ML17037B629
| ML17037B629 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/02/1977 |
| From: | Rhode G Niagara Mohawk Power Corp |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| Download: ML17037B629 (4) | |
Text
I NRC FORM,195 U.B. NUCLEAR REGUI.ATORV CO~SION I2.78)
<NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL DOCK T NUMBER 0 FILE NUMBER TO:
c'r.
George Lear I.ETTER RIGINAL OCOPV DESCRIPTION NOTOR IZED CLASSIFIEO PROP INPUT FORM ENCLOSURE FROM:
Niagara Mohawk Power Corp'yracuse, New York.
Gerald K
Rhode DATE OF DOCUMENT 5/2/77 DATE RECEIVED 5/5/77 NUMBER OF COPIES RECEIVED t ski aBO I Ltr furnishing infoi regarding the Unit No. 1.Containment Integrated leakage Rahe Testing Programo
~ ~ ~
~
~
iSIQÃOP gg~O~
I
~,
~
~*
I
~ 'i
~
PLANT NAME:
Nine Mile Point Unit'No.
1
. ACKNOWI.< GKD i
SAFETY i ASSIGNED AD:
FOR ACTION/INFORMATION N
'P ~
~
C
. '0 ~
PROJECT IIANAGER'IC ASST V
~ 1
. NRC PDR I&E OELD GOSSICK & STAFF MIPC CASE HANAUER HARLESS PROJECT MANAGEMENT BOYD PE COLLINS HOUSTON PETERSON MELTZ HELTEMES SKORIOLT INTERNALDIST
~ SYSTEMS SAFETY HEINEIIAN SCHROEDER ENGINEERING MACARRY BOSNAK SDlWFIL PAWLICK REACTOR SAFE ROSS
.NOVAK ROSZTOCZY CHECK AT & I SALTZMAN RUTIIFRG RI BUTJON PLANT SYSTEMS'EDF.S0 0
IP PORTO KHQ OPERATING REACTORS STELLO OPERATING TECH EISENHUT B
.E
.S SITE SAFE ENID ERNST BALLARD SPANGLER SITE TECH GA&IILL STEPP HULMAN SITE ANALYSIS VOLLIIER BUNCH J ~ 'OLLINS "KREGF.R LPDR me TIC:
NSIC!
ASLB:
EXTERNAL DISTRIBUTION NA~TIAB REG V.IE LA PDR CONSULTANTS:
ACRS CYS QQbBB%/
E T NRC FORM 195 12 78)
B QQIhVERBS,T~&4 ULRIKSON OR CQ ROL NUMBER P Pl~4 oZ>4
A\\
NIAGARA MOMAWK POWER CORPORATION NIAGARA~
MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N.Y. IS202 May 2, 1977
+r>
Director of Nuclear Reactor Regulation Attention:
Mr. George Lear, Chief Operating Reactors Branch g3 U.
S. Nuclear Regulatory Commission Pfpp>
Washing ton, D.
C.
20555
'<Og
>@i-~
Re:
Nine Mile Point Unit 1
~
P~~
Docket No. 50-220 DPR-63 Gentlemen:
During an April 5, 1977 meeting with members of your staff, the Nine Mile Point Unit 1 Containment Integrated Leakage Rate Testing Program was discussed.
Your staff requested specific clarifying information concerning the 1975 Containment Test.
During the subject test, preliminary examination of the.
data indicated that leakage was exceeding the acceptance criteria.
Upon inspection, it was found that tube leaks existed in two,of the containment spray heat exchangers.
The leaking tubes were plugged and a successful retest was made.
In order to prevent this occurrence from happening
- again, local testing of the containment spray heat exchangers will:be performed at least once each operating cycle.
As indicated, in our letter of March 2,
- 1977, the next containment integrated leak rate test will be performed during the Fall 1978 refueling outage.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION G raid K.
ode Vice President ngineering CVM/sjz 7 7/44 dgA4
'I f4
%r C
kL
+
ouJ V7~
D~
Vl Wv)
UJ~
F~~
~f>>
~C