Docket No. 50-220
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
63'I PARK AVENUE
KING OF PRUSSIA, PENNSYlVANIA19406
JUL
9
1SS)
IE FlLF ~M
Niagara
Mohawk Power Corporation
ATTN:
Mr. T.
E.
Lempges
Vice President
Nuclear Generation
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
Inspection
50-220/81-14
.
<~Ql(pg ,
8 7tgat
e
This refers to the routine safety inspection
conducted
by Mr. J.
C. Higgins
of this office on June 5-11,
1981 at Nine Mile Point Unit 1 Nuclear Generating
Station, Scriba,
New York of activities authorized
by
NRC License
No.
and to the discussions
of our findings held by Mr. Higgins with Mr. T.
Roman
of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described
in the Office of Inspection
and Enforcement Inspection
Report which is enclosed with this letter.
Within
these areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
observations
by the
inspector,
and independent
calculations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were observed.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report contains
any information that you (or your
contractors)
believe to exempt from disclosure
under
10 CFR 9.5(a)(4), it is
necessary
that you (a) notify this office by telephone within ten (10) days
from the date of this letter of your intention to file a request for withholding;
and (b) submit within 25 days from the date of this letter
a written application
to this office to withhold such information.
Consistent with Section 2.790
(b)(1), any such application must
be accompanied
by an affidavit executed
by the
owner of the information which identifies the document or part sought to be
withheld, and which contains
a full statement of the reasons
on the basis
which
it is claimed that the information should
be withhel'd from public disclosure.
This section further requires
the statement
to address
with specificity the
considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be
withheld shall
be incorporated
as far as possible into a separate
part of the
8i0728045b 8i0709
ADOCK 05000220
8
ygnt
5](
J
w
L y
I
ll I
A
tI
Niagara
Mohawk Power Corporation
JUL
S
198l
affidavit. If we do not hear from you in this regard within the specified
periods noted above,
the report will be placed in the Public Document
Room.
The telephone notification of your intent to request withholding, or any request
for an extension of the
10 day period which you believe necessary,
should
be
made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215)337-5223.
No reply to this letter is required;
however,
should you have any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
unner, Chief, Projects
Br nch ¹1, Division of Resident
nd Project Inspection
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-220/81-14