Insp Repts 50-275/97-14 & 50-323/97-14 on 970804-22. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering
ML16342D780
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/08/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342D779 List:
References
50-275-97-14, 50-323-97-14, NUDOCS 9709110077
Download: ML16342D780 (36)


See also: IR 05000275/1997014

Text

ENCLOSURE

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket Nos.:

License Nos.:

Report No.:

Licensee:

Facility:

Location:

Dates:

Inspector:

Approved By:

50-275

50-323

DPR-80

DPR-82

50-275/97-1 4

50-323/97-1 4

Pacific Gas and Electric Company

Diablo Canyon Nuclear Power Plant, Units

1 and 2

7 1/2 miles NW of Avila Beach

Avila Beach, California

August 4-22, 1997

M. D. Tschiltz, Senior Resident Inspector

H. J. Wong, Chief, Reactor Projects Branch

E

Attachment:

Supplemental

Information

gg 0~ I) 0%

9709ii0077 970908

PDR

ADOCK 05000275

6

PDR

EXECUTIVE SUMMARY

Diablo Canyon Nuclear Power Plant, Units

1 and 2

NRC Inspection Report 50-275/97-14; 50-323/97-14

~Oeretiene

~

Shift foreman failed to adequately

evaluate the consequences

of performing

maintenance

on the auxiliary saltwater (ASW) pump vault drain check valves on

ASW pump operability.

As a result, on numerous occasions

the applicable

Technical Specification (TS) Limiting Condition for Operation (LCO) was not entered

during maintenance

which rendered the check valves inoperable (Section 08.1).

Maintenance

An apparent violation of plant procedures

was identified when action requests

(ARs)

were not written or were written but failed to document the as-found condition of

the ASW pump vault drain check valve during inspections.

The inspections

revealed that the valves were not capable of performing their design basis function

(Section M1.1) ~

An apparent violation was identified due to the licensee's

failure to monitor the

performance or condition of the floor drain check valves associated

with the ASW

pump vaults or demonstrate

effective controls through preventive maintenance

to

assure fulfillment of function in accordance

with the Maintenance

Rule.

Specifically, as of July 10,-1996, the licensee was not monitoring Units

1 and 2

ASW systems

and the associated

floor drain check valves against licensee-

established

goals and had not demonstrated

that the performance

or condition of

the ASW pump vault drain check valves were effectively controlled through the

performance of appropriate preventive maintenance.

In 11 instances

check valve

inspections from August 2, 1994, to July 3, 1997, showed the check valves were

blocked in the open position (Section M1.1).

Numerous discrepancies

were found with the ASW pump vault floor drains.

Missing and corroded parts were noted during pump'ault inspections,

whic".'. were

indicative of inadequate

maintenance.

The poor condition of the floor drain covers

and the missing components

contributed to the accumulation of debris in the drain

lines (Section M1.1) ~

The licensee's

Quality Services organization

had not evaluated the adequacy of

corrective actions from previously documented

problems (Section M1.1).

~En ineerin

Following concerns regarding the operability of the check valves being raised by the

inspector, the licensee's

basis for continued operability was not well founded and

was nonconservative.

Subsequent

valve inspections

revealed that two of the three

valves that remained to be inspected were clogged with debris and inoperable.

This

condition was reported to the NRC by the licensee

as being outside of the plant's

design basi: (Section E4.1).

0

-2-

Review of maintenance

records for inspections of diesel fuel oil transfer (DFOT)

pump vault drain check valves revealed that a failed inspection, although

documented

on an AR, had not been properly classified as being a maintenance

preventable

functional failure (MPFF) (Section E4.1).

Re ort Details

Ins ection Sco

e

On August 4-22, 1997, the NRC inspector conducted

a special inspection, of the licensee's

maintenance

program for the ASW pump vault drain check valves.

The inspector's review

included:

past inspection results for the floor drain check valves; maintenance

applied to

the valves; how operations

addressed

TS LCO entry during past maintenance

activities on

the check valves; procedures

and training for the condition of a loss of the ASW system;

and the licensee's corrective actions related to the check valve problem.

These issues are

discussed

as follows.

The Operations section of this report addresses

how operators

had in the past failed to

enter the applicable TS LCO during maintenance

which rendered the ASW drain check

valves inoperable.

