Responds to Plans for Installation of Radwaste Solidification & Handling Sys.Forwards Request for Addl Info W/Response Required by 790119.Summarized or Reference Response Is Acceptable
ML17053A380
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/05/1979
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Dise D
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 7901170355
Download: ML17053A380 (10)


Text

II ~A Docket Ho. 50-220 JAN 5 1979 Mr. Donald P. Disc Vice President - Engineering Hiagara Mohawk Power Corporation 300 Erie Boulevard 1<est

Syracuse, Hew York 13202

Dear Mr. Disc:

Distnbution

.Qocket

~ORB P3 Local PDR

- HRC PDR VStello BGrimes TIppolito

/Sheppard PPolk

Attorney, OELD OI&E (3)

DEisenhut TERA

'JRBuchanan ACRS (16)

By letter dated September 1, 1978, as'amended by letters of November 30 and December 13, 19?8 you informed -us of. your-plans to install a radio-active waste solidification and handling system.

The proposed systems are to be installed at the Nine Nile Point Unit 1 Huclear Station.

Your letter of llovember 30, 1978 indicated that Hiagara Mohawk has deter-mined that this modification does not involve an unreviewed safety question as defined in 10 CFR 50'. 59(a).

In order for us to verify this determination, you are requested. to provide written responses for the.

items identified in Enclosure 1 Jy January 19, 1979.

Please note that these questions were previously forwarded to you informally on December 12, 1978 due to the tightness in timing as dictated by your February 1979

. const uction start date.

In an effort to accelerate the process, it may be determined that the requested information has already been developed for the construction of Hine tJile Point Unit 2.

Thus, the information could be sumiarized briefly with an accompanying reference. or citation to allow our access'o more detailed ihformation.

If we can be of further assistance, please advise.

Sincerely,

Enclosure:

Request for Additional Orlglnal signed by Thomas A. Ippolito, Chief Operating Reactors Branch 83 y~

. Division of Operating Reactors orriccW CC OURNAMNQQ OATlf~

Vfe'aid'1'O'S'u'r'e'!"

"nQ+t ~gQ

~ ~ ~ ~ ~

BB..N.........

~

~

PPol k: mjf 1/ 0/79 Incog n

1//79 NRC PORN 518 (9.76) NRCM 0240

+ U,I, OOVNNNMCNI'NINTINOOrrICCIl ~ 1 ~ Mii 'I ~ 0

~ $

tliagara hohawk Power Corporation cc:

l!r.,'-.'erber'an Schaach Oswe" County Bui 1 d', ng

-':6 E. 2ridce Stree'.

Oswego, hew York 13125 January 5,

1978

!ls. Andria Dravo Subcoi i ttee on Energy and

=nvironment

'.3"7 Loncworth Avenue s'i sh1l 970n)

D.

C.

20~15

.".r. ;rank R.

Church Town o= Scriba

.cri a

municipal

="u; loing R.

D. =2, Crea.,e.v Road "ox /6

Osweco, l'ew York 13126

<'=.,es I ~,

1 V

4'

~

Rest, Chairman
".v1 =w Dv1 ve cn, i'iew Yol k 13069

.ho;.as C. Elsasser S=a.e L'aison Of=icer

'~.

S. iiuclear Regulatory Cor;aission,

.=,ec-ion 1

31

."-ark Avenue King of Prussia, Pennsylvania 19406 hr. Pobert D. Ltessels Director, Office of Environmental Plannin9 thew York State Public Service Commission Hew York State Empire Plaza

Albany, New York 12223

."r. Thomas Cashman Environm n.al Conservation Department "0 "GIT Road

'lbanv,

'le>i York

'r.

T.

K. DeBoer Dir ec=.or, Tecnnical Development Programs Sta e Gf thew York nergy OTfice Acency Bui 1 ding 2

E-,.;"ire S=ate Pl-za tl="':, York 12 23

C

";:a"ara l';.":;:-wk Power Corporation January 5,

1978 C'".:

. Robert Deyle County Plannina Board Coun-y Bui iding Bridce Street

Csweco, hew York 13126

."r. Paul l'. rges

.':ew York S.a e Depa r:went of

= r vi ron:

.,an ta 1 Cons erva tion no I >cno nvenu

,'es.e'.n I'-=-;
York Service Group

-'.; =any,

."=-'~; York 12208

.".r. 'a'..;: lb raer "ew York S:a:

"=n ray Office Rocke7e l I=". Plaza

-'.'any,,'i=:; York 12223

.;-:.sr. i n";.

s

=". Cochran al.=,eso.rces Defense Council, 5th S;rect, N,

ncton, 0.

C.

20005 Inc.

-ucene

"-. Tho-:as, Jr.,

Esquire Le"-oeuf, La-,b, Leibv 5 YacRae

757 t'tree.,

N.

t,'.

~ashing-.on, D.

C.

20036 An hony Z.

Roisman natural Pesources Defense Council 917 15th Street, N.

R.

washington, D.

C.

20005 Oswego County Office Building 46 E.

Bridae Street

Oswego, ti v York 13126

REQUEST FOR ADDITIONAL INFORfATION TO NIAGARA HOHAWK POWER CORPORATION ON RADIOACTIVE WASTE SOLIDIFICATION AND HANDLING SYSTEHS FOR NINE HILE POINT UNIT 1 NUCLEAR POWER PLANT I.

Construction A.,

Provide adequate description of the proposed project and its interaction with the environment to establish the magnitude of any construction impact and the adequacy of the construction impact control provisions.

We would suggest running through a check list similar to that required for a CP and provide:

1, an analysis and evaluation of pertinent information as to:

the nature of the environment, including topographical, geological, meteorological and hydrological characteristics; 2.

usage of ground and surface waters in the general area; 3.

the nature and location of other potentially affected facilities; 4.

procedures to be observed to minimize the risk of unexpected or adverse environmental impacts of construction including:

dust control smoke control erosion control and control of mud and sediment pest control noise control chemical (soil additives and construction chemicals) and solid waste (including spoil and debris disposal) control control of vehicular movement and traffic flow dewatering control of petroleum products (diesel fuel, oil and lubricates, etc.)

facilities for washing concrete mixers and haul trucks vegetation, restoration and landscaping

B.

Describe the nature and extent of the proposed construction.

Consider the following:

1.

type and time duration of construction practices, including:

clearing grubbing grading facility construction restoration 2.

location and size of construction site; 3.

rainfall distribution and frequency; 4.

chemical properties and geology of subsurface soil to extent necessary to identify hazards associated with runoff; 5,

number of people and type of heavy machinery linked with construction.

II.

~0eration A.

Provide adequate description of non-radiological air-and water-borne releases and their dispersion and potential impact on the site environs to demonstrate that attention has been given to the planning of facility operation.

Identify users of air and water that might be affected adversely.

Tdentify and provide other permits and approvals necessary for operation of this facility.

C.

Provide a statement placing the impacts of the proposed project in perspective with the impacts associated with construction and operation of Nine Nile Point 2.

g7 t