Docket Ho. 50-220 In developing these critetia, we have considered verbal cotIIments provided by representatives of the Hark I Owners Group on a draft of the criteria issued August 2, 1979.
These comments were presented to the staff during a meeting held on August 15, 1979, and supplemented by additional information provided in a letter from General Electric dated September 7,
1979.
This information and internal comments by the staff and our consu'Itants have resulted in "some modifications to the draft criteria.
However, others of the Owners Group recommendations were not adopted f'r the HRC criteria, based on the staff',s judgment relative to the interpretation qf specific data or analyses.
In certain cases, the staffI's generic criteria identify specific hydro-dynarI~ic load assessment techniques that will have to be evaluated on a plant-specific basis.
However, deviations from any other generic criteria should be avoided.
Distr ibution
~ocket.
OCTOBER 3 1 579 ORB N3 Local PDR NRC PDR DEi senhut RVollmer WGammill BGrimes JNiller Nr. Donald P. Disc LShao Vice President - Engineering Atty, OELD Niagara Nohawk Power Corporation OIaE (3) 300 Erie Boulevard Hest TERA
Dear Nr. Disc:
SSheppard PPolk RE:
ACCEPTANCE CRITERIA FOR THE NARK I COfttAPBQ']Eiky LONG TERN PROGRAM The staff has completed its review of the generic aspects of the Nark I Containment Long Term Program (LTP).
The results of this review are reflected'in the enclosed acceptance criteria, which are intended to be used to perform individual plant-unique analyses for each Nark I facility.
These criteria have been developed from the staff's evaluation of the Nark I LTP Load Definition Report, Plant Unique Analysis Appli-cations Guide, and related suppression pool hydrodynamic exper imental and analytical
- programs, which have been submitted by the Hark I Owners Group.
The criteria also identify additional experimental verification that must be obtained for "condensation oscillation" load uncertainty.
This requirement was coiitmunicated to you earlier in our letter dated October 2, 1979.
OFFICE $.
SURNAME DATEP.
NRC FORM 3IB IF 76) WRCV 02-'".
'79X '080KB@"
5-
,I.S GOVEAN"'-ENT +PINTING OFFICE; l979 2B9.369
ll I
j
\\
Pgj ';,
g=gfilf) $ e~k kt t 'e II, I
%t kJ k
I
I tfr. Dor 'ld P. Disc Mfthfn 30 days of your receipt of'his letter, we request that you provide the schedule for submittal of the LTP plant-unique analysis for your facility.
In developing this schedule, you should consider that we are continuing to target the completion of this program and the te'rmfnatfon of the exemption issued for your facility for Decer&er 1980.
The staff presently expects to issue the generic Safety Evaluation Report supportfng these criteria fn December 1979.
Should you have any questions regarding this action contact C.
Gr fmes (301-492<<8204).
Enclosure:
As stated Darrell G. Efsenhut, Acting Director Division of Operating Reactors cc ri/enclosure:
See next page OFFICE $
SURNAME DATE$
RB g3 Polk:mjf 10/g/79 ORB k'080//79 DOR CGrimes 10@/79 AD'P tlG 10
/79 D:DO D
e 1
79 NRC FORM 318 (9.76) NRCM 0240 AU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
q~
~ N
'V
~
~
Mr; Donald, P. Disc.
Niagara Mo)jawk Power Cor'poratian CC:
Eugene B. Thomas, Jr., Esquire
- LeBoeuf, Lamb, Leiby I% MacRae 1757 N Street, N.
W.
.D.
C.
20036 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street, N.
W.
Washington, D.
C';
20005 Oswego County Office Building 46 E. Bridge Street
- Oswego, New York 13126