Additionally, this section of the report addresses

the procedures

and

operator training associated

with the backup fire water cooling system that is used to

provide cooling to the centrifugal charging pumps in the event the ASW system is

inoperable.

The Maintenance

section of the report provides the background of the ASW pump vault

drain check valve inspection results and the Maintenance

Rule findings.

Additionally, this

section addresses

the corrective actions taken to address the historical problems that the

licensee encountered

with the ASW pump vault drain check valves, deficiencies in the floor

drains, and an assessment

of the risks associated

with inoperable check valves.

The Engineering section of the report addresses

the initial determination of check valv'e

operability and the review of maintenance

of DFOT pump vault check valves that are

utilized to prevent potential backflooding of safety-related equipment.

ASW Pum

Vault Confi uration

Each unit has two ASW pumps which are housed

in separate

watertight vaults in the

intake structure.

Each pump vault drains via a floor drain to the intake structure sump

located in the invert area of the intake.

Each drain tine has a check valve installed':to

prevent backflow in the event of flooding of the intake structure (e.g., circulating water

pump moderate energy line break (MELB), seismic event, or tsunami).

The check valves

prevent backflooding of the vaults through the floor drain lines.

In this capacity, the

check valves perform an important safety function in the event of flooding of the intake

structure.

~

~

-2-

I. ~Qerations

08

Miscellaneous Operations Issues

08.1

ASW Pum

Vault Drain Check Valve Maintenance

Im act on ASW Pum

0 erabilit

a.

Ins ection Sco

e

92901

The inspector reviewed the licensee's

past practices for evaluating the impact of

performing ASW pump vault drain check valve inspections

and maintenance

on

ASW pump operability.

b.

Observations

and Findin s

Review of the historical information, provided by the licensee, indicated that the

operators

had not, at times, entered the action statement for the applicable TS LCO

when the ASW drain check valves were removed for maintenance.

During time

periods when maintenance

was performed on the ASW drain check valves, the

licensee failed to enter the applicable TS LCO. Typically, only one of the ASW

pump vault drain check valves had been removed for maintenance;

however, on

August 9, 1991, both Unit 1 ASW pump vault drain line check valves were

removed at the same time for a period of approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Section 1.0 (Definitions) of the Diablo Canyon TS defines a system as OPERABLE

when it is capable of performing its specified function(s) and when all necessary

attendant instrumentation,

controls, electric power, cooling or seal water,

lubrication or other auxiliary equipment'hat

are required for the system, subsystem,

train, component,

or device to perform its function(s) are also capable of performing

their related support function(s).

The Diablo Canyon FSAR Update, Revision 11A,

Section 3.4.1 specifies that "... each pump is housed

in a separate watertight

compartment"

and therefore the ASW pump vault drain check valves perform a

related support function for the ASW system which enables the ASW pumps to

remain operable during certain design basis events that result in the flooding of the

intake invert area.

Specifically, TS 3.7.4.1 requires that at least two ASW trains shall be OPERABLE

and, with only one ASW train OPERABLE, restore at least two trains to OPERABLE

status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and

in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

During that 24-hour period in

1991, operators

did not recognize that the valve maintenance

affected ASW pump

operability and, therefore, did not take the actions specified by TS 3.0.3.

In an internal memorandum

dated August 13, 1991, from the engineering project

manager to the Diablo Canyon maintenance

manager, the licensee incorrectly

evaluated the condition as being within design bases

and, therefore, the occurrence

was not reported to the NRC. The licensee recently reassessed

the determination

~

~

-3-

as a part of the review of the failed ASW check valve inspections, determined that

both pumps should have been considered

inoperable,

and plans to include this

information in Revision

1 to Licensee Event Report 50-275;323/97-11.

Review of the associated

recurring task work order utilized for performing

maintenance

on the check valves indicated that it had been incorrectly coded to

denote that the check valve work did not affect component operability.

This may

have contributed to the decision not to consider an ASW pump inoperable during

~

work, on the associated

check valve.

The failure to enter the applicable TS LCO action statement,

when performing ASW

pump vault drain line inspections,

is an unresolved item pending review of additional

information related to equipment, which may have also been removed from service

at the same time as the maintenance

on the check valves.

