))A DATE NINE MILE POINT NUCLEAR STATION UNXT 1 740305 Co)IPLETED BY T ~ J

~ Perkins - Station Superintendent OPERATING STATUS 1.

REPORTING PERIOD:

740201 To 740228 GROSS HOURS IN REPORTING PERIOD:

672 2.

CURRENTI.Y AUTHOR17ED POWER LEVEL IfWTt 1850 MWe-NET 610 4.

REASONS FOR RESTRICTIONS (IF ANY):

Unavailability of second stage reheater limits maximum steam flow.

THIS CUMULATIVE MONTH YR-TO-DATE TO DA'l'E 5.

HOURS REACTOR WAS CRXTICAI.... ~..... ~2 14.15 Not available 6.

HOURS GENERATOR ON-I.INE

~

~

~

~

~

~

~

~

~

~

672 1415 24 779.8 7.

GROSS THF!Q(AL PO'IlER GENERATED ()SN))

~

~

~

1 165,966 2 470 013 38 833 796 8.

GROSS ELECTRICAL PO'NER GENERATED ()600

~

~

~

397,128 840 453 12 807 536 9.

NET ELECTRICAL PO'llER GENERATED ()SN))....

385,107 815,422 12,409,914 10.

REACTOR AVAILASILITFFACTOR (I) 100 100 Not available ll.

PLANT AVAILABILITYFACTOR (2) 4 12.

PLANT CAPACITY PACTOR (3) 13.

FORCED OUTAGE RATE'(4).

~

~

~

~

~

v 100.

93. 9

~ 0 100 94.5 65.3 53.6 16.13 v

,)F.

v ~

'14 ~

SHUTDOWNS SCIIEDULED TO'BEGIN XN"NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OP EACH):

Second'major refueling 'outage from 740329 to 740524.

15.

16.

v v

XF SHUTDOWN AT END OF IMPORT PERIOD, ESTI".IATED DATE OP STARTUP:

N/A PLAiVTS,IN TEST STATUS (PRIOR TO Coi~flfERCIAL OPERATXoiV)

REPORT THE FOLLOI47ING:

DATE LAST DATE' REASON'OR FORECAST ACHIEVED DIFFERENCE XNXTIAL CRITICALITY INITIALELECTRICAL, POWER GENERATION fl COKIERCXAL OPERATION v ~"

I v

I

'v vl v v

(1)

REACTOR AVA'II.ABILITYFACTOR = IIOURS REACTOR WAS CRITICAL GROSS HOURS IN RI',PORTING PERIOD

~100 (2)

PLANT AVAIL'ABII,ITYI'ACTOR = HOUI'S GI'.NFRATOR ON-LINC

'*100 GI'OSS HOURS IV REORTXNG PERIOD

)

(3)

PLANT CAPACITY FACTOR = NET El.rCTRTCAI, POWER CI:.NERATITD CUI',REN'I'I.Y LICENSED POWER I.EVEI. GROSS IIOURS IN REPORTING PERIOD (4)

FORCED OU) TAGE RATE ='ORCED OUTAGE HOURS

  • 100 IIOURS GENERATOR ON-I.INE + FORCED OUTAGI: HOURS

~100

4 ~

I II I

r 0

SUM(ARY:

Station operated with no shutdowns during this reporting period.

UNIT NA!K Nine Mile Point Nuclear Station Unit l.

DATE 740305 COMPLETED BY T. J. Perkins

>> Station Superintendent REPORT MON1%

74O2 NO.

DATE TYPE F-FORCED S-S CHEDULED DURATION (HOURS)

REASON (1)

MET:":OD OF SHUTTING DOWN THE REACTOR (2)

COMMENTS (1)

REASON:

A-EQUIPMENT FAILURE (EXPLAIN)

B-MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL FRROR (EXPLAIN)

(2)

METHOD:

A-HA';lUAL B-K&UAL SCRA~i C-AUTOiitATIC SCRA.1

) )'4

~H E

DATE COMPLETED BY CLOSURE A 1

740228 T. J. Perkins DAILY PLANT POWER OUTPUT MONTH FEBRUARY, 1974 DAY AVERAGE DAILY Mfe-net DAY

/

AVERAGE DAILY 'Ni7e-net 4

580 575

~t?

573 579 579 25 26 27'8 29 30 579 580 10 13 l4'5 16 18(

19 20 21 22 23 24

'73 580 579 579 577 577 566

~ 483

'545 580 580 580 C)~

579

o

~

Ir A

~