ML17053C108

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions
ML17053C108
Person / Time
Site: Nine Mile Point 
Issue date: 11/14/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lempges T
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8012040098
Download: ML17053C108 (2)


Text

gp,S REG(g P0 IC O

I

+g qP

+w*w+

Docket No. 50-220 Niagara Mohawk Power Corporation ATTN:

Hr.. T.

E.

Lempges Vice President Nuclear Generation 300 Erie Boulevard West

Syracuse, New York 13202 UNITED STATES NUCI EAR REGULATORY COMMISSION REGION I C

631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 November 14, 1980 CO ~

gf~

pg W+~ P~

J'1 4 "7 igSP P~

Gentlemen:

The enclosed IE Bulletin 80-23, "Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation" is forwarded to you for action.

No written response is required.

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.

Please estimate separately the manpower associated with corrective actions following identification of problems through the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, C8.

Boy e H. Grier Director

Enclosures:

1.

IE Bulletin No. 80-23 2.

List of Recently Issued IE Bulletins CONTACT:

D.

L. Caphton (215"337-5266) cc w/encl s:

T. J. Perkins, General Superintendent, Nuclear Generation T.

Roman, Station Superintendent R. Abbott, Operations Supervisor E.

B. Thomas, Jr.,

Esquire So>20.40oIE

% e E~e j

(

I a

~

J 1

h>

~ qp C

C t p fly