This information is to be

provided by the licensee during the predecisional enforcement conference

(URI 50-275;323/9714-01).

Conclusions

When authorizing maintenance

on ASW pump vault drain check valves, the shift

foreman failed to appropriately consider the effect of the maintenance

on ASW

pump operability.

08.2

0 erations Procedures

and Trainin

for Establishin

Fire Water Coolin

to

Centrifu al Char in

Pum

s

CCPs

a.

Ins ection Sco

e 92901

In an event in which the ASW system became inoperable, operators would connect

temporary lines to a fire water supply in order to provide cooling water to the CCPs.

The inspector reviewed the licensee's

procedure for establishing backup cooling to

the CCPs, which is included as Appendix C of Abnormal Operating

Procedure

OP AP-11, Revision 10, Malfunction of Component Cooling Water (CCW)

System.

The training materials covering the topic were also reviewed.

b.

Observations

and Findin s

In 1989 the licensee installed Design Change M-'41009 to provide the capability to

supply fire water to cool CCPs following a seismic event that resulted in the loss of

CCW to the CCPs.

The operator actions required to align the firewater cooling to

the CCP, providing seal injection for the reactor coolant pumps, are considered

as

risk-significant operator recovery actions.

-4-

Material Condition of the Fire Water Coolin

S stem

During walkdowns of the Units

j and 2 fire water cooling systems, the inspector

noted that the material condition of the systems was good and no discrepancies

were identified that would have impacted the operability of the system.

Review of past problems with the system indicated that, following installation of the

system and initial acceptance

testing in 1989, there were no surveillances

performed to verify operability of the systems until 1994, even though the licensee

had identified the need to periodically test the system in 1991.

Additionally, in

1993, the licensee identified corroded fittings on the Unit

1 system that were

judged to be in a condition that would have prevented the installation of one of the

four jumper hoses.

Corrosion was also noted on a fitting in the Unit 2 system.

Following discovery, these deficiencies were corrected.

In 1995, the licensee noted

that one of the hoses utilized for connecting the Unit

1 fire water backup cooling

system was missing.

The hose was subsequently

replaced.

The inspector noted

that, although there had been several material condition problems in the past, those

conditions had been identified and corrected by the licensee.

Licensee Procedures

for Su

I in

Fire Water Coolin

to the CCPs

Review of the abnormal operating procedure for connecting fire water cooling to the

CCPs indicated that appropriate instructions had been written. However, the

inspector noted that the procedure

required that the firewater flow be throttled on

the inlet to the CCP coolers as opposed to throttling the cooler outlet.

Additionally,

the inspector noted that the outlet of the cooling water was directed to the floor

drain, which was at an elevation below'the coolers.

This difference in elevation,

combined with the throttling of the inlet valves to the coolers, appeared

to create

the potential to partially drain the cooler during operation.

This question was posed

to the licensee and their response

noted that the fire water cooling system had been

tested in the configuration in question ahd test results demonstrated

that the fire

water to the CCPs provided adequate

cooling.

Further review determined that the licensee had not performed calculations to

determine the flow rate needed to provide adequate

firewater cooling to a CCP

pump.

Operating Procedure

AP-11 establishes

12 gpm to the oil cooler for all of the

CCPs, with the exception of CCP 2-2, which receives an additional 8 gpm of

cooling flow to its seal cooler.

An evaluation had'previously been performed and

documented

on AR A0369365, in which the licensee concluded that the flow rate

established

by the procedure was adequate

to provide cooling to the CCPs following

a loss of CCW accident in which there would be normal as opposed to accident

heat loads on the CCP.

Additionally, it should be noted that the procedure utilized

for system operation allowed for adjustment of flow rates and that the CCPs have

temperature

alarms that annunciate

in the control room that would alert the

operators to the need for providing additional cooling flow.

-5-

0 erator Trainin

for Ali nin

the Backu

Fire Water Coolin

to CCPs

Review of operator training records revealed that licensed operators received

detailed recurring training on the firewater cooling system.

Initial training was

provided to operators within several months following the initial installation of the

design change

in 1989 and for nonlicensed

operators

in 1990.

The licensee also

had written job performance

measures

to test both senior reactor operators

and

reactor operators

on the applicable procedures.

