ML17053C393

From kanterella
Jump to navigation Jump to search
Notifies That Requirements for Progress Repts Per IE Bulletin 75-04A,Item 6,is Terminated.Changes Related to Emergency Shutdown Are Either Complete or Completion Schedule Established
ML17053C393
Person / Time
Site: Nine Mile Point, FitzPatrick  
Issue date: 01/04/1977
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider R
NIAGARA MOHAWK POWER CORP.
References
IEB-75-04A, IEB-75-4A, NUDOCS 8103090388
Download: ML17053C393 (8)


Text

6D.S REGlpg Wp,0

++*<<4'NITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE

~

KING OF PRUSSIA, PENNSYLVANIA 19406 January 4,

1977 Niagara Mohawk Power Corporation

=

Attention:

Mr. R. R. Schneider

'Vice President Electric Operations

. 300 Erie Boulevard West

Syracuse, New York 13202.

Docket Nos.

50-220 50-333 Gentlemen:

Item 6 of IE Bulletin 75-04A required monthly progress reports for incomplete procedure changes and facility modifications resulting from the fire protection and. emergency shutdown procedure reviews which. were conducted following the Browns Ferry fire.

Fixe protection xeviews are now being handled by the Office of Nuclear Reactor Regulation (NRR) in accordance with Appendix A to Branch Technical Position 9.5-1.

The changes related to emergency shutdown are either complete or the completion schedule has been established.

For these reasons, the require-ment for progress reports in IE Bulletin 75-04A, Item 6 is hereby terminated.

Sincerely, Director cc:

George T, Berry, General Manager and Chief Engineer (PASNY)

Z, E. Chilazi, Manager of Projects, Thermal Power Generation (PASiK)

M, W, Hultgren, Manager, Nuclear Opexations (PASNY)

A. Klausman,

Manager, equality Assurance (PASNY)

T. E, Lempges,. General Superintendent, Nuclear Generation (NMPC)

R.

W, Smith., Plant Superintendent (NMPC)

J, D, Leonard,. Jx.,

Power Authority Resident Manager T, Roman, Operations Supervisor (NMPC)

M. C. Cosgrove,. equality Assurance Supervisor (PASNY)

T, J, Perkins, Station Superintendent G. L, Stuart, Operations Supervisor E. B, Thomas, Jr,, Esquire A, Z, Roisman, Counsel for Citizens Committee for Protection of the Enyironment E

(

l

bcc

'E Ha%1 6 Plies (For Appropriate Distribution)

. 'P Central Pilea.

'Public Document Room (PDR}

Local Public. Document.. Room (LPDR)

Huclear Safety Information Center (HSIC).

Tec1azical Information Center (TXC)

REG:I Reading Room State-.of Her York

Decker 17, 1976 Hfagara Mohawk Power Corporation Attention:

Hr. R. R. Schneider

. Vice President Electric Operations 300 Erie Boulevard liest

Syracuse, New York 13202

- Docket Hos. 50-220 50-333 Gentlemen:

n The enclosed Circular 76-07 is forrmrded to you for action. If there are any questions related to your understanding of the actions required, please contac't Chis office ~

Sincerely, James P

O'Reilly Director

Enclosure:

IE Circular 76-07 cc:

George T. Herry, General P nager and Chief Engineer (PASHY}

Z. E. Chilazi, Manager of Prospects, Therrl~al Power Generation (PAS~IZ)

M.

$f. Hultgren, kmnager, Nuclear Operations (PASIK)

A. 1Dausman,

Homager, Oual9.ty Assurance (PASNY)

T. E. Lcrnpgcs, General Superintendent, Nuclear Genexation (YBFC)

R. U. Smith, Plant Superintendent (RPC)

J. D. Leonard, Jr.,

Power Authoxity Resident Punster T. Roroan, Operations Supervisor (FG'C)

?f. C. Cosprove, Quality Assurance Supervisor (PAGE')

T. J. PerMns, Station Superintendent C. L. Stuart, Operations Supervisor F.. B. Thomas, Jr., Esquire

,A. Z. Roisman, Counsel for Citizens Conrmittce for Px'otection of the Euvironment DATE~

12/16/76 oFFlcE ~

~~'P 'C

~

)--;>>: u sUANAMEb.

Earker/.ll) d

<~izfgg Bxunner

)~ln3~~

0 eilly

k

e N&gnra Hobnail Power Corporation bcc:

XII BnH.

6 Plleo (Por hppropr5ate Diatr9bution) entra1 1~V.ea Public l)ocucant Room (PDR)

Loc~3. Public Doc~mant Roam (LPDR) liuclear Snooty Xx/ormatlon Center (ICSXC)

Technical Xnfornation Center (TXC) lU!Q:X Rcad9~g Room State oK He~ YorI OVACL>

SURNAMKW DATE+

I 4 I

'7 C