ML17053B481
| ML17053B481 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 03/10/1980 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML17053B482 | List: |
| References | |
| NMP-2069, NUDOCS 8003170407 | |
| Download: ML17053B481 (8) | |
Text
REGULATORY IPRNATION DISTRIBUTION SYS" (RIBS)
ACCESSION NBR:8003170007 DOC ~ DATE: 80/03/10 NOTARIZED:. NO DOCKET FACIL:50 220 Nine Mi l e Point Nuclear Stat loni Uni t 1i Niagara Powe 05000220 AUTH INANE AUTHOR AFFILIATION LEMPGESiT,E, Niagara Mohawk Power Corp.
REC IP, NAME RECIPIENT AFFILIATION Office of Management and Program Analysis SUBJECT; Forwards monthly opetating rept for Feb 1980.
DISTRIBUTION CODE:
AOOSS COPIES RECEIYEDELTR
- t. ENCL g SIZEIX+~
TITLE: Annuaii Semi Annual 8 Monthly Operating Reports (OL Stag NOTES: WWWWWWWWWWWW$0WWIWIWWW80&WW~ WW~WOO&WW WOO&WWIWI%W~WWWWWWOWWWWW~&WWAIOOMWWWSOWIW&W~WWW RECIPIENT ID CODE/NAME, ACTION:
05 BC'0 INTERNALS 0
11 16 DIR DOR 19 REAC SAFT BR 21 EEB 23 EFFL TR SYS COPIES LiTTR ENCL 6
6 1
1 2
2 1
1 1
1 1
1 1
1 RECIPIENT ID'ODE/NAME I
=02 NRC PDR 10 MPA 18 ENGR BR 20 PLANT SYS BR 22 CORE PERF< BR AEOD COPIES LTTR ENCL' 1
2 2
1 1
1 1
1 1
1 1
EXTERNAL: 03 LPDR 1
1 2Q NATL LAB QgL 1
1 26 ACRS 15 15 04 NSIC 25 BROOKHAVEN 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 39 ENCL 39
'4 0
I
'\\
r t
F r
r r,
r$ rt I
'II'I II g
II Al t
I re'
r H
4" h
r f
l$
lr J
I 1
r r
r I
rr%
5
~
7%
'}
II 1
h r,g QL$
fl I
ll I'
fr r.
r
~
'7 NIIASAIRA 9 MQo~5fK NMP-2069 NIAGARAMOHAWKPOWER CORPORATlON/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 Matzch 10, 1980 Ome&o/L, 0((ace o) Managetneet In(o/Un~n and P/Log/1am Co~4 0~ed S~e5 Nuclea/L ReguJato/Ly CommL6aLon Na5kington, 0.
C.
20555 RE:
Docket No. 50-220 8PR-63 GeetEeme,n:
Sub~ed he/L~hks Che RepoM o) Oping SZ~Me5 and S~doln Expel'.ence
)o/L Februuuu/,
- 1980, (o/L Che N.ne (@Le Point NucLea/L S~on U~ <l.
AQo ~neXudedks a Narui~ve RepoM o) Oping Exp.ence (o/L Che moeth.
Vefcy ~y go~,
Thomu E.
Lempge5 V~ce Prce54.deci'ueLea/L Gen~on je/
~chme~
xe,:
Ome&o/L, 0(pce o) ISE (10 copie5)
<A II
~ s Iu
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT /11 NARRATIVE OF OPERATING EXPERIENCE FEBRUARY 1980 The station operated with a monthly availability factor of 97.5% and a net design electrical capacity factor of 83.2%.
During the entire month
/315 Reactor Recirculation Pump was out of service and isolated due to mechanical problems.
Availability and capacity factor losses were due to the following:
l.
Unit was removed from service and reactor shutdown and depres-surized to perform Core Spray Isolation Valve Quarterly Sur-veillance Test.
2.
Unit was reduced to 77% power due to tube failure of a high pressure feedwater heater.
3.
One brief evolution of condenser circulating water reverse flow operation due to intake tunnel icing, requiring load reduction for reverse flow and return-to-normal flow manipu-lations.
