ML16343B042
Jump to navigation
Jump to search
ML16343B042 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/24/2016 |
From: | Indiana Michigan Power Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16336A263 | List:
|
References | |
AEP-NRC-2016-42 | |
Download: ML16343B042 (1) | |
Text
I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T T Revision: 23Table: 14.2.5-2 Page: 1 of 1 UNIT 2 TIME SEQUENCE OF EVENTS Accident Event Time (sec) Rupture of a Steamline
- 1. Inside Containment With Offsite Power available Steam line ruptures 0.0 Low steamline pressure setpoint reached 0.26 Feedwater Isolation (All loops) 8.26 Steamline Isolation (Loops 2, 3 and 4) 11.26 Pressurizer empties 13.8 SI flow starts 27.26 Criticality attained 25.2 Boron from SI reaches core 38.4 Peak heat flux attained 118.2 Core becomes subcritical 131.2 2. Inside Containment Without Offsite Power available Steam line ruptures 0.0 Low steamline pressure setpoint reached 0.26 Feedwater Isolation (All loops) 8.26 Steam Isolation 11.26 Pressurizer empties 15.4 Criticality attained 30.8 SI flow starts 37.26 Boron from SI reaches core 52.0 Peak heat flux attained 266.2 Core becomes subcritical
~300