Job performance measures

were

also included in the training package that is provided to both licensed and

nonlicensed

operators.

Additional training was provided in 1997 following CCP

design changes

which resulted in modifications to the system and operating

procedure,

C.

Conclusions

Operators

had received appropriate training for establishing

fire water cooling

to the CCPs.

The material condition of the system was good and previous material

problems identified by the licensee had been corrected.

There was a procedural weakness

in that the procedure for aligning the

firewater created the potential to partially drain the CCP cooler when aligned

to the fire water system.

Although system testing had been performed utilizing fire water cooling to

the CCPs,

no calculations had t}een performed to determine the bounding

conditions for providing adequate

fire water cooling to the CCPs.

II. Maintenance

M.1

Conduct of Maintenance

M1.1

Nlaintenance of ASW Pum

Vault Drains

a

N

Ins ection Sco

e 62707

92902

The inspectors reviewed the maintenance

history of the ASW pump drain check

valves as a part of the review conducted for the closeout of IFI 50-275/9506-02

(See Section EG.1).

During the inspection, the following procedures

and documents

were reviewed:

~

Component Work Order Closure Remarks for Valves SW-1-987, SW-1-988,

SW-2-987, and SW-2-988 periodic inspections

-6-

ARs written following ASW pump vault check valve inspections (A0347014,

A0408657, A0408656, A0438707, A0438834, A0349968, A0406271,

A0438794)

Nonconformance

Report (NCR) DC1-91-MM-N067, Revision 0, ASW Pump

Vault Drain Check Valves and AR A0238503

Quality Evaluation 00009386, ASW Pump 1-2 Vault Floor Drain Clogged

Diablo Canyon Maintenance

Rule Technical Basis Document, Revision

1

NRC Information Notice (IN) 83-44, Supplement

1: Potential Damage to

Redundant

Safety Equipment as a Result of Backflow though the Equipment

and Floor Drain System

NRC Standard

Review Plan (NUREG 0800), Section 9.3.3, Equipment and

Floor Drainage System

AR A0135577, Create Routine Task Work Orders for ASW Vault Drain

Check Valves

Inter-Departmental Administrative Procedure

OM7-ID1, "Problem

Identification and Resolution - AR," Revision 7

b.

Observations

and Findin s

ASW Pum

Vault Drain Check Valve Maintenance

Histor

Review of the check valve maintenance

history revealed that the valves had

routinely failed the periodic inspections.

Inspection results documented that the

valves had been partially stuck open during 9 ofthe 11 most recent inspections

performed between August 2, 1994, and June 26, 1997.

The "as found" stuck

open condition of the valves was, in most cases,

due to the accumulation of sludge

and debris in the valves which rendered them inoperable and unable to perform their

design function of preventing backflooding of the ASW pump vault.

Review of the maintenance

history indicated that, based upon the failed inspections,

the licensee had changed the periodicity from every 36 months to 24 months in

November 1994, and from every 24 months to every 12 months in July 1996.

Although sludge and debris accumulation had been identified as the cause for the

check valves sticking in NCR DC1-91-MM-N067, Revision 0, there was no

indication that the drain lines had been flushed with the check valves removed.

In

addition, the corrective actions taken failed to prevent debris from accumulating in

the line.

-7-

Historical Problems With ASW Pum

Vault Drain Check Valves

The inspector noted that prior to 1991 there had been numerous problems with the

check valves.

NCR DCO-91-MM-N067 and AR A0238710 documented

repeated

instances

where check valves had been found stuck open prior to 1991.

Quality

Evaluation Q0009386 had also been written on prior problems with the check

valves.

One of the identified corrective actions was to develop adequate

housekeeping

for the drain lines to ensure that debris does not collect in the valves

such that they cannot close.

The recommended

action was to perform routine

flushing of the lines.

Although the action had been indicated as being completed,

the routine tasks for the valve maintenance

had not been revised to specify flushing

of the lines.

Discussions with licensee personnel indicated that the

postmaintenance

flow verification that had been added could be considered

a flush

of the line; however, flushing the drain lines after performing the maintenance

created the potential to flush debris in the lines into the valves after they had been

cleaned.

