Text
ribution:
ocket NRC PDR Local PDR ORB Reading NRR Reading DEisenhut RPurple TNova k RTedesco GLainas JOlshinski JHeltemes, AEOD JULY 2 2 19M Docket No. 50-220 Hr. Donald P. Disc Vice President - Engineering c/o Miss Catherine R. Seibert Niagara Mohawk Power Corporation 300 Erie Boulevard Hest
- Syracuse, New York 13202
Dear Hr. Disc:
g; Q (a/~j5
~QL('g}ggE ~
D TAIppol ito SNorris PPol k OELD I&E (3)
Q, O'IGi~
SUBJECT:
REVIEH OF FIRE PROTECTION SAFETY EVALUATION SUPPLEtLENTARY ITEMS
'ince mid-1979, there has been an on-going review of supplementary items to the Nine Nile Point, Unit 1, Fire Protection Safety Evaluation (Amendment No. 33).
Our review of 'three of these open items has been recently completed while two items either are incomplete or are unacceptable.
Enclosure (1) is a listing of these five items.
Our review of the following items have been completed, and your position has been found, acceptable:
(1) 3.1.1. Fire Detection Systems, (2) 3.1.8(l) and 5.3.1.6, Diesel Generator Building Vedifications, and (3) 3.1.8(2), Protection of Structural Steel.
Our review of item 3.1.2, Sprinkler Systems, is incomplete at this time'.
Item 5.3.2.6, Diesel Generator Rooms, pertains to the relocation of elec-trical cabling.
In summary, we have found unacceptable your proposed
.alternative to encapsulate cabling in lieu of your original commitment to relocate the control cables for the 102 diesel generator.
He have reviewed the test results on the Pyrocrete encapsulation material which utilized a steel plate test specimen.
This test specimen is not,considered representa-tive of the proposed modification of encapsulating control cables.
Therefore.
the test results do not demonstrate that the encapsulation of the 102 control cables with Pyrocrete will provide an adequate level of fire protection.
Your final disposition of item 5.3.2.6 would be appreciated.
If we can be of further assistance,.please advise.
cc:
S.
Hudson V. Benaroya T. Ippolito
Enclosure:
Sincerely,
~F90@ WSned by,
+ 4 tWoao Thomas A. Ippoli@, Chief Operating Reactors Branch 02 Division of Licensing OFFICE $
SURNAME OATE)
,.... RB..SR....
PPolk;Q.,
7 /+2/80
...0.
XAlppo.l.i..o.
g/~0 SDO806 NRC FORM 318 (9-76) NRCM 0240
'kU.S. GOVERNMENT PRINTING OFFICE: 1979.289.369
4 4
4 4
>> r I
f 4 f
- 1. I 4
t tl tt
~ ~
4
~
f
~
I 4
~
~
M 4
e f
f I<
f r
I lt 1
I
~ 4' I
0 4 g J
I e
I
~
I I
I I
~
I I
4 I
,I I II I r,
~
I f
4 4
I f-i I
4 r
~ Mt ~
f 4
t' t
4 4
Hr. Donald P. Disc July 22, 1980 CC:
Eugene B. Thomas, Jr., Esquire
- LeBoeuf, Lamb, Leiby 8 MacRae 1333 New Hampshire
- Avenue, N.
W.
Suite 1100 Washington, D.
C.
20036 State University College at Oswego Penfield Library - Documents
- Gswego, New York 13126
Jle
0 Enclosure 1
FIRE PROTECTION REVIEW STATUS NINE MILE POINT - UNIT 1
DOCKET NO. 50-220 ITEM 3.1.1 3.1.8(1)/5.3.1.6 3.1.8(2) 5.3.2.6 3.
1.2 DESCRIPTION
Fire Detection Systems Diesel Generator Building Modifications Protection of Structural Steel Diesel Generator Rooms Sprinkler Systems STATUS LEGEND C -
Complete R -
Requirement I -
Incomplete - Staff review is not complete