Text
~8
~4
Cy
REOy~
~o
0
Ol
~O
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KINC OF PRUSSIA~ PENNSYLVANIA 19406
Docket No. 50-220
JUN i i ]gag
Niagara
Mohawk Power Corporation
ATTN:
Mr. R.
R. Schneider
Vice President
Electric Operations
300 Erie Boulevard ttest
Syracuse,
13202
Gentlemen:
Subject:
Inspection
79-10
This refers to the verification tests
performed during an inspection
conducted
by Mr. J. Kottan of this office on September
25-27,
1978 at
the Nine Mile Point Nuclear. Station, Unit
1 of the activities authorized
by NRC License
No.
The results of that inspection
are contained
in our letter dated October
20,
1978 which includes Office of Inspection
and Enforcement Inspection Report
No. 50-220/78-14.
The results of certain verification tests
made at the time of that
inspection are included in the Office of Inspection
and Enforcement
Report which is enclosed with this letter.
Other aspects
of the inspection
were. previously discussed
in the above referenced
correspondence.
Within the scope of this inspection,
no items of noncompliance
were
observed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letter and the
enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information that you (or your contractor)
believe to be proprietary, it is necessary
that you make
a written
application within 20 days to this office to withhold such information
from public. disclosure.
Any such application
must
be accompanied
by an
affidavit executed
by the owner of the information, which identifies the
document or part sought to be withheld, and which contains
a statement
of reasons
which addresses
with specificity the i'tems which will be
considered
by the Commission
as listed in subparagraph
(b) (4) of Section
2.790.
The information sought to be withheld shall
be incorporated
as
far as possible into a separate
part of the affidavit. If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document
Room.
1
0
Niagara
Mohawk Corporation
No reply to this letter is required;
however,
should you have
any
questions
concerning this inspection,
we will be pleased
to discuss
them
with you.
1
Sincerely,
Ge
.ge H. Smith, Chief
Fu
1 Facility and Materials Safety
anch
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report Number 79-10
cc w/encl:
T. E. Lempges,
General
Superintendent,
Nuclear Generation
T. J. Perkins, Station Superintendent
C. L. Stuart,
Operations
Supervisor
E. B. Thomas, Jr., Esquire
A. Z. Roisman,
Natural
Resources
Defense
Council (Without Report)
)
/
I
f
j