Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML16342D867
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9711210106
Download: ML16342D867 (14)


Text

c,,

CATEGORY 2 ',

REGULATORY INFORMATION DISTRIBUTIOPSYSTEM (RIDS)

ACCESSION NBR:9711210106 DOC.DATE: 97/11/14 NOTARIZED: NO FA'CIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga AUTH.NAME AUTHOR AFFILIATION GWYNN,T.P.

Region 4

(Post 820201)

RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Advises of planned insp effort resulting from licensee semiannual plant performance review.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-1nsp Rept/Notice of Violation Response NOTES:

DOCKET ¹ 05000275 05000323 E

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS NRR/DRPM/PERB OE DIR RGN4 FILE 01 COPIES LTTR ENCL 1

1 2

2 l.

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME BLOOM,S AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC NUDOCS FULLTEXT 1

1 1

1 D

0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 'WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

f I

A Jf+

uNITED sTATEs NUCLEAR REGULATORY COMMISSION REGION IV 611RvANP~ AZA ORIVE SUITE 400 ARI.INGTONTEXAS76011 8064 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177

SUBJECT:

SElvllANNUALPLANT PERFORMANCE REVIEW (SPPR)

- DIABLO CANYON, UNITS 1 AND 2

Dear Mr. Rueger:

On October 9, 1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The SPPR for Diablo Canyon involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March through September 1997.

SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Diablo Canyon SPPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Mr. Howard Wong at (510) 975-0296.

Sincerely, T omas P. Gwynn, Direct r Division of Reactor Proj ts /

97ii2iOi06 '77iii4 PDR ADOCK 05000275 6

PDR V!!I!!Illlll!!ill!

Illlilllf!g

Pacific Gas and Electric Company Docket Nos.:

50-275 50-323 License Nos.:

DPR-80 DPR-82

Enclosure:

Inspection Plan cc: w/enclosure Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento.

California 94234

~p

Pacific Gas and Electric Company Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company r rsvp i ~

v

~

bcc to DCD (IE01) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:i DCiDCSP9704.LTR To receive copy of document, Indicate in box: "C" = Copy without enc(os res "E" = Copy with enclosures "N" = No copy RIV:C:DRP/E HJWong;df D:DRS

" D:DRP ATHowell P'-'PGw nn 11/i /97 1 1/

/97 11// -/97 r

OFFICIAL RECORD COPY

Pacific Gas and Electric Company bcc to DCD (IE01) bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP E, WCFO)

Senior Project Inspector (DRPiE, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO) 0 DOCUMENT NAME:

R DCtDCSP9704.LTR To receive copy of document, indicate in box: "c" = copy without enclosures "F" = copy with enclosures "N" = No copy RIV:C:DRP E HJWong;df 11/

~ Q 97 D:DRS ATHowell 11 97 D:DRP TPGw nn 11 97 OFFICIAL RECORD COPY

0

DIABLO CANYON POWER PLANT INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection

- Minimum NRC Inspection Program (mandatory all plants)

INSPECTION IP 37001 IP 81700 IP 84750 IP 82701 IP 83750 IP 86750 IP 38703 TITLE/

PROGRAM AREA 10 CFR 50.59 Safety Evaluation Program Physical Security Program Radioactive Waste Treatment and Effluent and Environmental Monitoring Emergency Preparedness Operational Status Inspection Occupational Radiation E'xposure Solid Radioactive Waste Management and Transportation of Radioactive Material Commercial Grade Dedication NUMBER OF INSPECTORS DATES 1 1/1 7-20/97 1 2/1-5/97 1 2/8-1 2/97 1 2/8-1 2/97 1 2/8-1 2/97 1/5-9/98 1/5-9/98 TYPE OF INSPECTION/COMMENTS Core Inspection Core Inspection Core Inspection Core Inspection Core Inspection Core Inspection Regional Initiative - Review of issues associated with the procurement of 4 kV circuit breakers IP 40500 Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems 1/1 2-1 6/98 and 1/26-30/98 Core Inspection