ML17053A417
| ML17053A417 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/30/1979 |
| From: | Ippolito T Office of Nuclear Reactor Regulation |
| To: | Dise D NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 7902150096 | |
| Download: ML17053A417 (6) | |
Text
0 NNUARY 3 0 tee Docket Ho. 50-220 Mr. Donald P. Disc Vice President - Engineering Hiagra Mohawk Power Corporation 300 Erie Boulevard tfest
- Syracuse, New York 13202
Dear Hr. Disc:
DISTRIBUTION:
Docket File NRC PDR L PDR ORB83 Rdg VStello BGrimes TJCarter TIppolito PPol'k SSheppard RVollmer
- Attorney, OELD OISE (3)
TERA JRBuchanan ACRS (16)
Your submittal of September 1, 1978, as supplemented January 19, 1979, relating to your plans to install a radioactive waste solidification and handling system at the Nine Mile Point nuclear Station Unit No. 1, is being reviewed by our staff..
In order to complete our review, you are, requested to provide by March 1, 1979 the additional information identified in the enclosure, or provide a schedule for when such information wi11 be available.
Sincerely,
Enclosure:
Request for Additional Information cc w/enclosure:
See next page omas A Ippolito, Chief Operati g Reactors Branch N Division of Operating Reactors 790 S X50 V4 OF@I DUIIHAl4II~
3-"DOR
~ ~ ~
0 ~ ~ ~ i
~
~
Polk:cb 7goi'l9'""'-ORB
~
~
~ 0 ~
p01.7 to l7m77'9'"'"
~
y ~ ~ I ~ ~
~ ~ ~ ~ ~
~ ~ ~ ~
0 ~
0 ~ ~ ~ ~ ~
0
~ ~ ~ ~ ~ ~ ~ ~
KZC PORK 3l8 (976) NRC5f 0240 5 U 0 OOVCIINMCNTPIIINTINO ONNICCI I ~ 1 ~
f<$
TO ~
~
4 I tl4
~ ~
4 tj 44
Niagara Mohawk Power Corporation cc:
Eugene B. Thomas, Jr., Esquire
- LeBoeuf, Lamb, Leiby 5 MacRae 1757 N Street, N.
W.
Washington, D.
C.
20036 Anthony Z. Roisman Natural Resources Defense Council 917 15th Street, N.
W.
Washington, D.
C.
20005 Oswego County Office Building 46 E. Bridge Street
- Oswego, New York 13126
v3 0
ENCLOSURE 1 RE UEST FOR ADDITIONALINFORMATION 1.
Provide a sketch to scale and with dimensions showing location of construction site and proposed building in relation to other existing facilities for NMP-1.
2.
Provide a dimensioned sketch of the proposed building cross-section showing existing grade, depth of foundation (wi'th. respect to surface soil and bedrock),
and proposed finished grade.
3.
How much spoil will be generated from the excavated area and how will it be disposed of?
4.
You indicate that discharges from the NMP-2 site runoff control system will be sampled in accordance with. New. York. State Department of Environmental Conservation (NYSDEC) site runoff control criteria.
What are these criteria?
What parameters will Ge sampled and with what frequency' 5.
Provide detailed references for the construction controls that are in the NMP-2 ER (Question 1.A.4) similar to those provided for questions 1.A.1 and 1.A.2.
6.
Compare the airborne, non-radiological emissions from the propos'ed radwaste incinerator/calciner to emissions from other sources at the K6'-1 site, particularly startup boilers, emergency diesels and station heating.