ML16343A561
| ML16343A561 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/26/1998 |
| From: | Wong H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342D972 | List: |
| References | |
| 50-275-97-23, 50-323-97-23, NUDOCS 9802050355 | |
| Download: ML16343A561 (10) | |
See also: IR 05000275/1997023
Text
A
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9802050355
DOC.DATE: 98/01/26
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
lONG,H.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific
Gas
6 Electric Co.
SUBJECT:
Forwards insp repts'0-275/97-23
S 50-323/97-23
on 971123-
980103.No violations noted.
DISTRIBUTION CODE: IEOIT
COPIES
RECEIVED: LTR
ENCL f
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
05000275
05000323
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
LE CENT
NR
DRPM/PECB
'NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
2
2
1
'
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
~
1
1
1
1
1
TERNAL: LITCO BRYCE,J H
NRC PDR
NOAC
NUDOCS FULLTEXT
1
1
1
1
RES SS~
gga
Ski@
Q% ps+~]gg
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST!
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO:
DESK
(DCD)
ON EXTENSION 415-2083
FULL TEXT CONVERSION REQUIRED
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
IPB HKQy
('l
Wp
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
January
26,
1998
Gregory M. Rueger, Senior Vice President
and General Manager
Pacific Gas and Electric Company
Nuclear Power Generation
N9B
P.O. Box 770000
San Francisco, California 94177
A
SUBJECT:
NRC INSPECTION REPORT 50-275/97023; 50-323/97023
C
Dear Mr. Rueger:
An NRC inspection was conducted
November 23, 1997 through January 3, 1998, at your
Diablo Canyon Nuclear Power Plant, Units
1 and 2 reactor facilities. The enclosed report
presents the scope and results of that inspection.
P
During the 6-week period covered by this inspection period, your conduct of activities at
the Diablo Canyon Nuclear Power Plant facility was generally characterized
by
safety-conscious
operations,
sound engineering
and maintenance
practices, and good
radiation protection support.
In. accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Howard J. Wong, Chief
Reactor Projects Branch
E
Docket Nos.: 50-275
50-323
License Nos.:
DPR-82
Enclosure:
NRC Inspection Report
50-275/97023; 50-323/97023
9802050355
980126
ADQCK 05000275
G
l)ltttletlttt50litltltll
Pacific Gas and Electric Company
-2-
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns)Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent
Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Cl
Pacific Gas and Electric Company
Robert P. Powers, Vice President
and Plant Manager
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson
Avenue
P.O. Box 112
San Luis Obispo, California 93406
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-'Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System
(IPAS)'-Mail
report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)~
bcc distrib. by RIV:
'egional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
B. Henderson
(PAO)
DOCUMENT NAME:
To receive copy of document,
Indicate in box: "C" = Copy without enctosures
"E" = Copy with enciosures
"N" = No copy
RIV:SRI
Pl: DRP/E
C:DRP/E
DProulx
01~98
"I 8 H.i6
BOlson ~
HWong
01/ /98
01~98
OFFICIAL RECORD COPY
SF'/