ML17053A886

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Revision 1, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML17053A886
Person / Time
Site: Nine Mile Point 
Issue date: 07/18/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rhode G
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 7908060388
Download: ML17053A886 (2)


Text

Docket No. 50-410 t

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 JgL 18 1979 Niagara Mohawk Power Corporation ATTN:

Mr.

G.

K.

Rhode Vice President System Project Management 300 Erie Boulevard, West

Syracuse, New York 13202 Gentlemen:

IE Bulletin No. 79-14 that was issued on July 2, 1979, is being revised to limit the scope of work required.

The changes are indicated on the enclosed replacement page No.

2 for the Bulletin. If you desire additional information regarding this matter, please contact this office.

Sincerely, oyce H. Grier Director

Enclosure:

1.

IE Bulletin No. 79-14 Revision 1

cc w/encls:

Eugene B. Thomas, Jr.,

Esquire

'F908060+Pg