Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/13/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342E030 List:
References
50-275-98-02, 50-275-98-2, 50-323-98-02, 50-323-98-2, NUDOCS 9803250003
Download: ML16342E029 (10)


See also: IR 05000275/1998002

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803250003

DOC.DATE: 98/03/13

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

WONG,H.J.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts

50-275/98-02

E 50-323/98-02

on

980104-0214

Ec NOV re failure to implement sealed valve

procedure.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR Q ENCL g

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vi&o ation Response

NOTES:

DOCKE'.

05000;

050003,

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

FILE CENT

/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

TERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

.

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

'

1

1

1

1

1

-

1

1

1

LOAl<~9 Fz)op(~

PtP~C F( OP~~~

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

4

0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011-6064

March 13, 1998

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation,

B1'4A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT 50-275/98-02; 50-323/98-02 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

From January 4 through February 14, 1998, a routine inspection was conducted at your Diablo

'Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the

scope and results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized

by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

Based on the results of this inspection, a violation of NRC requirements was identified. The

violation involved several individual examples of failure to implement the sealed valve procedure.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report. The NRC has concluded

that information regarding the reason for the violation, the corrective actions taken and planned

to correct the violation and prevent recurrence is already adequately addressed

on the docket in

the enclosed report. Therefore, you are not required to respond to this letter unless the

description therein does not accurately reflect your corrective actions or your position.

In that

case, or ifyou choose to provide additional information, you should follow the instructions

specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s),

and your response will be placed in the NRC Public Document Room (PDR).

9803250003

980313

PDR

ADGCK 05000275

8

PDR

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Howard J. Wong, Chief

Reactor Project Branch E

Division of Reactor Projects

Docket Nos.:

50-275

50-323

License Nos.:

DPR-80

DPR-82

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-275/98-02; 50-323/98-02

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

l

Pacific Gas and Electric Company

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass-Street,

Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, Califo'rnia 93406

0

Pacific Gas and Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:t DCiDC802RP.DL'P

To receive co

of document, indicate in bofu "C" = Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:SRI:DR

DLProulx

3/

98

DRS:TS

IBarnes

0

98

C:DRP/

HJWo

03/

OFFICIAL