NRC IN 83-44

Su

fement

1

Potential Dama

e to Redundant

Safet

E ui ment as

a Result of Backflow Throu

h E ui ment and Floor Drain S stem

Supplement

1 to NRC IN 83-44, issued on August 30, 1990, expanded

the

concerns

raised in the initial,lN to include the potential for flooding safety-related

compartments

as a result of backflow through equipment and floor drainage

systems.

The IN also related information to licensees

concerning the potential for

flap type check valves to stick open as a result of debris and corrosion buildup.

The licensee completed their review of'the IN on February 12, 1993, and concluded

that the ASW pump vaults were susceptible to backflooding of the drainage system;

however, the preventive maintenance

performed on the ASW pump vault drain

check valves was adequate

to ensure the valves were operable.

The inspector

questioned

whether the maintenance

history of the valves had been consider" J

'uring

the review.

The licensee indicated that, since an NCR had been issued on

past problems with the valves sticking open, the corrective actions from the NCR

were thought to encompass

the issue,

Therefore, the licensee closed the review of

IN 83-44, Supplement

1, based upon the corrective actions for the NCR written on

the recurring problems with the ASW pump vault drain check valves prior to 1992.

Review of the maintenance

history after the NCR corrective actions had been

initiated, and prior to closeout of the IN, revealed that one check valve inspection

had been performed in October 1992 where a check valve was found to be stuck

open.

This appeared to have been

a missed opportunity by the Quality organization

to identify ineffective corrective actions.

-8-

Maintenance

Rule Re uirements A

licable to ASW Pum

Vault Drain Check Valves

Review of the licensee's program for implementation of the Maintenance

Rule

confirmed that the ASW pump vault drain check valves had been included within

the scope of the rule. Specifically, the licensee had included the valves since they

were relied upon to prevent the loss of an ASW pump during a tsunami or following

a main circulating water pump discharge

line break.

If flooding of the intake were

to have occurred, the inability of a check valve to close could have resulted in the

associated

ASW pump becoming inoperable.

Since the ASW pump vault drain check valves are included in the Maintenance

Rule

program, the problems noted during inspections of the valves are required to be

evaluated to determine whether they constitute MPFFs.

Engineering reviews of the

maintenance

performed within the 36 months prior to implementation of the

Maintenance

Rute did not identify any of the failed ASW pump vault check valve

inspections

as MPFFs.

For the period from 36 months prior to implementation of the Maintenance

Rule

until June 26, 1997, there had been nine separate

instances

where the check

valves had failed inspections.

Of these failures, there had been ARs written for,four

of the inspections which documented

that the valves were found stuck open.

Of

those, the licensee had evaluated three as not being MPFFs and the fourth, which

documented

the results of a June 25, 1997, inspection, had yet to be reviewed.

For the remaining five instances,

no evaluation had been performed since the

as-found stuck open condition of the valves had not been documented

in an AR.

The licensee was evaluating the cause of the three mischaracterized

MPFFs.

Licensee Procedural

Re uirements for Documentin

E ui ment Problems

Inter-Departmental Administrative Procedure

OM7-1D1, "Problem Identification and

Resolution - ARs," a..quality-relate'd

procedure,

requires that problems be

documented

on an AR. Attachment 7.2 to the procedure defines problem criteria,

in part, as conditions which render an item or activity unacceptable

or indeterminate

or could negatively impact the structure, system or component, if left uncorrected.

The failure to document the as-found inspection results, which indicated that the

associated

ASW pump vault check valve was inoperable, for inspections performed

on August 2 and 8, September

8, and November 16, 1994, and August 27, 1996,

as required by Inter-Departmental Administrative Procedure

OM7-ID1, is an apparent

violation of 10 CFR Part 50, Appendix 8, Criterion V, "Instructions, Procedures,

and

Drawings" (EEI 50-275;323/9714-02).

Reevaluation of Past ASW Pum

Vault Drain Check Valves Ins ections

After the historical inspection problems were brought to the attention of the

licensee by the inspector, the licensee reevaluated

the past failures of the valves to

-9-

determine whether the failures should be considered

as MPFFs.

The licensee

determined that all eight of the previous failed inspections within the 36 months

prior to the implementation of the Maintenance

Rule were MPFFs.

None of the

failed inspections

had previously been considered

as MPFFs.

