))A DATE NINE MILE POINT NUCLEAR STATION UNXT 1 740305 Co)IPLETED BY T ~ J
~ Perkins - Station Superintendent OPERATING STATUS 1.
REPORTING PERIOD:
740201 To 740228 GROSS HOURS IN REPORTING PERIOD:
672 2.
CURRENTI.Y AUTHOR17ED POWER LEVEL IfWTt 1850 MWe-NET 610 4.
REASONS FOR RESTRICTIONS (IF ANY):
Unavailability of second stage reheater limits maximum steam flow.
THIS CUMULATIVE MONTH YR-TO-DATE TO DA'l'E 5.
HOURS REACTOR WAS CRXTICAI.... ~..... ~2 14.15 Not available 6.
HOURS GENERATOR ON-I.INE
~
~
~
~
~
~
~
~
~
~
672 1415 24 779.8 7.
GROSS THF!Q(AL PO'IlER GENERATED ()SN))
~
~
~
1 165,966 2 470 013 38 833 796 8.
GROSS ELECTRICAL PO'NER GENERATED ()600
~
~
~
397,128 840 453 12 807 536 9.
NET ELECTRICAL PO'llER GENERATED ()SN))....
385,107 815,422 12,409,914 10.
REACTOR AVAILASILITFFACTOR (I) 100 100 Not available ll.
PLANT AVAILABILITYFACTOR (2) 4 12.
PLANT CAPACITY PACTOR (3) 13.
FORCED OUTAGE RATE'(4).
~
~
~
~
~
v 100.
- 93. 9
~ 0 100 94.5 65.3 53.6 16.13 v
,)F.
v ~
'14 ~
SHUTDOWNS SCIIEDULED TO'BEGIN XN"NEXT 6 MONTIIS (STATE TYPE, DATE AND DURATION OP EACH):
Second'major refueling 'outage from 740329 to 740524.
15.
16.
v v
XF SHUTDOWN AT END OF IMPORT PERIOD, ESTI".IATED DATE OP STARTUP:
N/A PLAiVTS,IN TEST STATUS (PRIOR TO Coi~flfERCIAL OPERATXoiV)
REPORT THE FOLLOI47ING:
DATE LAST DATE' REASON'OR FORECAST ACHIEVED DIFFERENCE XNXTIAL CRITICALITY INITIALELECTRICAL, POWER GENERATION fl COKIERCXAL OPERATION v ~"
I v
I
'v vl v v
(1)
REACTOR AVA'II.ABILITYFACTOR = IIOURS REACTOR WAS CRITICAL GROSS HOURS IN RI',PORTING PERIOD
~100 (2)
PLANT AVAIL'ABII,ITYI'ACTOR = HOUI'S GI'.NFRATOR ON-LINC
'*100 GI'OSS HOURS IV REORTXNG PERIOD
)
(3)
PLANT CAPACITY FACTOR = NET El.rCTRTCAI, POWER CI:.NERATITD CUI',REN'I'I.Y LICENSED POWER I.EVEI. GROSS IIOURS IN REPORTING PERIOD (4)
FORCED OU) TAGE RATE ='ORCED OUTAGE HOURS
- 100 IIOURS GENERATOR ON-I.INE + FORCED OUTAGI: HOURS
~100
4 ~
I II I
r 0
SUM(ARY:
Station operated with no shutdowns during this reporting period.
UNIT NA!K Nine Mile Point Nuclear Station Unit l.
DATE 740305 COMPLETED BY T. J. Perkins
>> Station Superintendent REPORT MON1%
74O2 NO.
DATE TYPE F-FORCED S-S CHEDULED DURATION (HOURS)
REASON (1)
MET:":OD OF SHUTTING DOWN THE REACTOR (2)
COMMENTS (1)
REASON:
A-EQUIPMENT FAILURE (EXPLAIN)
B-MAINT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL FRROR (EXPLAIN)
(2)
METHOD:
A-HA';lUAL B-K&UAL SCRA~i C-AUTOiitATIC SCRA.1
) )'4
~H E
DATE COMPLETED BY CLOSURE A 1
740228 T. J. Perkins DAILY PLANT POWER OUTPUT MONTH FEBRUARY, 1974 DAY AVERAGE DAILY Mfe-net DAY
/
AVERAGE DAILY 'Ni7e-net 4
580 575
~t?
573 579 579 25 26 27'8 29 30 579 580 10 13 l4'5 16 18(
19 20 21 22 23 24
'73 580 579 579 577 577 566
~ 483
'545 580 580 580 C)~
579
o
~
Ir A
~
I 7