IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.1 Table:
11.3-2 Page:
1 of 1 REACTOR COOLANT FISSION AND CORROSION PRODUCT ACTIVITIES DURING STEADY STATE OPERATION AND PLANT SHUTDOWN OPERATION OPERATING PWR PLANT DONALD C. COOK PLANT - 1% FUEL DEFECTS ISOTOPE MEASURED ACTIVITY BEFORE SHUTDOWN
µµµµCi/gm MEASURED PEAK SHUTDOWN ACTIVITY
µµµµCi/gp CALCULATED ACTIVITY BEFORE SHUTDOWN
µµµµCi/gm EXPECTED PEAK SHUTDOWN ACTIVITY
µµµµCi/gm I-131 0.83 14.9 2.4 43.0 Xe-133 127.0 65.0 1 254.0 130.0 (1)
Cs-134 1.29 1.7 0.19 0.25 Cs-137 1.67 2.14 1.1 1.4 Cs-144 0.00068 0.0058 0.00051 0.0044 Sr-89 0.0033 0.40 0.0042 0.51 Sr-90 0.00057 0.013 0.0001 0.0023 Co-58 0.95 0.025 1.0 1 Activity reduced from steady state level by approximately one day of system degassification prior to plant shutdown.