ML17053A358

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-220/78-19 on 781113-14.No Noncompliance Noted
ML17053A358
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/29/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider R
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17053A359 List:
References
NUDOCS 7901100046
Download: ML17053A358 (4)


See also: IR 05000220/1978019

Text

~g ~500

~o

nO

/g

R

O

Y/

+0

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PfNNSYI VANIA 19406

Docket No. 50-220

ttOY 29

1918

Niagara

Mohawk Power Corporation

ATTN:

Nr., R.

R. Schneider

Vice President

Electric Operations

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

50-220/78-19

This refers to the inspection

conducted

by Nr. A. Finkel of this office

on November

13-14,

1978, at Nine Nile Point Nuclear Station, Unit 1,

Scriba,

New York, of activities authorized

by

NRC License

No.

DPR-63 and

to the discussions

of our findings held by Nr. Finkel with Nr. T.

Lempges

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described

in the Office of

Inspection

and Enforcement

Inspection

Report which is enclosed with this

letter.

Within these areas,

the inspection consisted

of selective

examinations of procedures

and representative

records',

interviews with

personnel,

and observations

by the inspector.

r

Within the scope of this inspection,

no items of noncompliance

were

observed.

In accordance

with Section

2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and the

enclosed

inspection report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that you (or your contractor)

believe to be proprietary, it is necessary

that you make

a wri-tten

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must

be accompanied

by an

affidavit executed

by the owner of the information, which identifies the

document or part sought to be withheld, and which contains

a statement

of reasons

which addresses

with specificity the, items which will be

considered

by the Commission

as listed in subparagraph

(b)(4) of Section

2.790.

The information sought to be withheld shall

be incorporated

as

far as possible into a separate

part of the affidavit. If we do not

hear from you in this regard within the specified period,

he report

will be placed in the Public Document

Room.

7 9 0 1 1 0 0 O'{4

l)

Niagara

Mohawk Power Corporation

2

No reply to this letter is required;

however,

should you have any questions

concerning this inspec'tion,

we will be pleased

to discuss

them with you.

Sincerely,

Robert

. Carlson,

Chief

Reactor Construction

and Engineering

Suppor t Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-220/78-19

cc w/encl:

T.

E.

Lempges,

General

Superintendent,

Nuclear Generation

T. J. Perkins, Station Superintendent

C. L.'tuart, Operations

Supervisor

E.

B. Thomas, Jr.,

Esquire

A. Z. Roisman,

Natural

Resources

Defense

Council

(Without Report}