CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9604160031
DOC.DATE: 96/04/10
NOTARIZED:
NO
FACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFIIIATION
DYER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
a Electric Co.
SUBJECT:
Forwards
insp repts
50-275/96-02
& 50-323/96-02
on 960121-
0302
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
FNCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
g
05000275
05000323
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AE~O/
C
ILE CENT
R
NRR/DRCH HHFB
NRR/DRPM/PERH
OE DIR
RGN4
FILE
01
TERNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
I T
~
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
f<
~PR RIG(ll'fp
+ ~ ye~
UNIT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE ~ SUITE 400
ARLINGTON,TEXAS 76011.8064
APR
I 0
1996
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/96-02;
50-323/96-02
AND
This refers
to the inspection
conducted
by M. D. Tschiltz
and others of this
office on January
21 through March 2,
1996, at the Diablo Canyon Nuclear
Power
Plant,
Units
1
and
2, facility.
The purpose of the inspection
was to
determine
whether activities authorized
by the license
were conducted
safely
and in accordance
with NRC requirements.
At the conclusion of the inspection,
the findings were discussed
with you and those
members of your staff
identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
act>v>ties
in progress.
The results of this inspection
are
documented
on
pages
3 and 4, in the ehclosed
report.
Based
on the results of this inspection,
the
NRC has determined
that three
violations of NRC requirements
occurred.
The violations are cited in the
enclosed
Notice of Violation (Notice)
and the circumstances
related
to them
are described
in detail
in the subject
inspection report.
The first violation
involved the failure to adequately
perform the monthly channel
checks
on
postaccident
monitoring instrumentation.
The last
two violations involve the
failure to take prompt
and comprehensive
corrective actions for identified
conditioJIs adverse
to quality.
In one instance,
fire brigade
members
were not
adequately
trained;
in the
second
instance p the centri,fugal
charging
pumps
=,~
were placed
in an unanalyzed
condition during testing lineups.
This area is
of concern
since other inspection findings,
as well
as your own self-
assessments,
have identified deficiencies
associated
with your corrective
action program.
You are required to respond
to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response.
you should document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous
docketed
correspondence, if the correspondence
adequately
addresses
the required
response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and
the results of future
9b04ib003i 9b04i0
ADOCK 05000275
6
4,
Pacific
Gas
and Electric Company
-2-
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter, its enclosures,
and your response will be placed
in the
NRC
Public Document
Room
(POR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information
so that
it can
be placed
in the
PDR without redaction.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed
in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Oockets:
50-275
50-323
Licenses:
OPR-80
W)u
J.
E. Dyer, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
50-275/96-02;
50-323/96-02
cc w/enclosure:
Sierra
Club California
ATTN:
Dr. Richard
Ferguson
Energy Chair
1100 lith Street,
Suite
311
Sacramento.
95814
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Pacific
Gas
and Electric
Company
Ms. Jacquelyn
C. Wheeler
P.O.
Box
164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321
Johnson
Avenue
P.O.
Box
112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns~Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq
~
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento.
94234
State of California
ATTN:, Mr. Peter
H; Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Pacific
Gas
and Electric Company
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
E-Hail report to Hike Davis,
NRR (HJD1)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
H.
Hammond
(PAO.
WCFO)
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
DOCUMENT NAME:
R:K DCiDC602RP.HDT
To receive copy of document, indicate in bore "C" = Copy without enclosures
"f." ~ Copy with enclosures "N" ~ No copy
RIV:DRP/E
E
Tschiltz
/
/96
C:DRP/E
E
JEDyer
Won
4/
/96
4/'/96
C
(
0
C
L
D:DRP
E
Pacific
Gas
and Electric Company
Pacific
Gas
and Electric Company
Diablo Canyon
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
E-Hail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
E-Hail report to Mike Davis,
NRR (MJDI)
bcc to
DMB (IE01)
bcc distr'ib.
by RIV:
L.,J. Callan
DRS-PSB
Branch Chief (DRP/E,
WCFO)
RIV File
H.
Hammond
(PAO,
WCFO)
Rodent
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
DOCUMENT NAME:
R:i DCttDC602RP.HDT
To receive copy of document, indicate in born "C" ~ Copy without enclosures
E
= Copy with enNosures
"N" a No copy
RIV:DRP/E
E
C:DRP/E
E
D:DRP
E
Tschiltz
/
/96
Wonq
4/
/96
JEDyer
4/ I/'/96
0
C
C0
i~~C