Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/97-01 & 50-323/97-01
ML16343A515
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/25/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
50-275-97-01, 50-275-97-1, 50-323-97-01, 50-323-97-1, NUDOCS 9707300231
Download: ML16343A515 (20)


See also: IR 05000275/1997001

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9707300231

DOC.DATE: 97/07/25

NOTARIZED:

NO 'OCKET

FACZL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

UTH.NAME

AUTHOR AFFILIATION

NELL,A.T.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERgG.M.

Pacific Gas

& Electric Co.

SUBJECT:

Ack receipt of 970628 ltr informing

NRC of steos

taken to

correct violations noted in insp repts

50-275/97-01

&

50-323/97-01.

DISTRIBUTION CODE:

IE42D

COPIES

RECEIVED:LTR

ENCL'IZE:

TITLE: Operator Licensing Examination Reports

NOTES:

A

T

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

NRR/DRCH/HHFB

RGN4

FIZ,E

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

~CENSE

RR7DRCH/HOLB

COPIES

LTTR ENCL

1

1

1

1

1

1

EXTERNAL: NOAC

1

1

NRC

PDR

1

1

2

D

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

9

FNCL

9

0

UNITEO STATES

NUCLEAR R EG ULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON. TEXAS 76011 8064

July 25,

l997

Gregory M. Rueger, Senior Vice President

and General IVlanager

Nuclear Power Generation

Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco,

California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/97-01; 50-323/97-01

Dear Mr. Rueger:

Thank you for your letter of June 28, 1997, in response

to our letter and Notice of

Violation dated May 29, 1997.

We have reviewed your reply and find it responsive to the

~

~

concerns raised in our Notice of Violation. We will review the implementation of your

corrective actions during a future inspection to determine that full compliance has been

achieved

and will be maintained.

Sincerely,

Arthur T. Howell III, Director

Division of Reactor Safety

Docket Nos.:

50-275; 50-323

License Nos.:

DPR-80; DPR-82

CC:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

)><<)III>>>,

.

970730023i

970725

PDR

ADQCK 05000275

6

PDR

Pacific Gas and Electric Company

-2-

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cess Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J

~ Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

-3-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System

(IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)(IE42)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DRS AI 97-G-0058

DOCUMENT NAME: R't DciDC701AK.TOM

To receive copy of document,

Indicate in box: "C" = Copy without enclos

res

"E" = Copy with enclosures

"N" = No copy

TPGwynn

TOMcKernon

Pellet

RIV:RE:OB

C:OB

~

D:DRP

D:DR

ATHo

e

I III

0742. /97

07/~/97

07/gy/97

07

OFFICIAL RE

OR

COPY

0

Pacific Gas and Electric Company

-3-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD~)(IE42)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DRS AI 97-G-0058

DOCUMENT NAME':i DciDC701AK.TOM

To receive copy of document, indicate in box: "C" = Copy without encios

res

"E" = Copy with enciosures "N" = No copy

RIV:RE'OB

TOMcKernon

C:OB

Pellet

D:DRP

TPGwynn

D:DR

ATHo

e

III

07+ /97

07/~/97

07

07/pgf97

OFFICIAL RE

OR

COPY

Pacific Gas and Electric Company

June 28, 1997

PGS,E Letter DCL-97-114

245 Market Street. Room 937-N9B

San Francisco. G. 94105

.il(lllll(u,nklll'5<

Mail Code NBB

P.O. Box 770000

San Franasco.

CA 941 77

4 1 B73-4684 Fax 41 Sl973-2313

Gregoiy M. Rueger

Senior Vice President and

General Manager

Nuclear Poiler Generation

U.S. Nuclear Regulatory Commission

ATTN: Document Control Desk

Washington, DC 20555

Docket No. 50-275, OL-DPR-80

Docket No. 50-323, OL-DPR-82

Diablo Canyon Units 1 and 2

Re

I

to a NoticeofViolationinlns ection Re ort Nos. 50-275/97-01 and

50-323/97-01

Dear Commissioners and Staff:

NRC Inspection Report Nos. 50-275/97-01 and 50-323/97-01, dated May 29,

1997, included one Severity Level IVviolation with two examples of failure to

implement procedures

in accordance with Technical Specification,

Administrative Controls, Section 6.8.1a.

The examples include failure to

provide operators with special prescription framed glasses for use with self-

contained breathing apparatuses

(SCBAs) and failure to complete annual

SCBA refresher training.

PGRE's reply to the notice of violation is enclosed.

Sincerely,

'IH~

Greg(ry M. Rueger

cc:

Steven D. Bloom

Ellis W. Merschoff

Kenneth E. Perkins

Michael D. Tschiltz

Diablo Distribution

INPO

Enclosure

A0429503/A04295720/TLH/2237

Enclosure

PG8E Letter DCL-97-114

REPLY TO A NOTICE OF VIOLATIONIN

INSPECTION REPORT NOS. 50-275/97-01 AND 50-323/97-01

On May, 29, 1997, as part of NRC Inspection Report (IR) Nos. 50-275/97-01 and

50-323/97-01, NRC Region IV issued a notice of violation to Diablo Canyon

Power Plant, Units 1 and 2. The statement of violation and PGKE's reply are

documented below.

