, we conclude that such an extension will not adversely affect public health and safety.
Accordingly, pursuant to 10 CFR 50.48(d) the modification completion date has been extended to November 17, 1981.
The aforementioned interim measures shall remain in effect until preoperational testing has been satisfactorily accomplished, and the system has been declared operational.
A copy of the r elated Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is enclosed.
Sincerely, 0rigiaal Sg8d bf H.R. Qenton Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/encl:
See next page DISTRIBUTION:
DOCKET FILE NRC PDR Local PDR ORB ¹2 Rdg D. Eisenhut S. Norris P.
Polk.
OELD IE (3)
G.
Deegan (4).
B. Scha,rf (2)
TERA NSIC Gray File OFFICEI SURNAME/
oaTz f>
DL:ORB¹2 PPolk:ms 9/~ /81 0R~¹2~
SNdrr>s 9/4'//81 DL:OR 2
TAI it
~
PJ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
9
/81
~ ~ ~ ~ ~ ~ ~
~ I
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
D 085 TAam ach 9/3 /81
~ ~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~
~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~
~
T ov 9/
1 DGE' ut
/81 N
- DD
~ I
~ ~ ~
~ ~
~ ~
~ ~ t ~
EGC se
~ ~ ~ ~ ~ ~ ~
~
~ ~ ~
~
~
9/
81
~
~ I
\\ ~ ~ ~
~ ~ ~ ~ ~
~ ~
NR:
~ ~ ~
~ ~ ~
~
~ ~ ~
HRD on 9/
/81
~ ~ ~ ~ ~ o kf~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318 Ro/80) NRCM 0240 OFFICIAL RECORD COPY
- USGPO: 198~29-824
J, I F
4'I
~ tl
Mr. Donald P. Disc Niagara Mohawk Power Corporation CC:
Eugene B. Thomas, Jr., Esquire
- LeBoeuf, Lamb, Leiby 5 MacRae 1333 New Hampshire Avenue, tl.
W, Suite 1100 Washington, D.
C.
20036 T.
K. BeBoer, Director Technological Development Programs State of Hew 'York Energy Office Swan Street Building CORE 1 - Second Floor Empire State Plaza
- Albany, New York 12223 Mr. Robert P. Jones, Supervisor Town of Scriba R.
D.
-'4
- Oswego, New York 13126 Niagara Mohawk Power Corporation ATTN:
Mr. Thomas Perkins Plant Superintendent Nine Nile Point Plant 300 Erie Boulevard West
- Syracuse, thew York 13202 U.S. Environmental Protection Agency Region II Office ATTN:
EIS COORDINATOR 26 Federal Plaza New York, New York 10007 State University at Oswego Penfield Library - Documents
- Oswego, New York 13126 Resident Inspector c/o U.S.
NRC P. 0. Box 126
- Lycoming, New York 13093
~Yl4"'g
DOCKET NO; '50-'220 NIAGARA MOHAWK POWER CORPORATION NOTICE OF EXTENSION QF COMPLETION DATES By letter dated September ll, 1981 Niagara Mohawk Power Corporation (the licensee) requested that the U.S. Nuclear Regulatory Commission (the Commission) extend a completion date for the fire protection modifications for the Nine Mile Point Nuclear Station Unit 1 located in Osweqo County, New York.
'he fire detection system modification comple'tion date has been
,'extended to November 17, 1981.
. The Commission's Director of Nuclear Reactor Regulation has concluded that good cause has been shown and that such postponement will not adversely affect the public health and safety.
Accordingly, pursuant to 10 CFR 50.48(d) the request has been granted.
For further details with respect to this action, see (1) the licensee's request dated September ll, 1981 and (2) the Director's letter to the licensee dated which are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D.C.,
and at the Oswego County Office Building, 46 E Bridge Street,
- Oswego, New York 13126.
FOR THE NUCLEAR REGULATORY COMMISSION Dated at Bethesda, Maryland; this Harold R. Denton, Director Office of Nuclear Reactor Regulation
0 0