Following the most

recent failed inspection of the check valves, the licensee determined that, in

addition to the eight prior MPFFs, the three check valve inspections performed on

June 26 and July 2-3, 1997, were also MPFFs.

The licensee had established

a criteria of a maximum of two MPFFs for placing the

ASW system in goal setting.

The licensee commenced

monitoring of the ASW

system as prescribed

in Section (a)(1) of 550.65 on April 17; 1997, based on two

instances

in which an ASW pump was declared inoperable due to excessive

packing

leakage and evaluated

as MPFFs.

The licensee began monitoring the ASW system

in accordance

with Section (a)(1) on July 31, 1997, based

on the clogged floor

drain check valves.

From July 10, 1996, the date of implementation of the Maintenance

Rule, the

licensee elected to not monitor the performance

or condition the ASW system

against established

goals under the requirements of Section (a)(1)..However, the

licensee had not demonstrated

that the performance

or condition of the QSW

system (specifically the floor drain check valves) had been effectively controlled

through the performance of.appropriate preventive maintenance

in accordance

with

Section (a)(2).

Eleven failures of these check valves had occurred from

August 2, 1994, to July 3, 1997.

Eight failures had occurred prior to the time that

the NRC inspector began to question the licensee about the historical performance

of the check valves.

The failure to evaluate the appropriateness

of the performance

of preventive maintenance for these chhck valves when placing and maintaining the

ASW system in Section (a)(2) is an apparent violation of 10 CFR 50.65(a)(2)

(EEI 50-275;323/9714-03).

Material Condition of ASW Pum

Floor Drains

Following the July 3, 1997, check valve inspection, licensee inspections of the

ASW pump vault rooms revealed numerous discrepancies

related to the floor drains,

which compromised the ability of the drains to keep debris out of the lines.

The

drains are constructed with a slotted cover plate and a strainer basket.

The

discrepancies

noted with the drains, are detailed below.

ASW Pump 1-1: the drain cover was missing and the drain basket was corroded

and was a source of debris to clog the drain lines.

ASW Pump 1-2: the drain basket was missing.

ASW Pump 2-1: the drain basket was corroded and needed to be replaced.

-10-

ASW Pump 2-2: the drain cover was intact but corroded and the drain basket was

missing.

Based upon the results of this inspection, the licensee developed

additional actions

to vacuum near the floor drains, remove and reinspect the check valves, replace

missing or corroded drain baskets

and covers, remove and clean the remaining drain

covers and baskets,

flush the drain lines with the check valves removed, and

install

a design change to put a screen

in the drain lines.

These actions appeared

to limit

the potential for debris entering the drain line.

Assessment

of Risk Associated With lno erable ASW Pum

Vault Drain Check

Valves

The ASW system

is a risk significant system and the loss of ASW is a risk

significant event.

In order for the failed check valves to result in a total loss of

ASW, flooding of the intake structure is required.

The sources of such floods would

be:

(1) severe wave conditions (e.g., tsunami), (2) circulating water system

ruptures in the intake invert area, or (3) flooding in an ASW pump vault which

eventually results in the backflooding.

The licensee estimated that the total increase

in the loss of ASW initiating event

frequency 6.6E-4/year as a result of the failed check valves resulted in an increase

in core damage frequency of 1.2E-5/year.

This, using the criteria of the EPRI PSA

Applications Guide, represents

a small to moderate increase in risk.

lf both ASW pumps were lost due to flooding,'he licensee contends that the plant

could be maintained in Mode 3 using auxiliary feedwater and natural circulation.

The CCPs could be cooled from the fire water system so that seal injection flow to

the reactor coolant pumps could be maintained.

During the time frame that the

plant is maintained in this configuration, there would be no cooling to other CCW

cooled components,

including ventilation systems,

so there are operational concerns

regarding the length of time that the licensee could stay in this alignment.

Conclusions

Maintenance activities performed failed to assure the reliable operation of the

ASW pump vault drain check valves.

Maintenance

personnel failed to appropriately document ASW pump vault

drain check valve inspection results in five instances

in which the valves

were found stuck open.

ASW pump vault drain check valve inspections

revealed numerous instances

in which the valves were stuck open and unable to prevent backflow into the

-11-

ASW pump vaults.

