ML17053A516
| ML17053A516 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/17/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider R NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053A513 | List: |
| References | |
| NUDOCS 7903220327 | |
| Download: ML17053A516 (4) | |
See also: IR 05000220/1978015
Text
~S REOII.
~C
"'o
0O
0
ce
o~
+et*<<+
Docket Ho~BO-2
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
JAH17 Brg
Niagara
Mohawk Power Corporation
ATTN:
Mr. R. R..Schneider
Vice President
Electric Operations
300 Erie Boulevard West
Syracuse,
13202
Gentlemen:
Subject:
Inspection 50-220/78-15
This refers to your letter dated
December
1, 1978, in response
to our
letter dated
November 9, 1978.
Based
on the information provided in your letter dated
December 1, 1978,
and telephone
conversations
between
Mr. J.
P. Stohr and Dr. M. Shanbaky
of this office and Mr. T. Lempges of your staff on January
3 and 4,
1979, item A will be considered
as
a licensee identified item.
Our
records will be modified to reflect this change..
However, it is our
understanding
that all the environmental
water samples will be analyzed
at your contractor's
laboratory until your proposed
environmental
laboratory
is completed,
so
as., to ensure
an acceptable
level of analytical sensitivity.
With regard to item B, based
on the above conversation, it is our under-
standing that the referenced
procedure will be further modified with
consideration
to operator action so as to ensure that flow reversal
operations
do not cause
the Technical Specification 2.1.5 temperature
limits to be exceeded.
With regard to items
D and
E, your interpretation
has
been
reviewed
and
has
been found to be incor rect.
The eight hours, within any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
period,
do not have to be consecutive.
Therefore these
items will
remain
as items of noncompliance.
Please
provide this office, within
twenty (20) days,
as previously requested,
a written response
including:
(1) corrective steps
which have
been taken by you and the results
achieved;
(2) corrective steps
which will be taken to avoid further items of
noncompliance;
and (3) the date
when full compliance will be achieved.
Thank you for informing us of the corrective
and preventive actions
documented
in your le'tter and discussed..in
the aforementioned
telephone
conversations.
These actions will be examined during
a subsequent
inspection of your licensed
program.
~ 9 0 g g S 0~ 3-7
~~
~
Niagara
Mohawk Power Corporation
2
Your cooperation with us is appreciated.
Sincerely,
gr
Ge
ge~H. Smith, Chief
Fu
1 Facility and Materials Safety
ranch
CC:
T. E.
T. J.
C. L.
E.
B.
A. Z.
Lempges,
General
Superintendent,
Nuclear Generation
Perkins, Station Superintendent
Stuart, Operations
Supervisor
Thomas, Jr., Esquire
Roisman,
Natural
Resources
Defense
Council