~pg RK0II fp 4
0 Cy ClO 0 Q
+**4+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYANPLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 OCT P 5 Sgs Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177
SUBJECT:
TRAININGAND QUALIFICATIONPLAN CHANGES
Dear Mr. Rueger:
This letter acknowledges receipt of your letter dated August 14, 1996, which transmitted Change 1 to Revision 4 to the Training and Qualification Plan for the Diablo Canyon Nuclear Power Plant, submitted under the provisions of 10 CFR 50.54(p).
Based on your determination that the changes do not decrease the overall effectiveness of your training and qualification plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p).
Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.
The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.
In accordance with 10 CFR 2.790 of the Commission's regulations a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, Docket Nos.
50-275 50-323 License Nos.
DPR-80 DPR-82 enneth oc an, Acting Director Division of Reactor Safety 96ii040018 96i025 PDR ADOCK 05000275 F
0
Pacific Gas and Electric Company CC:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120
Pacific Gas and Electric Company Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424
Pacific Gas and Electric Company bcc to DMB (IE53) bcc by RIV:
L. J. Callan Resident Inspector Branch DRS/PSB RIV Docket File Elaine Koup (NRR/DRPM/SGB, MS: 9D24)
DRS/PSB Security File (Goines)
DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
M. Hammond (PAO, WCFO)
MIS System Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
NRR/DRPM/SG 8 NRR Docket File RITS Coordinator (Elko)
DRS Al File 96S0051S DOCUMENT NAME: G:iDRSLTRSttAI60051S.DWS To receive copy of document, Indicate in box: "C" = Copy without nclosures "E" = Copy with enctosures "N" = No copy RIV: PSB E
C:PSB E
AD:DRS N
DWSchaefer 10/
/96 BMMurray KEBrockma 10/
/96 10/