ML17037C154
ML17037C154 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 03/03/1966 |
From: | Ewart J Niagara Mohawk Power Corp |
To: | Boyd R US Atomic Energy Commission (AEC) |
References | |
Download: ML17037C154 (4) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML22314A2262022-11-10010 November 2022
[Table view]E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22292A1032022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Tables 2B-8 Through 2B-38 ML22292A0982022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-35, Joint Distribution of Wing Direction and Speed ML22292A0822022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1 Thru 1.2-19 Sheet 2 ML22292A0732022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 02, Appendix 2B Table 2B-39 ML22292A0812022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 Through 4.6-9 ML22292A1382022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 18, Figures ML22292A0852022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B Table 2B-40 Thru 2B-55 ML22292A1302022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Figures ML22292A1082022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.2-1 Thru 3C.3-3 ML22292A1162022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Table 2B-38, Joint Distribution of Wind Direction and Speed Location 100 Ft ML22292A1052022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-110 Through 2H-42 NMP1L3339, R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership2020-04-24024 April 2020 R. E. Ginna Station - Constellation Energy Group, LLC: Notification of Change in Indirect Ownership ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018A9612018-01-18018 January 2018 Preservice Inspection Plan ML17037C6892017-02-0606 February 2017 Table 7.2-1, Process Pipelines Penetrating Primary Containment, 1 of 6 ML17037A6592017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-4-1 Through T-4-12, Plate 5-3 ML17037C6832017-02-0606 February 2017 Table 7.2-1, Isolation Signal Codes (Cont'D) 6 of 6 ML17037C5692017-02-0606 February 2017 Plate 5-10A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-8 Through T-4-10 ML17037C5672017-02-0606 February 2017 Plate 5-10 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-4-1 Through T-4-7 ML17037C6912017-02-0606 February 2017 Table 7.2-1 (Cont'D) 3 of 6 ML17037C5662017-02-0606 February 2017 Plate 5-9A - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-9 and T-3-10 ML17037C5652017-02-0606 February 2017 Plate 5-9 - Diagram Showing Relationship Between Dip of Bedding and Depth Borings T-3-1 Through T-3-8 ML17037C5642017-02-0606 February 2017 Plate 5-1 - Composite Site Stratigraphic Column ML17037C5632017-02-0606 February 2017 Plate 4-10 - Cross Section CT-2 West Wall Cooling Tower Piping Trench ML17037C5622017-02-0606 February 2017 Plate 4-9 - Geologic Plan View of Fault Cooling Tower Piping Trench ML17037C5612017-02-0606 February 2017 Plate 1-2 - Composite Site Stratographic Column Showing Position of Overcome Borings in Relation to Site Stratigraphy ML17037C7582017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037A6662017-02-0606 February 2017 Relative Pollen Percentages, Spores and Miscellaneous Microfossil Abundance, Plate 1-3 ML17037A6622017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-3, Plate 5-11 ML17037A6582017-02-0606 February 2017 Stratigraphic Correlation Chart Borings T-3-1 Through T-3-10, Plate 5-2 ML17037A6632017-02-0606 February 2017 Structural Comparison of Fault Zone in Boring Series T-4, Plate 6-12 ML17037A7152017-02-0606 February 2017 Figure 6-3, Response Test Strip Chart for Unstable Condition. ML17037A7012017-02-0606 February 2017 Table 7.2-1 (Continued) ML17037C6922017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML17037C7592017-02-0606 February 2017 Table 7.2-1 (Cont'D) 6 of 6 ML17037C7792017-02-0606 February 2017 Table 7.2-1 Isolation Signal Codes(Cont'D) 6 of 6 ML17037C7822017-02-0606 February 2017 Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6 ML17037C7852017-02-0606 February 2017 Table 7.2-1 (Cont'D) 4 of 6 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML12138A1352012-05-0707 May 2012 Reactor Pressure Vessel Head Weld Flaw Evaluation - Response to NRC Request for Additional Information ML12045A3892012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3962012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML12045A3942012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3932012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3922012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 1 of 2 ML12045A3912012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 2 of 2 ML12045A3902012-01-13013 January 2012 EPIP-EP-001, Attachment 1 EAL Matrix Unit 1, Page 1 of 2 ML12045A3872012-01-13013 January 2012 EPIP-EP-002, Attachment 1 EAL Matrix Unit 2, Page 2 of 2 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2022-11-10 Category:Letter MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024
[Table view]Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01 |
Text
h f
h NIAGARA MOHAWK POWER CORPORATION h
hi>',ll"
'IAGARA I I<IOHAWK 0 BUFFALO, NEW YORK 14203 Qo 6
'arch 3, 1966
~
\
Mr. Roger S. Boyd, Chief Research 8z Power Reactor Safety Branch Division of Reactor Licensing United States Atomic Energy Commission Washington, D. C. 20545
Dear Mr. Boyd:
Attached is a table of the data requested in your letter of February 16, 1966. This information is based on our current fuel design. We do not expect significant changes but some may occur before core design is made fina1.
No material withdrawals will be required before the second quarter of fiscal year 1967. There wi11 be no returns of special nuclear material until fiscal year 1968.
Very truly,yours, N. Ewar t Chief System Project Engineer ZNE:jfr Attach
<r ~
h
<" c.-. c~
C!) '1 J>>
t'
. h,; <hh, h!
+~ Q)II'(~Q'A%I
a ~-~
Material Transfers Wei hts in K Withdrawals<" Transfers From AEC to AEC Fiscal Year Quarter U-235 U-235 1967 0 0 662 0 1328 0 443 0
~" 71. 5% of total withdrawn from AEC is at 2. 32% enrichment.
The remaining 28. 5% of total is at 1. 33% enrichment.
Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No. 1
r~
)
0 g 4V
~~~
l
~ f 4
I ~