Insp Repts 50-275/96-12 & 50-323/96-12 on 960513-28. Violations Noted.Major Areas Inspected:Licensee Actions in Response to Test Results Obtained During Apr 1996 Augmented Testing of Unit 1 MSSV Pressure Setpoints
ML16342D344
Person / Time
Site: Diablo Canyon  
Issue date: 06/17/1996
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342D343 List:
References
50-275-96-12, 50-323-96-12, NUDOCS 9606260051
Download: ML16342D344 (14)


See also: IR 05000275/1996012

Text

ENCLOSURE

U.S.

NUCLEAR REGULATORY COMMISSION

REGION IV

Inspection Report:

50-275/96-12

50-323/96-12

Licenses:

Licensee:

DPR-80

DPR-82

Pacific

Gas

and Electric Company

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

Facility Name:

Diablo Canyon Nuclear

Power Plant, .Units

1 and

2

Inspection At:

Diablo Canyon Site,

San Luis Obispo County, California

Inspection

Conducted: 'ay 13,

1996,

through

Hay 28,

1996

Inspectors:

D. Corporandy,

Project Engineer

P. Goldberg,

Reactor

Inspector

Approved:

on

C se

,

ctor

rogects

rane

C~gvlr c

Date

Ins ection

Summar

Areas

Ins ected

Units

1 and

2

Special,

announced

inspection of the

licensee's

actions in response

to the test results

obtained during the

April 1996 augmented

testing of the Unit

1 main steam safety valves

(MSSVs)

pressure

setpoints.

Results

Units

1 and

2

An Unresolved

Item was identified involving the licensee's

failure to

determine

the magnitude of AVK test equipment bias, correlation

factors

(CFs), for all

20 Unit

1 HSSVs during

1R7 as stated

in PG&E's

letter to the

NRC dated

November

1,

1996 (Section 1.3).

An apparent violation of 10 CFR Part 50, Appendix B, Criterion XVI, was

identified for the licensee's

failure to promptly identify and correct

out-of-tolerance

setpoints

on Unit

1

HSSVs following augmented

testing

of- the steam

Lead

1 HSSVs

on April 2,

1996 (Section 3.3).

9h0626005f 9606i7

PDR

ADQCK 05000275

8

,PDR

Two examples of an apparent violation of 10 CFR Part 50, Appendix B,

Criterion V, were identified for'the licensee's

failure to follow

procedures:

(1) to notify the Operations Shift Foreman of a deficient

condition, i.e., three of five HSSVs out-of-tolerance

high,

and (2) to

document

a prompt operability assessment

within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of

identification (Section 4).

NRC inspectors

identified two weaknesses

in the licensee's

HSSV

augmented

testing

program which may have contributed to the problems

encountered

during the April 1996- augmented testing:

(1) the

HSSV

augmented testing

program was not sufficiehtly formalized,

and

(2) the

licensee

did not sufficiently plan for the evaluation

process

and

actions to be taken, following the augmented testing

(Section 5).

Summar

of Ins ection Findin s:

Unresolved

Item 275/96012-01

was opened.

An apparent violation of 10 CFR Part 50, Appendix B, Criterion XVI, is

identified in Section 3.3 (Violation 275/96012-02).

Two examples of an apparent violation of 10 CFR Part 50, Appendix B,

Criterion V, are identified in Section

4 (Violation 275/96012-03).

Attachments:

Attachment

1 - Persons

Contacted

and Exit Heeting

Attachment

2 Acronyms

DETAILS

1

BACKGROUND

l. 1

Overview of A ril 1996

MSSV Testin

On April 2,

1996, the licensee

conducted

augmented

testing to determine

the

"as-found" pressure

setpoints of the five Unit 1,

Steam

Lead

1 HSSVs.

Testing

results

showed three of the five NSSVs,to

be out-of-tolerance

(high).

On

April ll, 1996,

the licensee

tested

the five Unit 1,

Lead

2 MSSVs and found

.

three of five HSSVs to be out-of-tolerance

(high).

On April 12,

1996,

preliminary results of the licensee's

evaluation of the test results following

the

Lead

2 testing determined that the out-of-tolerance

NSSVs would have

caused

steam generator

pressure

to exceed

the

110 percent

design pressure

by

8 psi.

The licensee

reported this condition to the

NRC in accordance

with

10 CFR 50.72.

The licensee did not test the

HSSVs

on the remaining leads until April 14,

1996.

At that time, five of five Lead

3 HSSVs

and

one of five Lead

4 HSSVs

were found to be out-of-tolerance

(high).

The licensee's

subsequent

evaluation of the condition indicated that the

Lead

3 steam generator

would

have

exceeded

110 percent of design

pressure

by 27 psi.

The inspectors

reviewed these

events,

the available data at the time,

and the

licensee's

actions

based

on the test results.

1.2

Desi

n Bases of Diablo Can

on

MSSVs

Diablo Canyon

has five NSSVs

on each of four separate

main steam leads for a

total of 20 MSSVs per unit.

Each of the five NSSVs

on

a lead

has

a different

set pressure

varying from a low nominal set pressure

of 1065 psig with a

tolerance of -2 percent,

+3 percent to

a high set pressure

of 1115 psig with a

tolerance of +3 percent.

The primary function of the

HSSVs under

a design

basis

accident is to prevent

steam generator

pressure

from exceeding

110 percent of design pressure

(1194 psig).

In addition,

another function of

the

HSSVs is to limit steam generator

pressure

to allow the auxiliary

feedwater

(AFW) pump to maintain required flow greater

than

440 gpm.

