Forwards Insp Repts 50-275/97-14 & 50-323/97-14 on 970804-22.Two Apparent Violations Identified & Being Considered for Escalated Ea.Predecisional Enforcement Conference Scheduled for 970922
ML16342D778
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/08/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D779 List:
References
50-275-97-14, 50-323-97-14, EA-97-369, NUDOCS 9709110074
Download: ML16342D778 (14)


See also: IR 05000275/1997014

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I ACCESSION NBR:9709110074

DOC.DATE: 97/09/08

NOTARIZED: NO

'ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific Ga

TH.NAME

AUTHOR AFFILIATION

YNNFT ~ PE

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERFG.M.

Pacific Gas

a Electric Co.

SUBJECT:

Forwards insp repts

50-275/97-14

& 50-323/97-14

on

970804-22.Two apparent violations identified

a being

considered for escalated

EA.Predecisional

enforcement

conference

scheduled for 970922.

DISTRIBUTION CODE:

ZEOZF

COPIES

RECEIVED:LTR

ENCL

I SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

I

DOCKET

05000275

05000323

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

~CEHRE

B

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

EXTERNAL: LITCO BRYCEFJ

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

"

..1

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOMFS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0

D

0

t.OADEO NQN

NRC FLOPPY

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 41S-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

UNIT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

SEP -8

1997

EA 97-369

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation

Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B14A

77 Beale Street, Room 1451

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC SPECIAL INSPECTION REPORT 50-275/97-14; 50-323/97-14

Dear Mr. Rueger:

An NRC special inspection was conducted August 4-22, 1997, at your Diablo Canyon

Nuclear Power Plant, Units

1 and 2, reactor facilities. The enclosed report presents the

scope and results of that inspection.

This inspection was conducted following

identification of issues involving the maintenance

of auxiliary saltwater pump vault drain

line check valves.

Based on the results of this inspection, two apparent violations were identified and are

being considered for escalated

enforcement action in accordance

with the "General

Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600.

The first apparent violation involves the failure to meet the requirements of

10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear

Power Plants," (Maintenance

Rule).

10 CFR 50.65 requires that the performance or

condition of structures, systems,

or components

(SSCs) be monitored against licensee

established

goals or that the licensee demonstrate

effective controls through preventive

maintenance

such that SSCs are capable of fulfillingtheir intended functions.

In particular,

the circumstances

at the Diablo Canyon facility involved numerous instances

in which your

staff failed to properly evaluate and take appropriate corrective actions after finding the

auxiliary saltwater pump vault drain line check valves were clogged with debris, a

condition that rendered the valves incapable of performipg their design function.

The

second apparent violation involves multiple examples of the failure to follow plant

procedures that require problems be documented

on an action request when they could

render SSCs unacceptable

or indeterminate if corrective action is not taken.

A Notice of

Violation is not presently being issued for these inspection findings.

In addition, please be

advised that the number and characterization

of the apparent violations described

in the

enclosed inspection report may change

as a result of further NRC review,

9709ii0074 970908

PDR

ADQCK 05000275

8

PDR

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIU

0

Pacific Gas and Electric Company

-2-

A predecisional enforcement conference to discuss these apparent violations has been

scheduled

for September

22, 1997.

The decision to hold a predecisional enforcement

conference

does not mean that the NRC has made

a final determination that a violation has

occurred or that enforcement action will be taken.

This conference

is being held to obtain

information to enable the NRC to make an enforcement decision, such as a common

understanding

of the facts, root causes,

missed opportunities to identify the apparent

violation sooner, corrective actions, significance of the issues,

and the need for lasting and

effective corrective action.

In particular, we expect you to address:

(1) why the failed

inspections were not properly documented

and evaluated

and what implications this'as

for other equipment within the scope of the Maintenance

Rule; and (2) during periods when

maintenance

was performed on the auxiliary saltwater pump vault drain check valves,

whether or not other safety-related

equipment was also removecf from service, and the

reportability of these events.

The NRC considers this to be a moderately risk significant event based on the event

duration and the potential common cause failure of the auxiliary saltwater systems for

Units

1 and 2. The NRC has reviewed the risk assessment

that was performed by your

staff and agrees with the overall conclusions.

In considering the operator mitigating

actions, we request that you address

in the predecisional enforcement conference the basis

for the specified flow rate of the backup fire water cooling system that supplies the

centrifugal charging pumps in the event that component cooling water is lost.

In addition, the conference

is an opportunity for you to point out any errors in our inspec-

tion report and for you to provide any information concerning your perspectives

on:

(1) the

severity of the violation, (2) the application of the factors that the NRC considers when it

determines the amount of a civil penalty that may be assessed

in accordance

with

Section VI.B.2 of the Enforcement Policy, and (3) any other application of the Enforcement

Policy to this case, including the exercise of discretion in accordance

with Section Vll.

This conference will be open to public observation.

You will be advised by separate

correspondence

of the results of our deliberations on this

matter.

No response

regarding these apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

I Should you have any questions concerning"this Inspection, we will be pleased to discuss

them with you.

Since

y,

Thomas P. Gwynn

Dire

or

Division of Reacto

Proj cts

Pacific Gas and Electric Company

-3-

Docket Nos.:

50-275

50-323

License Nos.:

DPR-80

DPR-82

Enclosure:

NRC Inspection Report

50-275/97-1 4; 50-323/97-1 4

cc w/enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman BurnshMr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cess Street, Suite

D'onterey,

California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

IIII

Pacific Gas and Electric Company

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California 93406

Pacific Gas and Electric Company

-5-

SEP -8 l997

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

W. L. Brown, RC

OE:EA File, (MS: 7-H5)

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

G. F. Sanborn,

EO

J. Lieberman, OE, (MS: 7-H5)

(I

DOCUMENT NAME: R:i DC'tDC714RP.MDT

To receive copy of document,

Indicate ln box: "C" = Copy without enclosures

"E" =

o

ith enclosures "N"= No copy

RIV'SRI;DRP/E

MDTschiltz:jb

C:DRP/E

HJWong

GFab

n

DAPower

CMB

E

RIVE

D:DRP

TP wynn

9/2/97

9/2/97

9/

97

FFI IAL RECORD COP

9

97

9

/97

Pacific Gas and Electric Company

-5-

SEI - 8

I~~"7

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

"bcc to DCD (IE0,$

)"'cc

distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

W. L. Brown, RC

OE:EA File, (MS: 7-H5)

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

G. F. Sanborn,

EO

J. Lieberman, OE, (MS: 7-H5)

DOCUMENT NAMe: R:i DCi,DC71aRP.MDT

To receive copy of document, indicate in box: "C" = Copy without enciosures

"E" =

o

ith enciosures "N"= No copy

RIV:SRI:DRP/E

MDTschiltz:jb

9/2/97

C:DRP/E

HJWong

9/2/97

9/g/97

9

97

OFFI

IAL RECORD C

PY

C:MB

C

RIV:E

DAPower~

GF

a

b

n

D:DRP

TP wynn

9

/97