Confirms Items to Be Accomplished for Completion of Requirements in IE Bulletin 79-14, Seismic Analysis for As- Built Safety-Related Piping Sys, Per 791220 Telcon
ML17053B375
Person / Time
Site: Nine Mile Point 
Issue date: 01/04/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider R
NIAGARA MOHAWK POWER CORP.
References
IEB-79-14, NUDOCS 8002050233
Download: ML17053B375 (2)


Text

R~0

~o Cy

+o

  • <<~

Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 JAN 4 1980 Niagara Mohawk Power Cor por ation ATTN:

Mr. R.

R. Schneider Vice President Electric Operations 300 Erie Boulevard West

Syracuse, New York 13202 Gentlemen:

NRC review of your Bulletin 79-14 responses dated November 7, 1979 and December 7, 1979 which provide an update schedule for completion of Bulletin 79-14 requirements has been completed.

Based on this review and a telephone conversation between Mr. Baunack of this office and Mr. Perkins of your staff on December 20, 1979, we understand that the following will be accomplished:

a.

The remaining inspections required by Bulletin 79-14 will be completed before March 31, 1980.

b.

A report will be submitted with the final results of the inspection within 30 days of the completions of the inspection.

c ~ If the seismic qualification of any safety system piping or component is shown to be improper, the plant will be placed in the cold shutdown con-dition either within 7 days of identification of any such uncorrected item or as specified in Technical Specifications, whichever is less.

d.

Should such a shutdown (Item c. above) occur, the facility will remain in the cold shutdown condition until corrective action on the identified component is completed.

If our understanding of your planned action described above is not in accordance with your actual plans and actions being implemented, please contact this office by telephone or in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of this letter.

Sincerely,

)

Boyce H. Grier Director CC:

T.J. Perkins, Station Superintendent