ML17053C107
| ML17053C107 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/14/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 8012040028 | |
| Download: ML17053C107 (2) | |
Text
~pg REq( fp0 4y 0O O+
/pn o~
+**++
~
~
UNITED STATES,.
NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYI.VANIA19406 November 14, 1980 Oocket No. 50-410 Niagara Mohawk Power Corporation ATTN:
Mr. Gerald K.
Rhode Vice President System Project Management c/o Miss Cathe~inc R. Seibert 300 Erie Boulevard, West
- Syracuse, New York 13202 CD Cl7t
~C~C
~V)~
Ql CW
~Pl
~CD Ctl Ch~
C)
Gentlemen:
The enclosed IE Bulletin 80-23, Failures of'olenoid Valves Manufactured by Valcor Engineering Coi poration" is f'orwarded to you for actioh.
No written response is. required; f
In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees:, it would be helpful'f you would provide an estimate of the manpower expended. in conduct of the review and preparation of the report(s) required by the Bulletin.
Please estimate separately the manpower associated with corrective actions;"following identification of'roblems through the Bulletin.
If you. desire additional information regarding this matter; please contact this office.
Sincerely, C8.
Boy e H. Grier Oirector
Enclosures:
1.
IE Bulletin No. 80"23 2.
List of Recently Issued IE Bulletins CONTACT:
O.
L. Caphton cc w/encl':C215-337-5266)
Eugene B.
Thomas, Jr.,
Esquire
t'~
C 1 1
Ck a 4 0
I'I f ~
'.-c iH g%
Pl