4.
Various control rod pattern changes due to core physics and LHGR considerations.
MAINTENANCE ON CLASS I E UIPMENT FEBRUARY 1980 1.
11
& 12 Control Rod Drive inlet filters 2.
Condensate supply-system to Control Rod Drive Pumps 3.
Replaced air supply filters for instrument air dryer system.
OPERATING DATAREPORT OPERATliVG STATUS
- 1. Unit Name:
Nine Mile Point Un '
- 2. Repor ting Period:
2/1/80 2/29/80
- 3. Licensed Thermal Popover P1Nt):
- 4. Namephte Rating (Gross ilIWe):
640 5." Design Electrical Rating (Net hilVe):
- 6. ~1aximuw Dependable Capacity (Gross MWe):
- 7. liiazimuin Dependable Capacity (Net 451'LVe):
Notes DOCKET NO.
DATE 3/l480 CO~IPLETED IIY ~~rkins f
TELEPIIOiVE ~~~].].0, Ext;. 1312 S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, lfAny (iVct ibIWe):
- 10. Reasons For Restrictions, IfAny:
This!i!onth Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (4~1 WH)
- 18. Net Electrical Energy Generated (tIWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using 4iIDCNet)
- 22. L'nit Capacity Factor (Using DER iVet)
- 23. Unit Forced Outage Rate
- 24. Shutdoivns Scheduled Over Next 6 3iiontlis 86 0
679 0
0 1423 0
12 4.2 64233.5 0
1 110 385 371 911 359,140 97.5
- 84. 6
- 83. 2 0
8.8
- 90. 5 89.1 0
72.
- 60. 1
- 59. 2 9.2 IType. Date. and Duration oi'ach,'.
2 437 657 104 179 059 822 894 34 332 404 795, 493 33, 245, 258
- 25. IfShut Dovvn At End Of Report Period. Estiinatcd l)ate of Startup:
- 26. Unit~ ln Test Status (I'rior to Consmercial Opcratio>t):
Forecast Achieved INlTIALCItITICALITY liVITIAL ELECTRICITY CORDI ERCIAL Ol'L'RATION
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-220 Nine klile Point 81-.
REPORT MONTH February 1980 Ext. 1312 Dale t I J
H)
'J
~ CC
~
C/7 Liccnsec Event Report >
E<
4I Cl Vl v) G c~
o ~
C Q Q
Cause Ec Corrective Action to Prevent Recurrence 80-7 800209 80-8 800219 Core Spray I.V. Quarterly Test Reduction to 77% power due to failure of /I125 (High Pres.)
Feedwater Heater F; Forced S: Scheduled
('>/77)
Reason:
A.Equipment Failure (Explain)
B.hlairttenance or Test
( -Refueling D-Regulatory Restriction I'. Operator Training h. Lice>>sc Exanlinalion F-Admi>>istrative G.Operational Error (Fxplain)
I I.Other (Explain) 3
~ hiethod:
I.hlanual 2.Manual Scram.
3.Automatic Scratn.
4-Other (Explain)
Exhibit G - Instructions for Preparation ol'ata Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6 I )
Exhibit I
~ Same Source
I AVERAGE I)AILYUNIT POKER LE%'EL
'e
~
DOCKET NO.
UNIT -Nine Mile Point f/1 DATP March 4, 1980 Cp'ilpiiTEp SY T.J. Perkins TELEPI IDEE 315-343-2110,
.=Ext. -13l2 DAY AVERAGE DAILYPOKER LEVEL.
(NIKe-'k et I 582 DAY AVERAGE DAILYPOKER LEVEL (1(h'c Net>
593 17 583582'S 585 557 10 12 I'3 15 16 570 570 565 240 405 519 581 589.
5 3
596 30 23 o5 26 8$
30 31 468 471 471 472 473 473 473 472 467 469 INSTRUCTIONS On tlrrs Cvrrnat. list the averatic daih'nit pnkvcr level in ~1%r c.Nct fnr each day in tire rcinsrt>>ty. rrr>>rrlr. (."s>>rrpwtc to the nearest ivhole'megaivat t.