0 Docket No.:
50-410 t
DISTRIBUTION:
.Docket Fil e ~
RVollmer 8
~
w
",<<+.'><~I" (Q!ij)'I [:.. l..>>i: i, l
Nkc/PDR RMattson gpp L/PDR Knight LBPl Rdg RTedesco NRR Rdg VNoonan DEisenhut Hartfield, MPA
'Purple OELD JYoungblood OIE (3)
Niagara Mohawk Power Corpopatioy,
,,.KKIper ATTN:
Mr. Gerald K. Rhode' "DL'ynch '"'"'cc:
ACRS (16)
Vice President
" ""MRushbrook NSIC System Progect Manager 300 Erie Boulevard West
""'lRub'ens'te'in"
- Syracuse, New York 13202,
'" '"ASch'wericei
<XJ
'i e'r
'ear Mr. Rhode:
SUBJECT:
REQUEST FOR ADDITIONAL.I/FORMATIONPE>GAROIHG THE, PROPOSED COOL INGi TOWER FOR NIHE MILE POINT UNIT,2 In the course of our continuing review of, your report, on the ",Circulating Mater Cooling System Employing, a Natural,Draft, Cooling Tpwey",,Hated,,July 1/,,
- 1976, and your subsequent submittalsdated,September 30, 1977,.January 16,1978,,
and April l8, 1978 related to the yr'aposqd,cd)ing,tower we, have, identified a, need for additional informatiown;,to.update, your',report.
Our request for this information is contained in tPe, enclosure e to,this letter..
If you have any questions regaging this,requestfor additionalr,information, contact the project manager, Ke<<nnetg L, Kiper.,,.
Sincerely, Origiinal slgncd by.
Rob0rt L, Tcdcsco e>
Enclosure:
Additional Information Requested for the Cooling Tower Report Reviev, Nine Mile Point, Unit 2, Robert L. Tedesco, Assistant Director.
for Licensing Division of Licensing cc:
See next page
. ~,,
s u
s>>
OFFICE SURNAME DATE$
DL:LBIiIl
'KK~pe /1 s
~Dinch. ".
8/30/80 DLe 3
u gb ood'
/80 DL:A RLTe sco " -
8/g/80 NRC FORM 318 (9-76) NRCM 0240
~ AU.S. GOVERNMENT PRINTING OFFICE: 1979 289'369
ENCLOSURE ADDITIONAL INFORMATION RE VESTED FOR "THE('COOL'NG'OWER 'REPORT 'REVIEW NINE MILE POINT, UNIT 2 1.
Update the Cooling Tower Report, dated July 19, 1976, with respect to major design changes of the cooling tower system as described in sections 2.0 and 3.0 of your report.
Specifically, provide cooling tower dimensions,
- location, flow rate's, atmospheric design conditions,, a description of the circulating water treatment
- system, and other major design information that has changed since the report issuance.
2.
Forward copies of the following publications of the Oswego County Planning Board if current editions (since 1977) are available:
0 C
0 0~00:
1985550000 dll 01 3.
Provi'de the most current data available for the Nine Mile Point impact area (the towns of Mexico, Minetto, New Haven, Scriba, Volney and Richland; Osw'ego City; and Oswego County) for the following categories:
a)
Current population estimates b)
Population projections for 1990 c)
Acreage in farmland and in cropland (as a subcategory) d)
Assessed value, tax rates per
$ 100 assessed valuation, and amount of taxes levied (town and county).
4.,
Provide the most current data available for Oswego County for the following categories:
a)
Percentage distribhtion of land use categories, b)
Total number of farms with sales of $2500 and over, and the number with sales less than
$2500, c)
Total number of dairy farms Aith sales of $ 2500 and over in value of dairy products.
5.
6.
7.
Since the submittal of your 1976 report, have there been any changes to the primary network of highways in Oswego County?
Since
- 1976, have there been changes in the responsibilities for providing services at the Town and County levels?
Since the publication of Appendix C of your Environmental
- Review, hhve.any historical sites been added to the list?
8.
Have you applied for local tax exemption of the cooling tower as a pollution control device?
If so, has a determination been rendered by the State?
IJ
~ y 4
I
9.
Provide a schedule of constructing the cooling tower and the relationship of this schedule to the overall schedule of constructing the plant.
Also estimate the number of manual workers required to construct the tower and the total number necessary to construct the station, including those working on the tower.
Provide these estimates of workers for each quarter during the period of construction of the tower.
10.
In Section 5.0 of your 1976 report, you estimated the cost of the cooling tower to be approximately ten million dollars.
Provide a current estimate (in 1976 dollars) of the cost of the cooling tower, for comparison.
ll.
For substances which are to be added to the cooling system, provide the relevant water quality criteria and standards which have been established under the International Agreement on Great Lakes guality between the United States and Canada.
12.
Indi'cate the status of compliance of the waters of Lake Ontario in the vicinity of the station with these criteria and standards.
13; Indicate how discharges from the cooling system will affect concentrations of substances for which criteria or standards have been established.
I
~
(
EV Niagara Mohawk Power Corporation ccs:
Eugene B. Thomas, Esq.
- LeBoeuf, Lamb, Leiby 5 MacRae 1333 New Hampshire Avenue, N.M.
Suite 1100 Washington, D.
C.
20036 Anthony Z. Roisman, Esq.
Natural Resources Defense Council 917 15th Street, N.
W.
Washington, D.
C.
20005 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 13210 T,
K. DeBoer, Director Technological Development Programs New York State Energy Office Swan Street Building Core 1 - 2nd floor Empire State Plaza
- Albany, New York 12223 Resident Inspector
.Nine Mile Point Nuclear Power Station P. 0.
Box 126
- Lycoming, New York 13093
'"