ML17053B865
| ML17053B865 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/25/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lempges T NIAGARA MOHAWK POWER CORP. |
| References | |
| IEB-80-17, NUDOCS 8008270223 | |
| Download: ML17053B865 (4) | |
Text
6 IIEQy O~
o
+o
++*++
Docket No. 50-220 UNITED STATES
.LEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 16406 JUL25 $80 Niagara Mohawk Power Corporation ATTN:
Mr. T. E.
Lempges Vice President Nuclear Generation 300 Erie Boulevard West
- Syracuse, New York 13202 Gentlemen:
This letter confirms the call made to your office on July 24, 1980, in which we extended an invitation f'r members of your staff to attend a working level meeting at the Region I office to discuss your plant's as-installed configuration of the Control Rod Drive Systems shutdown discharge volume.and other matters associated with IE Bulletin 80-17, "Failure of Control Rods to Insert Fully During a Scram at a BHR," issued July 3, 1980.
The meeting will be held on August 5, 1980, at the Region I office in King of Pr ussia, Pennsylvania starting at 1:30 p.m.
It is expected to last approximately 13; hours.
One hour prior to the scheduled
- time, a taped presentation regarding the subject will be given by NRR personnel for those who wish to attend.
During your plant specific discussions, your staff attendees should be prepared to discuss in detail with members of IE and NRR staffs, the as-built condition of the subject systems.
Knowledgeable engineering and design personnel should be available for these'discussions.
Specifically, you should bring:
.1.
Marked up drawings showing as-bui,lt conditions which have been identified by walk-thru of the system (including pneumatic, hydraulic and electrical drawings).
2.
A system description including logic diagrams as necessary to show the operation of the system.
.3.
Preliminary recorrmendations for proposed changes-to the system.
4.
Engineering bases for the changes.
.5.
Interface requirements imposed on the A-E for the system designs.
6.
Interfaces with other systems.
Two copies of all information (including marked up drawings) presented by the licensee should be given to the staff prior to the start of the meeting.
SD 0 88vo ZZ3
0
Niagara Mohawk Power Corporation AL25 Bgg No reply to this letter is required;
- however, should you have any questions
~
concerning this meeting please contact Mr.
D. L. Caphton of this office, (215-337-5266).
Sincerely, ce H. Grier erector CC:
T. J. Perkins, General Superintendent, Nuclear Generation T.
Roman, Station Superintendent R. Abbott, Operations Supervisor E.
B. Thomas, Jr.,
Esquire