None of these were correctly evaluated by engineering

as being MPFFs, which is indicative of a weakness

in the implementation of

the Maintenance

Rule.

ASW pump vault drains had not been maintained

in accordance

with design

requirements,

since inspections

revealed corroded parts and drain cover

plates and strainer baskets that were missing.

Corrective actions for past failure of ASW pump vault drain check valves

were incomplete and ineffective.

In addition, there had been no evaluation

of the adequacy of corrective actions by the licensee's

Quality Services

organization.

III. ~En ineerin

E4 Engineering Staff Knowledge and Performance

E4.1

En ineerin

Resolution of Ino erable ASW Pum

Vault Drain Check Valves

Licensee Corrective Actions Followin

Identification of Concern for ASW Pum

Vault Drain Check Valve 0 erabilit

I

After the inspector raised the concern to licensee management

of the condition of

the floor drain check valves with the history of being clogged in the open position,

the ASW pump vault drain lines were flushed and then three of the four ASW pump

vault drain check valves were disassembled

and inspected.

The fourth valve had

been disassembled

and inspected the previous week and was found stuck open and

then cleaned, reassembled,

and returned to service.

Prior to the licensee disassembling

the valves, the inspector questioned

the basis for

considering the three valves that had not been inspected

operable.

The licensee

indicated that the flush of the line had most likely removed anything in the valves

that would cause them to stick open.

The inspector questioned

the licensee's

basis

for operability since, given the configuration of the piping, the design of the valve

and the material that had been previously found in the valves it appeared that

flushing of the valve could be ineffective.

Subsequent

inspection of the three

remaining check valves showed that two of the three valves were stuck open.

After the licensee completed the inspection of both Unit 2 valves and found one

valve stuck open, the ASW pump associated

with the Unit 1 valve that remained to

be inspected was declared inoperable.

Inspection of the remaining valve revealed

that it also was stuck open.

On July 3, 1997, the licensee made

a 1-hour

nonemergency

report to the NRC in accordance

with 550.72(b)(1)(ii)(B), after

having determined that Units

1 and 2 ASW systems

had been inoperable due to the

ASW pump vault drain check valves not being functional.

-1 2-

The licensee's

evaluation of past ASW check valve inspection results is described

in

Section M1.1 of this inspection report.

Review of Plant Floor Drains for Other Safet -Related

E ui ment

The inspector reviewed the maintenance

history for the check valves installed in the

floor drains of the DFOT pump vaults.

The check valves are included within the

mechanical structure, system, or component that are included within the scope of

the Maintenance

Rule for the emergency

diesel generator fuel transfer system.

The

DFOT pump vaults drain to the turbine building sump.

The maximum water level

before overflow of the turbine building sump is approximately at elevation 68 feet

6 inches.

The sump overflow weir flows into an 18-inch diameter drain pipe.

Therefore, backflow into the pump vault is unlikely from the turbine building.

Other

sources for backflow are other drain lines headered

with the DFOT pump vault

drains.

The Final Safety Analysis Report, Section 9.5.4.3(3), states that the vaults

are drained to the turbine building sump and are protected with backwater valves.

Maintenance

Histor

of DFOT Pum

Vault Drain Check Valves

Review of the maintenance

history showed that the DFOT pump vault backwater

check valves had historically passed

periodic inspections performed since October

1989.

However, the inspector noted that the backwater check valve for DFOT

Pump 0-2 (Valve DEG-0-1033) had failed an inspection performed on

September

15, 1994.

During the inspection, the valve was noted to have debris on

its disc that prevented the valve from stopping backflow.

Review of the associated

AR indicated that this had not been considered

as an MPFF. After questioning by

the inspector, the licensee determined that the failed inspection should have been

considered

an MPFF. At the time the valve failed the inspection, the licensee had

already planned

a design change for the floor drain to reduce the possibility of

debris entering the lines.

The inspector noted that the corrective actions planned,

and subsequently

completed by the licensee, reduced the susceptibility of the valve to becoming

clogged with the debris.

The inspector considered

the missed MPFF determination

a weakness

in the licensee's review process but that subsequent

corrective actions

were adequate

to prevent recurrence of a similar problem.