STATEMENT OF VIOLATION

Technical Specification, Section 6.8. 1a, requires, in part, thaf written

procedures be implemented covering the applicable areas recommended

in Appendix A ofRegulatory Guide 1.33, Revision 2, February 1978.

Appendix A of Regulatory Guide 1.33 lists activities fhat should be

covered by written procedures to include those for respiratory profection.

Procedure OM14./D2, "Medical Examinations," Revision 1A, requires that,

"individuals with prescripfion eyeglasses

who are required to wear a full-

face respirator shall use special frames for their glasses that do not

interfere with the face-piece seal." Further, Section 4.2.9b of Procedure

RP1./D3, "Respiratory Protection Program," states that, "onlyspecial

specfacle kifs specified by the manufacturer offhe respirator shall be used

so that the NIOSH approvalis not violafed."

Procedure TQ1.DC20, Revision 1, sfates, in part, that a two-part program

is used toinstruct personnelin the proper use and care ofrespiratory

profective equipmenf.

Inifialtraining program includes the proper actions

for abnormal or emergency sifuafions and a followup annual refresher

training checks the proficiency in the proper actions forabnormal or

emergency sifuafions.

Contrary to fhe above,

On 21 April 1997, it was identified that 26 licensed operators wifh

licenses conditioned forcorrective lenses did nof have special

prescription framed glasses for use wifh self-confained breafhing

apparafuses'available

in the control room for emergency use.

On 23 April 1997, it wasidentified that approximately 75 percent of

control room watchstanders had nof completed the annual refresher

associated

with the proficiency training in the use ofself-contained

breafhing apparatuses.

Enclosure

PG8 E Letter DCL-97-114

The above examples represent a Severity Level IV violation (Supplement

I) (50-275;-323/9701 -01).

REASON FOR THE VIOLATION

PG8E agrees with the violation as stated in the IR.

S ecial Prescri

tion Framed Glasses for Use With Self-Contained Breathin

A

aratuses

SCBAs

Example

1 identified that 26 licensed operators with licenses conditioned for

corrective lenses did not have special prescription framed glasses for use with

SCBAs.available in the control room for emergency use.

PG8 E attributed the condition to inadequate procedures and training. Neither

explicitly identified the responsibility to procure and maintain special prescription

frames for respirators or SCBAs.

Com letion of Annual SCBA Refresher Trainin

Example 2 identified that approximately 75 percent of control room

watchstanders

had not completed the annual refresher associated with the

proficiency training in the use of SCBAs.

PG8 E attributed this condition to an inadequate procedure.

Although the

procedure required that the access supervisor maintain the most current security

level and radiological access category information in the Plant Information

Management System (PIMS), it did not specify the responsibility for maintaining

the respiratory protection access category.

Consequently, repiratory protection

training codes were not properly maintained for the operators.

Since the codes

were incorrect, the training notifications were not made.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED

S ecial Prescri

tion Framed Glasses for Use With SCBAs

A prompt evaluation was done to assess

the operator's ability to carry out

licensed duties while wearing a SCBA using regular frames.

Based on

evaluation, the operators were informed that for SCBA use only, ifcorrective

lenses are needed to perform licensed duties, and special frames are not

available to wear within the face mask, the operator should wear the SCBA with

their regular glasses

in an emergency.

Enclosure

PG8 E Letter DCL-97-114

Com letion of Annual SCBA Refresher Trainin

Operators received immediate practical training on SCBAs to fulfillthe annual

refresher training requirement.

During the training it was noted that all operators

were fullycapable of donning the SCBA correctly.

PIMS was changed to provide the proper training code for the operators and

members of the fire brigade.

This code requires operators and fire brigade

members to attend SCBA initial and refresher training, and respirator initial and

requalification training.

CORRECTIVE ACTIONS TO BE TAKENTO PREVENT RECURRENCE

S ecial Prescri

tion Framed Glasses for Use With SCBAs

Licensed operators and fire brigade members will receive special frames from

the Safety and Medical Services Section.

The frames will be maintained in a

designated storage area.

Other departments with personnel who may be required to wear special frames

with respirators or SCBAs in an emergency situation, willevaluate the need to

provide prescriptive frames.

The procedures and training curriculum for the Respirator Protection Program

will be revised to clearly indicate the joint responsibilities for procuring and

maintaining special prescription frames.

Com letion of Annual SCBA Refresher Trainin

Other departments with personnel designated for respirator and SCBA training

willverify the assigned codes are correct and make appropriate changes.

The procedure for operator requalification willbe changed to ensure SCBA

refresher training is scheduled annually as part of operator requalification.

The procedure for controlling access codes will be revised to clearly identify the

joint responsibilities for developing access codes, applying the codes to

individuals, and making changes to approved codes.

Enclosure

PG8E Letter DCL-97-114

DATE WHEN FULLCOMPLIANCEWILLBE ACHIEVED

The actions to change respiratory protection procedures and training and the

actions by other departments will be completed by 09/01/97.

Licensed operators and fire brigade members will receive special frames from

the Safety and Medical Services Section by 10/01/97 by which date PGRE will

be in full compliance.