Letter Responding to the February 15, 1975 Correspondence Concerning the Steam Quenching Vibration Phenomenon and Advising an Investigation Is in Progress and Will Be Submitted by May 30, 1975
ML17037C458
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/27/1975
From: Rhode G
Niagara Mohawk Power Corp
To: Lear G
Office of Nuclear Reactor Regulation
References
Download: ML17037C458 (6)


Text

'

NRC D 'TRIBUTION FOR PART 50 DOCKE IATERIAL (TEMPORARY FO Riot)

CONTROL NO:

FILE fRQM:

Niagara Mohawk Power Cor DATE OF DOC

Syracuse, Ntt

3-27-75 DATE REC'0 3-,31-75 LTR TWX RPT OTHE R TO:

CLASS Mr Lear UNCLASS XXXXX PROPINFQ ORIG one signed INPUT CC OTHER NO CYS REC'D 1

~

SENT AEC PDR SENT LOCAL PDR DOCKET NO:

50-220 DESCR IPTION:

Ltr notarized 3-27-75....advising that tge3r are reviewing the possible neci%sity of a.

possible Tech Specs change with regard to ste quenching vibration phenomenon...re our 2-15-7 s

1'tr ~

~

~

~

~

~

(40-cys ltr rec'd)'PLANT NAME: Nine Mile Pt jfP1 ENCLOSURES:

FOR ACTION/INFORMATION 3-31-75 BUTLER (L)

W/ Copies CLARK (L)

W/ Copies t'wrt tf t L)

W/ Copies KNI EL (L)

W/ Copies SCHWENCER (L)

ZIEiblANN (L) "

W/ Copies IV/ Copies STOLZ (L)

DICKER (E)

W/ Copies

'.V/ Copies V+SSALLQ (L)

KiutGe Tviu (E j W/ Copies W/ Copies PURPLE (L)

YOUNGBLOOO W/ Copies W/ Copies REGAN (E)

SV/ Copies EAR (Li itVQCopies St &L>

W/ Copies (E)

W/ Copies INTERNALDISTR I BiJTION REG Fl R

~ OGC, ROO.'.i P-506A

~OSS i CK/STAF F CASE GIAI'1BUSSO BOYD

. MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE EG OPR F I LE 5 R EG ION (2)

T.R. WILSON STEE LE DENTON G R IMES GAMiMI LL KASTNE I BALLARD SPANGLER TECH REViE'.V SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLQ HOUSTON NOVAK ROSS IPPOLITO TEDESCO LOiNG LAIN AS BENAROYA VOLLMiER ENVIRQ MULLEf DICKER KNIG I.ITOiV YQUNGBLQQD REGAN PQOJECT LDR

~Jar c n HAR LESS R.

H.

E.

P.

J.

M.

S.

M.

S.

M.

H.

V.

R.

LIC ASST DIGGS (L)

GEARING (I )

GOULBOURNE (L)

KREUTZER (E)

LEE (L)

MAIGRET (L)

REED (E)

SERVICE (L)

SHEPPARD (L)

SLATER (E)

SMITH (L)

TEETS (L)

WI LLIAMS (E)

Wl LSON (L)

INGRAM (L)

A/T IND BRAITiVAN SALTZiUAN MELTZ P LAb'S MCDONALD CHAPiAAN DUBE (Ltr)

E. COUPE PETE RSOiiI HARTFI"LD (2)

KLECKER EISE NHUT WI6 G I NTOsN EXTERNAL DISTRIBUTION

~ LOCAL PDR 4KM~~O)

W1 T!C (ABE R NATHY)

(1) (2) (10) NATIONALLABS

~1 NSI C (BUCHANAN) 1 W. PEN!!INGTON, Rni E 201 GT 1 ASLB 1

CONSU LTAsNTS 1 Newton Anderson NEWMARK/BLUPIE/AG GABI AN

~l9-ACRS H8~446//SENT '

PD R-SAN/LA/s~!Y 1 BROOK!!AVEi~) is!IXT LAB 1 G. ULR IKSOIV!, CR.'s L 1 AGiv'IED (RUTH GUSS;vlAN)

Rrn B-127 GT 1 J. D. RUNKLES, Rrn E.201 GT

~

~

~

4

~

NIAGARAMOHAWKPOWER CORPORATION

))III'",

NIAGARA ~

MOHAWK 300 ERIE BOULEVARD, WEST (LI ~ SYRACUSE, N. Y. 13202 pOCEOW'yIIIIC MwVI>>>>"

QOlik>

~celOg H\\dl Section Mr. George Lear, Chief Operating Reactors Branch 83 Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re:

Nine Mile Point Unit 1 Docket No. 50-220

Dear Mr. Lear:

'his letter is in response to your February 15, 1975 correspondence concerning the steam quenching vibration phenomenon.

Technical Specifications 3.3.2 and 4.3.2, as presently incorporated in the operating license for Nine Mile Point Unit 1, provide adequate limits for suppression chamber water temperature.

These specifications include the provision that reactor temperature be brought below 215 F within ten hours if suppression chamber water temperature limits are exceeded.

Surveillance requirements for water temperature and suppression chamber integrity are also provided.

In additi'on to these specifications, operating procedures require a visual inspection of the suppression chamber in the unlikely event that a relief valve should fail to reseat normally.

P

Mr. George Leatr U. S. Nuclear Regulatory Commission Page Two March 27, 1975 We are presently investigating whether or not new requirements, in addition to those contained in our February 15, 1974 submittal, may be desirable to ensure suppression chamber integrity.

The results of this investigation will be submitted by May 30, 1975.

Very truly yours, Gera d K. Rhode Vice President-Engineering 1

l GH/sz CERTIFIED HAIL RETURN RECEIPT REQUESTED Subscribed and sworn to before me this 27 day of March, 1975.

r C c~-mm~w C

x/

Notary Public HAZEL J. CARRICK Notary Public in tho Stato oi Now cwork Qualified in Onon. Cn. Ro...

~~rt My Commisaion bpircs March JO,I~J'74

1 l

t I

\\

f

,I