Forwards IE Insp Rept 50-220/79-12 on 790417-20.No No Noncompliance Noted
ML17053B057
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/09/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider R
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053B058 List:
References
NUDOCS 7910040226
Download: ML17053B057 (4)


See also: IR 05000220/1979012

Text

o)>>

4

6gII REQ(g

~4

0

g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIAN PENNSYLVANIA19406

Docket No. 50-220

NJt'8 ma

Niagara

Hohawk Power Corporation

ATTN:

Nr.

R.

R. Schneider

Vice President

Electric Operations

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

. Inspection

50-220/79-12

This refers to the inspection

conducted

by Mr.

R. Paolino of this office on

April 17'-20,

1979, at Nine Nile Point Unit 1 Nuclear Generatin'g Station,

Scriba,

New York; of activities authorized

by

NRC License

No.

DPR-63 and to

the discussions

of our findings held 6y Hr. Paolino with Nr. T..Perkins

and

other members of your staff at the conclusion of the inspection.

Areas= examined during this inspection are described in the. Office of

Inspection

and Enforcement Inspection

Report which is enclosed with this

letter.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If

this report contains

any information that you (or your contractor)

believe

to be proprietary, it is necessary

that you make

a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must

be accompanied

by an affidavit

executed

by the owner of the information, which identifies the document or

part sought to be withheld, and which contains

a statement

of reasons

which

.addresses

with specificity the items which will be considered

by the

Commission

as listed in subparagraph

(b)(4) of Section 2.790.

The information sought

to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

P

No reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be'pleased

to discuss

them with you.

Sincerely,

obert T. Carlson,

hief

Reactor Construction

and Engineering

Support Branch

Enclosure:

Office of Inspection

and Enforcement Inspection

Repor t

Number 50-220/79-12

cc w/encl:

T. E.

Lempges,

General

Superintendent,

Nuclear Generation

.T.,J. Perkins, Station Superintendent

C.

L. Stuart,

Operations

Supervisor

E.

B. Thomas, Jr.,

Esquire

A. Z. Roisman,

Natural

Resources

Defense

Council (Hithout Report)