ML17053A885

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-14,Revision 1, Seismic Analysis for As-Built Safety-Related Piping Sys. Action Required
ML17053A885
Person / Time
Site: Nine Mile Point 
Issue date: 07/18/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider R
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 7908060385
Download: ML17053A885 (2)


Text

0 Op A.

I nO O

~/

ie

++*++

Docket No. 50-220 Q

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 JUL 18 1919 cga(~Z~Pc~

i Niagara Mohawk Power Corporation ATTN:

Mr.

R.

R. Schneider Vice President Electric Operations 300 Erie Boulevard West

Syracuse, New York 13202 Gentlemen:

IE Bulletin No. 79-14 that was issued on July 2, 1979, is being revised to limit the scope of work required.

The changes are indicated on the enclosed replacement page No.

2 for the Bulletin. If you desire additional information regarding this matter, please contact this office.

Sincerely,

~r~~~~

Director Encl'osure:

1.

IE Bulletin No. 79-14 Revision 1

cc w/encls:

T.

E.

Lempges, General Superintendent, Nuclear Generation T. J.
Perkins, Station Superintendent C.

L. Stuart, Operations Supervisor E.

B. Thomas, Jr.,

Esquire A. Z.

Roisman, Natural Resources Defense Council y908060+ ~

li g