Forwards Insp Repts 50-275/96-12 & 50-323/96-12 on 960513- 17.Violations Noted:Licensee Failed to Determine Magnitude of Avk Test Equipment Bias & Correlation Factors Per
ML16342D342
Person / Time
Site: Diablo Canyon  
Issue date: 06/17/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D343 List:
References
EA-96-180, NUDOCS 9606260043
Download: ML16342D342 (6)


See also: IR 05000275/1996012

Text

~g REJIG~ ~o

'

Cy

Cn0

IlO

O

c7

~O

+>>*w"

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REG.IDN IV

611 RYAN PLA2A DRIVE, SUITE 400

ARLINGTDN,TEXAS 76011.8064

EA 96-180

JUN iV 8B

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory H. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT.

NRC

INSPECTION

REPORT 50-275/96-12,

50-323/96-12

This refers'o

the special

inspection

conducted

by Nr. David Corporandy

and

Hs.

Paula Goldberg of this office on Nay 13-17,

1996,

and in-office review of

information through

Hay 28,

1996, of the Diablo Canyon Nuclear

Power Plant,

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted safely

and in accordance

with NRC requirements.

At the conclusion of the inspection,

the findings were discussed

with you and

those

members of your staff identified in the enclosed report.

Areas

examined =-during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

two apparent violations were

identified and are being considered for escalated

enforcement

action in

accordance

with the "General

Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy),

NUREG 1600.

The apparent

violations are discussed

in the enclosed report.

The first apparent violation

involves the failure to promptly identify and correct conditions

adverse

to

quality (out-of-tolerance

main steam safety valves).

The second

apparent

violation involves two examples of the failure to follow the operability

evaluation

procedure related to the evaluation of the main steam safety valve

testing results.

These

apparent violations contributed to not promptly

identifying a condition that could have placed the Unit

1 steam generators

outside their design

bases.

'

predecisional

enforcement

conference

to discuss

these

apparent violations

'as

been

scheduled for July 1,

1996.

We also request that you discuss

the

failure to determine

the magnitude of the

AVK test

equipment

bias

as stated

in

your November

1,

1995, letter.

The decision to hold

a predecisional

enforcement

conference

does

not mean that the

NRC has determined that

a

violation has occurred or that enforcement

action will be taken.

Accordingly,

9606260043

9606iT

poa

Aoocw osooo275

8

PM

Pacific

Gas

and Electric Company

no Notice of Violation is presently

being issued for these

inspection

.findings.

In addition, please

be advised that the number

and characterization

of apparent violations described

in the enclosed

inspection report

may change

as

a result of further

NRC review.

The conference is being held to obtain

information to enable the

NRC to make

an eriforcement decision,

such

as

a

common understanding

of the facts, root causes,

missed opportunities to

identify the apparent violations sooner,

corrective actions,

significance of

the issues,

and the

need for lasting

and effective corrective action.

In addition, this is an opportunity for you to point out any errors in our

inspection report

and for you to provide any information concerning

your,

perspectives

on:

(1) the severity of the violations,

(2) the application of

the factors that the

NRC considers

when it determines

the

amount of a civil

penalty that

may be assessed

in accordance

with Section VI.B.2 of the

Enforcement Policy,

and (3) any other application of the Enforcement Policy to

this case,

including the exercise of discretion in accordance

with Section

VII.

You will be advised

by, separate

correspondence

of the results of our

deliberations

on this matter.

No response

regarding

these

apparent violations

is required at this time.

In accordance

with 10 CFR 2.790 of the, NRC's "Rules of Practice,"

a copy of

this letter .and its enclosure will be placed in the

NRC Public Document

Room.

Sincerely,

'v

J

J.

E. Dyer, Director

Division of Reactor Projects

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

NRC Inspection

Report

50-275/96-12;

50-323/96-12

cc w/enclosure:

Dr. Richard

Ferguson

Energy Chair

.

Sierra

Club California

1100 11th Street,

Suite

311

Sacramento,

California

95814

Pacific

Gas

and Electric Company

Hs.

Nancy Culver

San Luis Obispo Mothers for Peace

P.O.

Box 164

Pismo Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach, California

93448

Managing Editor

The County Telegram Tribune

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government

Center

San Luis Obispo, California

93408

Hr. Truman Burns)Hr.

Robert Kinosian

Cali'fornia Public Utilities Commission

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Robert

R. Wellington,

Esq.

Legal

Counsel

Diablo Canyon

Independent

Safety

Committee

857 Cass Street,

Suite

D

Monterey, California

93940

Hr. Steve

Hsu

Radiologic Health Branch

State

Department of Health Services

P.O.

Box 942732

Sacramento,

California

94234

Peter

H. Kaufman,

Deputy Attorney General

State of California

110 West

A Street,

Suite

700

San Diego, California

92101

Christopher J.

Warner,

Esq.

Pacific

Gas

and Electric Company

P.O.

Box 7442

San Francisco,

California

94120

Pacific

Gas

and Electric Company

Warren

H. Fujimoto, Vice President

and Plant Hanager

Pacific

Gas

and Electric Company

Diablo Canyon

Power Plant

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV Fil e

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

G.

F. Sanborn

W. L. Brown

WCFO File

Resident

Inspector

MIS System

Sr Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

G.

M. Vasquez

J.

Lieberman,

OE,

MS: 7-H-5

OE

EA File,

MS: 7-H-5

DOCUMENT NAME:

R: tI, DC~tDC612RP. DEC

  • Previous

concurrence

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with

n losures "N" ~ No copy

'IV:DRP/E

E

RIV:DRS

E

C:DRP/E

E

D:WCFO

06/14/96

06/13/96

  • DCor orandy
  • PGoldber

06/,

/96

06/Ip/96

HJWon

7

KEPerkins

I

I

0