Forwards Safety Evaluation of Second 10-yr Interval ISI Program Plan Requests for Relief PRS-1C,rev 1,PRS-1D,PRS-1E & PRS-1F,for Plant,Units 1 & 2
ML16342E081
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/01/1998
From: Bateman W
NRC (Affiliation Not Assigned)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342E082 List:
References
TAC-M95068, TAC-M95069, NUDOCS 9805080193
Download: ML16342E081 (4)


Text

Hay 1, 1998 Mr. Gregory M. Rueger, Senior Vice President and General Manager Pacific Gas and Electric Company Nuclear Power Generation N9B P. O. Box 770000

. San Francisco, California 94177

SUBJECT:

EVALUATIONOF THE SECOND TEN-YEAR INTERVALINSERVICE INSPECTION PROGRAM PLAN - REQUESTS FOR RELIEF NOS. PRS-1C, REVISION 1, PRS-1D, PRS-1E, AND PRS-1F, FOR DIABLOCANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS. M95068 AND M95069)

Dear Mr. Rueger:

By letter dated December 24, 1997, as supplemented by letter dated January 30, 1998, Pacific Gas and Electric Company submitted a request regarding its second 10-year interval inservice inspection (ISI) program plan requests for relief for Diablo Canyon Power Plant, Units'1 and 2.

The licensee requested that the staff review the alternatives required for its upcoming Unit 2 outage contained in Requests for Relief Nos. PRS-1 C, Revision 1, PRS-1D, PRS-1E, and PRS-1F

. The staff, with technical assistance from its contractor, the Idaho National Engineering and Environmental Laboratory (INEEL) has reviewed and evaluated the information provided by the licensee.

The staff concludes that the proposed alternative testings for Requests for Relief Nos. PRS-1C, Revision 1, PRS-1E, and PRS-1F are authorized pursuant to 10 CFR 55a(a)(3)(i), in that the proposed alternatives provide an acceptable level of quality and safety.

Request for Relief PRS-1D is denied.

The staff's evaluation and conclusions are contained in the enclosed Safety Evaluation.

Sincerely, Original Signed By William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

Safety Evaluation cc w/encl: 'See next page DOCUMENT NAME: DC95068.REL DLange GHill (4)

KPerkins, RIV WCFO PGwynn, RIV TLH1 (SE)

Docket

'UBLIC PDIV-2 Reading

'Adensam (EGA1)

'Bateman S Bloom EPeyton OGC'CRS III'IEC~~) IWf OFC P

/PDIV-2 LA/PDIV-2 OGC PD/PD IV-2 NAME EPPeyt Pn tf%nh nn wBatema DATE 04/IQ/98 04/L3/98 04'>/98

/

/98 OFFICIAL RECORD COPY 9805080i93

'P8050i PDR ADOCK 05000275 P

PDR

0 Jl J.p p%

Mr. Gregory M. Rueger May 1, 1998 cc w/encl:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Christopher J. Warner, Esq.

Pacific Gas & Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Mr. Robert P. Powers Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. O. Box 56 Avila Beach, California 93424 Chairman San Luis Obispo County Board of Supervisors

'oom 370 County Government Center San Luis Obispo, California 93408 Telegram-Tribune ATIN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, California 93940