Conclusions

After questions

regarding the operability of the ASW pump vault drain check

valves arose, the licensee's

basis for the continued operability of the valves

that remained to be inspected was nonconservative

and not founded upon

good engineering judgement.

-13-

ES

Miscellaneous

Engineering

Issues (92903)

E.8.1

Closed

Ins ection Followu

Item 50-275 9506-02:

ASW vault drain calculation

for medium energy line break (M-270) did not address the limited capacity of the

intake structure sump pumps.

The inspector reviewed the licensee's

actions following NRC identification that

Calculation M-270, Revision 3, did not adequately

address the limited capacity of

the intake structure sump pumps.

The licensee subsequently

revised

Calculation M-270 to indicate that, with a MELB inside one of the ASW pump

vaults, the invert area of the intake would eventually flood to a level at which point

the ASW pump vault drain would no longer be able to pass all of the postulated

leak

rate.

Thus, the ASW pump motor in the room with the MELB would eventually be

submerged

and short and trip. The analysis assumed

no operator actions were

taken to limit the flooding.

The inspector concluded that Revision 3 to Calculation M-270 was incorrect in that

it did not adequately

consider the limited capacity of the intake structure sump

pumps.

Revision 4 to the calculation corrected this discrepancy.

In the event of a

MELB within an ASW pump vault, the intake structure sump drain system was not

relied upon by the licensee to assure the operability of the unaffected ASW pump.

The licensee relied upon the ASW pump vault drain check valves to prevent

backflooding.

As a result, the error in the calculation did not have any impact on

safety.

The licensee also revised the affected Design Criteria Memorandum to

reflect the results of Revision 4 to the calculation.

Based upon the above, this item

is closed.

V. Mana ement IVleetin s

X1

Exit IVleeting Summary

The inspectors presented

the inspection results to members of licensee management

at the

conclusion of the inspection on August 21, 1997.

In the meeting the licensee

acknowledged

the findings presented.

The inspectors asked the licensee whether any materials examined during tice inspection

should be considered

proprietary.

No proprietary information was identified.

ATTACHMENT

SUPPLEMENTAL INFORMATION

PARTIAL LIST OF PERSONS CONTACTED

Licensee

J. Anastasio,

Systc,m Engineer,

Engineering

Services

W. E. Coley, Engineer,

Regulatory Services

W. G. Crockett, Manager, Nuclear Quaiity Services

L. L. Fusco,

Maintenance

Rule Coordinator, Maintenance

Services

T. L. Grebel, Director, Regulatory Services

S. C. Ketelsen, Senior Engineer, Regulatory Services

=

R. F. Locke, PGSE Corporate Attorney

D. L. Miklush, Manager, Engineering Services

J. E. Molden, Manager, Operations Services

R. M. Nanniga, Engineer,

Engineering Services

M. N. Norem, Director, Mechanical Maintenance

J. L. Portney, Senior Engineer,

Engineering Services

R. P. Powers, Manager, Vice President

DCPP and Plant Manager

M. L. Smith, Supervisor,

Quality Services

R. L. Thierry, Director, Balance of Plant Engineering

B. J. Olson, Diablo Canyon Project Engineer

D. L. Proulx, River Bend Resident Inspector

I

INSPECTION PROCEDURES USED

IP62707:

Maintenance

IP37551:

Engineering

IP92903:

Followup - Engineering

IP92902:

Followup - Maintenance

IP92901:

Followup - Operations

ITEMS OPENED, CLOSED, AND DISCUSSED

~Oened

50-275;323/9714-01

URI

Failure to enter TS LCO Action Statement during ASW

pump vault drain check valve maintenance

50-275;323/971 4-02

EEI

Failure to document inoperable ASW check valves on

ARs

-2-

50-275;323/9714-03

Closed

50-275/9506-02

EEI

Apparent violation of 10 CFR 50.65 a(1)

IFI

ASW vault drain calculation for medium energy line

break did not address

the limited capacity of the intake

structure sump pumps

LIST OF ACRONYMS USED

AR

ASW

CCP

CCW

DFOT

EEI

IFI

IN

LCO

MELB

NCR

PDR

TS

URI

action request

auxiliary saltwater

centrifugal charging pump

component cooling water

diesel fuel oil transfer

apparent violation

inspection followup item

Information Notice

limiting condition for operation