Forwards IE Insp Rept 50-410/79-08 on 791106-08.No Noncompliance Noted
ML17053B361
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/11/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053B363 List:
References
NUDOCS 8001310324
Download: ML17053B361 (4)


See also: IR 05000410/1979008

Text

6P,0 8600

Wp

+

O~C0O

l

0

/'+*++

ocket No. 50-410

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA> PENNSYLVANIA19406

gEg i% 919

Niagara

Mohawk Power Corporation

ATTN:

Mr. G.

K. Rhode

Vice President

System Project Management

300 Erie Boulevard,

West

Syracuse,

NY

13202

Gentlemen:

Subject:

Inspection 50-410/79-08

This refers to the inspection

conducted

by Mr. R. A. McBrearty of this office on

November 6-8, 1979 at the Nine Mile Point Nuclear Station, Unit 2, Scriba,

New

York of activities authorized

by NRC License

No.

CPPR-112

and to the discussions

of our findings held by Mr. McBrearty with Mr. R. A. Norman of your staff at the

conclusion of the inspection,

and to a subsequent

telephone

discussion

between

Mr. R. A. Norman of your staff and Mr.

R. A. McBrearty on November 15, 1979.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,-

and observations

by the

inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section 2.790 of the

NRC's "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection

report will be placed in the

NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

be

accompanied

by an affidavit executed

by the owner of the information, which

identifies the document or part sought to be withheld,

and which contains

a

statement of reasons

which addresses

with specificity, the items which will be

considered

by the

Commission

as listed in subparagraph

(b) (4) of Section

2.790.

The information sought to be withheld shall

be incorporated

as far as

possible into a separate

part of the affidavit. If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document

Room.

800 181 0B~+

Niagara

Mohawk Power Corporation

No reply to this letter is required;

however, should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

r

Robert T. Garison,

Chief

Reactor Construction

and Engineering

Support

Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-.410/79-08

cc w/encl:

Eugene