ML17009A354
| ML17009A354 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 01/09/2017 |
| From: | Andrew Hon Plant Licensing Branch II |
| To: | Hess T Tennessee Valley Authority |
| References | |
| MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, MF9060 | |
| Download: ML17009A354 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Hon, Andrew Sent:
Monday, January 09, 2017 2:28 PM To:
Hess, Thomas A (tahess@tva.gov)
Cc:
Shea, Joseph W; Beasley, Benjamin; Hoffman, Raymond
Subject:
Accepted for Review - TVA Fleet Lic Amend Reqst to Adopt Emergency Action Level Schemes Per NEI 99-01 Rev. 6 (MF9054, MF9055, MF9056, MF9057, MF9058, MF9059 and MF9060)
By letter dated January 4, 2017 (ADAMS NO. ML17004A340), TVA submitted the subject license amendment request for Browns Ferry Units 1, 2 and 3, Sequoyah Units 1 and 2, and Watts Bar Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 11 months, which is December 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
If you have any questions, please contact me.
Andy Hon, PE Project Manager (Sequoyah Nuclear Plant and TVA Fleet)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
3251 Mail Envelope Properties (Andrew.Hon@nrc.gov20170109142800)
Subject:
Accepted for Review - TVA Fleet Lic Amend Reqst to Adopt Emergency Action Level Schemes Per NEI 99-01 Rev. 6 (MF9054, MF9055, MF9056, MF9057, MF9058, MF9059 and MF9060)
Sent Date:
1/9/2017 2:28:10 PM Received Date:
1/9/2017 2:28:00 PM From:
Hon, Andrew Created By:
Andrew.Hon@nrc.gov Recipients:
"Shea, Joseph W" <jwshea@tva.gov>
Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None "Hoffman, Raymond" <Raymond.Hoffman@nrc.gov>
Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2515 1/9/2017 2:28:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: