ML16342E029
| ML16342E029 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/13/1998 |
| From: | Wong H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342E030 | List: |
| References | |
| 50-275-98-02, 50-275-98-2, 50-323-98-02, 50-323-98-2, NUDOCS 9803250003 | |
| Download: ML16342E029 (10) | |
See also: IR 05000275/1998002
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9803250003
DOC.DATE: 98/03/13
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
WONG,H.J.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards insp repts
50-275/98-02
E 50-323/98-02
on
980104-0214
Ec NOV re failure to implement sealed valve
procedure.
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR Q ENCL g
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vi&o ation Response
NOTES:
DOCKE'.
05000;
050003,
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
FILE CENT
/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
TERNAL: LITCO BRYCE,J H
NRC PDR
COPIES
LTTR ENCL
1
1
2
.
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
'
1
1
1
1
1
-
1
1
1
LOAl<~9 Fz)op(~
PtP~C F( OP~~~
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
4
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011-6064
March 13, 1998
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation,
B1'4A
77 Beale Street, Room 1451
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC INSPECTION REPORT 50-275/98-02; 50-323/98-02 AND NOTICE OF
VIOLATION
Dear Mr. Rueger:
From January 4 through February 14, 1998, a routine inspection was conducted at your Diablo
'Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the
scope and results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized
by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
Based on the results of this inspection, a violation of NRC requirements was identified. The
violation involved several individual examples of failure to implement the sealed valve procedure.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report. The NRC has concluded
that information regarding the reason for the violation, the corrective actions taken and planned
to correct the violation and prevent recurrence is already adequately addressed
on the docket in
the enclosed report. Therefore, you are not required to respond to this letter unless the
description therein does not accurately reflect your corrective actions or your position.
In that
case, or ifyou choose to provide additional information, you should follow the instructions
specified in the enclosed Notice.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure(s),
and your response will be placed in the NRC Public Document Room (PDR).
9803250003
980313
ADGCK 05000275
8
Pacific Gas and Electric Company
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Howard J. Wong, Chief
Reactor Project Branch E
Division of Reactor Projects
Docket Nos.:
50-275
50-323
License Nos.:
DPR-82
Enclosures:
1.
2.
NRC Inspection Report
50-275/98-02; 50-323/98-02
cc w/enclosures:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
l
Pacific Gas and Electric Company
Mr. Truman Burns>Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass-Street,
Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Robert P. Powers, Vice President
and Plant Manager
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, Califo'rnia 93406
0
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:t DCiDC802RP.DL'P
To receive co
of document, indicate in bofu "C" = Co