Forwards Insp Repts 50-275/98-01 & 50-323/98-01 on 980105- 09 & Notice of Violation Re Failure of Individuals to Have Operating Alarming Dosimeters When Radiological Controlled Area Entered
ML16342D965
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/30/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D966 List:
References
50-275-98-01, 50-275-98-1, 50-323-98-01, 50-323-98-1, NUDOCS 9802050028
Download: ML16342D965 (12)


See also: IR 05000275/1998001

Text

CATEGORY 2

<~6

.

I

~'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I

ACCESSION NBR:9802050028

DOC.DATE: 98/01/30

NOTARIZED: NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

05000275

I

~

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

RAY,BE

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT: Forwards insp repts 50-275/98-01

& 50-323/98-01

on 980105-

09

&. notice of violation re failure of individuals to have

operating alarming dosimeters

when radiological controlled

area entered.

DISTRIBUTION CODE:

IE06F

COPIES

RECEIVED:LTR

(

ENCL

(

SIZE: 5 4 (

TITLE: Environ

& Radiological

(50. DKT)-Insp Rept/Notice of Violation

Respons'OTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL:

ILE CE

NRR DRPM/PERB

OE DIR

RGN4

FILE

01

RNAL: NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1'

1

1

1

1

1

1

1

RECIPIENT

ZD CODE/NAME

BLOOM,S

AEOD/TTC

NMSS/SFPO

06F18

NUDOCS-ABSTRACT

OGC/HDS3

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

F'

Fg

)~ sr i I

~

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION

LIST'R

REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO'.

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

15

ENCL

15

a ~

I

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

January 30, 1998

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/98-01; 50-323/98-01 AND NOTICE OF

VIOLATION

Dear Mr. Rueger:

An NRC inspection was conducted January 5-9, 1998, at your Diablo Canyon Nuclear Power

Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that

inspection.

A violation of NRC requirements was identified. The violation involved failures of individuals to

have operating alarming dosimeters when they entered the radiological controlled area, as

required by radiation work permits. We are concerned because the number of occurrences

indicates a programmatic problem.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report.

Please note that you are

required to respond to this letter and should followthe instructions specified in the enclosed

Notice when preparing your response.

The NRC will use your response,

in part, to determine

whether further enforcement action is necessary

to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s),

and your response will be placed in the NRC Public Document Room (PDR). To

the extent possible, your response should not include any personal privacy, proprietary, or

safeguards

information so that it can be placed in the PDR without redaction.

9802050028 980i30

PDR

ADQCK 05000275

6

PDR

IIIIIIIIIIIIIIIIIIIIII

IIIIIIIIII.IIIIIII

'

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

(9/mm~~

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-275; 50-323

License Nos.: DPR-80; DPR-82

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-275/98-01; 50-323/98-01

cc w/enclosures:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Pacific Gas and Electric Company

Robert R. Wellington, Esq.

Le al Counsel

g

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

-3-

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

DC Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DRS Action Item File (98-G-0016)

DOCUMENT NAME: G:>REPORTS(DC801RP.LTR

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N"= No copy

RIV:PSB

LTRicketson:n ~

01

/98

C:DRSttps

BMurray

0

98

C:DRPiE

DKirsch

01

/98

OFFICIAL RECORD COPY

'

t

Pacific Gas and Electric Company

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IF06)

bcc distrib. by RIV:

Regional Administrator

DRS Director

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

DC Resident Inspector

DRS Deputy Director

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DRS Action Item File (98-G-0016)

DOCUMENT NAME: G:ttREPORTSttDC801RP.LTR

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enciosures "N"= No copy

RIV:PSB

C:DRS'tps

C:DRPtE

LTRicketson:nh >

BIVIurray

01

/98

0

98

DKirsch

01

/98

OFFICIAL RECORD COPY