ML17053C749

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-220/81-14 on 810605-11.No Noncompliance Noted
ML17053C749
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/09/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053C750 List:
References
NUDOCS 8107280456
Download: ML17053C749 (4)


See also: IR 05000220/1981014

Text

N~ II<0O

~4

0

Cy

n

C

O

~ ip

+~

go

++*++

Docket No. 50-220

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

63'I PARK AVENUE

KING OF PRUSSIA, PENNSYlVANIA19406

JUL

9

1SS)

IE FlLF ~M

Niagara

Mohawk Power Corporation

ATTN:

Mr. T.

E.

Lempges

Vice President

Nuclear Generation

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

50-220/81-14

.

<~Ql(pg ,

8 7tgat

e

This refers to the routine safety inspection

conducted

by Mr. J.

C. Higgins

of this office on June 5-11,

1981 at Nine Mile Point Unit 1 Nuclear Generating

Station, Scriba,

New York of activities authorized

by

NRC License

No.

DPR-63

and to the discussions

of our findings held by Mr. Higgins with Mr. T.

Roman

of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described

in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

Within

these areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

observations

by the

inspector,

and independent

calculations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or your

contractors)

believe to exempt from disclosure

under

10 CFR 9.5(a)(4), it is

necessary

that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter

a written application

to this office to withhold such information.

Consistent with Section 2.790

(b)(1), any such application must

be accompanied

by an affidavit executed

by the

owner of the information which identifies the document or part sought to be

withheld, and which contains

a full statement of the reasons

on the basis

which

it is claimed that the information should

be withhel'd from public disclosure.

This section further requires

the statement

to address

with specificity the

considerations

listed in 10 CFR 2.790(b)(4).

The information sought to be

withheld shall

be incorporated

as far as possible into a separate

part of the

8i0728045b 8i0709

PDR

ADOCK 05000220

8

PDR

ygnt

5](

J

w

L y

I

ll I

A

tI

Niagara

Mohawk Power Corporation

JUL

S

198l

affidavit. If we do not hear from you in this regard within the specified

periods noted above,

the report will be placed in the Public Document

Room.

The telephone notification of your intent to request withholding, or any request

for an extension of the

10 day period which you believe necessary,

should

be

made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215)337-5223.

No reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

unner, Chief, Projects

Br nch ¹1, Division of Resident

nd Project Inspection

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-220/81-14

cc w/encl:

T. Perkins,

General

Superintendent,

Nuclear Generation

T.

Roman, Station Superintendent

R. Abbott, Operations

Supervisor

E.

B. Thomas, Jr.,

Esquire

f

~