ML16343A034
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
23 Table: 11.2-12 Page:
1 of 1 DOSE RATE (REM/HR) RHR OR CONTAINMENT SPRAY Time Pump Room Heat Exchanger Room Safety Injection Pump Room 0
2.8 22.7 37.6 0 - 5 hr 2.3 18.6 32.2 1 hr.
2.0 16.3 27.4 2 hr.
1.6 13.4 22.1 8 hr.
0.83 6.6 10.5 1 day 0.l8 l.5 2.6 1 week 0.02 0.2 0.41 1 month 0.008 0.08 0.18 Under the assumptions of:
(1) increased sump dilution by melted ice, (2) core and halogen releases in accordance with Safety Guide No. 4 (in effect on September 1971), and (3) washdown of 50% of the core halogens to the sump occurs as a result of the action of the containment sprays.