Docket No. 50-410
Spp
0 4 1SSl
>~Haxzxzg0~
Niagara
Mohawk Power Corporation
ATTN:
Mr. Gerald
K.
Rhode
Vice President
System Project
Management
c/o Miss Catherine
R. Seibert
300 Erie Boulevard,
West
Syracuse,
13202
Gentlemen:
Subject:
Inspection
50-410/81-08
tr)
e
/ 'i
J Ry~<<
This refers to the routine inspection
conducted
by Mr.
R. Feil of thi s
office on August 4-6,
1981 at Nine Mile Nuclear, Power Station,
Unit No. 2,
Scriba,
New York of activities authorized
by
NRC License
No.
CPPR-112
and
to the discussions
of our findings held by Mr. Feil with Mr. J. Dillon of
your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection
consisted
of selective
examinations
of
procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were observed.
In accordance
with l0 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the
NRC's
Public Document
Room.
If this report contains
any information that you (or
your contractors)
believe to be exempt from disclosure
under
it is necessary
that you (a) notify this office by telephone within ten
( 10) days
from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days
from the date of this letter
a written application to this office to withhold such information.
Consistent
with section 2.790(b)(l),
any such application
must be accompanied
by an
ffidavit executed
by the
o
er of the information which identifies the
R:DRPI:DRPI
R:DRPI
Fe i 1/wb
Kister
runner
8/27/81
8/ 8/81
8/2 /81
~gn)
~4
i ~OFFICIAL RECORD
COPY
,+Si09240526
Si0904
+i
~ PDR
ADOCK 050004i0
~G
J PDR~
Niagara
Mohawk Power Corporation
~~p 0 4
1981
document
or part sought to be withheld,
and which contains
a full statement
of the reasons
on the basis which it is claimed that the information should
be withheld from public disclosure.
This section further requires
the
statement
to address
with specificity the considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not
hear from you in this regard within the specified periods
noted above,
the
report will be placed in the Public Document
Room.
The telephone notification
of yout intent to request withholding, or any request
for an extension of
'the
10 day period which you believe necessary,
should
be
made to the Supervisor,,
Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required;
however, if you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
1
on
.
nner, Chief, Projects
Branch Pl, Division of Resident
and Project Inspection
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-410/81-08
cc w/encl:
Eugene
B. Thomas, Jr.,
Esquire
NMPC gA
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
State of New York
bcc w/encl:
Region I Docket
Room (with concur rences)
R. A. Feil, Reactor
Inspector
Chief, Operational
Support Section
(w/o encl)
OFFICIAL RECORD
COPY
0