3' 87g Docket No. 50-220 ter. Donald P. Disc Vice President - Engineer ing
, Niagara tloha~4 Power'orporation 300 Erie Boul evard
- West
- Syracuse, New York 13202
Dear Hr. Disc:
In 1974, the NRC requested that all power reactor licensees submit standard administrative control requirements.
One of these requirements called for the direct supervision of core alterations by a licensed Senior Reactor Operator (SRO) who had no concurrent duties.
~
I'ection 6.2.2 of the Nine fhile Point Unit No.
1 Technical Specifications specifies that:
(1) a Senior Licensed Operator shall be responsible for all movement of new and irradiated fuel within the'site boundary; and (2) all fuel moves within the core shal'l be directly monitored by a member of. the reactor analyst group.
Th1s does not satisfy the requirement of an
- SRO, without concurrent duties, supervising core alterations.
The NRC examination for a Senior Reactor Operator covers core alterations while the examination for a Reactor Operator d'oes not.
Therefore, a Senior Reactor Operator knowledgeable in the affects of core alterations should direct refueling activities,.
During a major outage the currently requi red Senior Reactor Operator (assigned as the Shift Supervisor) can only devote a portion of time to any single activity because of the large number of activities for which'he is responsible.
For example, the administrative burden on the Senior Reactor
~ Operator (Shift Supervisor) during a refueling outage includes several categories of work such as plant modifications, planned m'aintenance, preventative maintenance, annual
- overhaul, and in-service inspections.
tetany additional personnel are often assigned to the station during a major
- outage, which adds further burden for compliance with security requi rements.
Due to this, one Senior Reactor Operator cannot'jive refueling activities the attention that they warrant'.
Therefore, a second, suitably qualified, person should be provdded so>ire~t those activities.
Accordingly', we request that you propose a change to your Technical Specifications to adopt the wording:
ALL CORE ALTERATIONS =shal I be Dlv~i,
,reso SURNAIaE'gw' superv 1 se r,.:Operator..L nsibilities d y e1 er a
mif;ed..to..Fuel.
ring this ope 1cense en1 Hand.1.ing, wh at i,on.
r eac or pe a or,, or en
.has..no..othen concurrent,......
~ v ~ r
~ ~ ~ ~
HRC PORM 318 (9.76) NRCbf 0240 Q V,e, OOVERNMENt PIIINTINO OWIvIC~ I Iee ~
S ~ S lee
R I
'I V
I 4
Hr.
'Donald P. Disc
/
Your,application for this 1 icense amendment should be submitted liithin 90 days.
If'ou have any questions concerning this request, please contact Philip J.
Polk on (301) 492-7872.
Sincerely, Original Signed by T. A. Ippollto
~
Thomas A. Ippolito, Chief Operating Reactors Branch 83 Division of Operating Reactors CC:
see next page DISTRIBUTION:
Docket NRC PDR Local.PDR ORBg3 Rdg NRR Rdg DEisenhut RVollmer TJCarter WRussell BGrimes WGammill LShao JNiller TIppol ito SSheppard PPolk OELD OI8E (3)
JRBuchanan TERA ACRS (16)
File F
F IP
'rFrIrCa~
OUANAMCW OArK~
RB83 PPolk:acr,'
7/ p
/79 0
Tpoi o pg j79
~
~
I ~
I
~ \\
~ ~ F ~ ~
. NRC'PORM 318 (976) NRCM 0240 4 v.s. oovcosMaar io<Nr>rco or< scar >ere - rs ~
roe
4i< ~"j i<
C h
Mr. Donald P. Disc Niagara Mohawk Power Corporation CC:
Eugene B. Thomas, Jr.,
Esquire
- LeBoeuf, Lamb, Leiby 8 MacRae 1757 N Street, N.
W.
.D.
C.
20036 Anthony Z.
Roisman Natural Resources Defense Council 917 15th Street, N.
W.
Washington, D.
C.
20005 Oswego County Office Building 46 E. Bridge Street
- Oswego, New York 13126
Ce~
~g