The

licensee

has submitted

a license

amendment

request

to reduce the

AFW minimum

flow requirement

from 440

gpm to 410 gpm.

The flow is affected

by the lift

pressure

of the lowest lifting MSSV.

The nominal set pressure

of the lowest

set

MSSV is 1065 psig.

1.3

Histor

of Diablo Can

on

MSSVs

Out-of-Tolerance Setpoints:

Diablo Canyon

has

had

an history of HSSVs being

found outside of the Technical Specification

(TS) tolerance.

On February

9,

1994, for Unit 1,

and

on March 5,

1994, for Unit 2, while performing setpoint

testing

on the

NSSVs,

13 Unit

1 valves

and

15 Unit 2 valves did not meet the

TS setpoint tolerance of +1 percent.

The setpoints of the valves

were

out-of-tolerance,

both high and low.

Trevitest test equipment

had

been

used

to perform the tests.

The licensee's

operability evaluations

determined that

neither of the units would have

exceeded

their design basis with the

out-of-tolerance

NSSVs.

During the

1R6 outage

which followed the February

1994 testing,

the licensee

removed the Unit

1 NSSVs

and sent

them to the

Westinghouse

Service

Center test facility where the valves were refurbished

and reset

using live steam.

Just prior to the Unit

1

1R7 refueling outage in September

1995, the licensee

performed preoutage

set pressure

testing

on the Unit

1 MSSVs.

The as-found

results of the tests

were that

19 of the

20 NSSVs exceeded

TS tolerances

with

the following detailed results:

12

NSSVs with initial set pressure

> 6 percent

Il

3

6 percent

3

1

3 percent.

Additional testing

was conducted

on the valves

and eight of the twenty

required 'adjustment.

The other out-of-tolerance

valve setpoints drifted into

the acceptable

range

as

more tests

were run.

Prior to this testing,

the

licensee

had

used Trevitest test equipment for MSSV in-situ testing.

Commencing with this testing,

the licensee

switched to AVK test equipment.

The licensee's

operability evaluation

determined that the out-of-toleranc'e

NSSVs would have caused

the steam generator

pressures

to exceed the

110 percent

design allowable.

In response

to the Unit

1 findings, the licensee initiated testing the

20

Unit 2 MSSVS.

On September

22-24,

1995, the licensee

completed testing

16 of

the

20 valves. 'he as-found results of the tests

were:

5 MSSVs with initial set pressure

> 3 percent

5

II

1 - 3 percent

5

<

1 percent

1

< -3 percent.

After the sixteenth valve had

been tested,

Unit 2 experienced

a reactor trip

and four of the low setpoint

NSSVs lifted.

The valves were supposed

to open

at

1065 psig,

but all four. opened

low, between

1023 psig and

1050 psig.

Prior

to the plant trip, the licensee

had adjusted

Valve RV-3 by lowering the

setpoint,

since the as-found setpoint

had

been out-of-tolerance

on the high

side.

It was also noted that at the time of the reactor trip, RV-7, the valve

which lifted at

1023 psig,

was in the process of being adjusted,

and the

adjusting nut/locknut assembly

had not 'yet been retightened

when the reactor

trsp occurred.

The licensee

used the

AVK equipment to test the valves.

Individual

MSSV Setpoint Distribution:

After the plant trip, the licensee

performed

a series of tests

using the

AVK test

equipment to determine

valve

setpoints.

Selected

valves were set pressure

tested

10 to 20 times each.

The

licensee

concluded that

each valve had

a defined setpoint distribution in the

shape

of'

bell curve.

They also concluded that this distribution was valve

dependent

and could range outside of the allowable tolerance.

The licensee

stated that adjustments

to the valve setpoint

should only be made

once the

setpoint distribution curve was

known.

Once

known, the licensee

concluded

that the valve could

be adjusted

by moving the

mean setpoint value.

'License

Amendment to Increase

Allowable MSSV Setpoint Tolerance:

On

September

30,

1995, the licensee

submitted

License

Amendment

Request

95-06,

"Request for Emergency

Review and Approval of Change to TS 3.7. 1. 1,

Table 3.7-2-2

Increase

in Setpoint Tolerances for HSSVs."

The request

was

made to change

the set pressure

tolerance of the

HSSVs from +1 percent to

+3 percent

and -2 percent for the lowest set pressure

HSSVs

on each

steam lead

and

+3 percent for the remaining

HSSVs.

The licensee

made this request,

since

they concluded that each

HSSV had

a setpoint distribution specific to each

valve that might exceed

+1 percent,

and because

steam generator

pressure

and

AFW flow were demonstrated

by analysis to remain within the original design

basis with the proposed

increased

setpoint tolerances.

In addition, the

licensee

stated that the liftdistribution would occur whether the valve was

set

on live steam or with an hydraulic lift device.

The licensee

based this

conclusion

on the tests results

from the September

12-29,

1995, testing.

As a.

condition of the

amendment,

the licensee

committed to perform augmented

testing of all the

HSSVs based

on

a test schedule starting

3 months after the

seventh refueling outages for the respective units with the initial augmented

testing to involve one steam lead at

a time.

Testing Methods:

Both Trevitest

and

AVK test

equipment

use,an

hydraulic lift

assist

methodology whereby the steam pressure

present

at testing is "assisted"

by an additional hydraulic force to lift the safety valve disk off its seat;

hence,

providing

an onset of steam flow through the safety valve.

The

principal difference

between

the Trevitest

and

AVK test methodology is that

Trevitest detects

the onset of safety valve opening

by relying on the test

technician to hear

a hiss or pop from the valve,

whereas

the

AVK test

equipment

uses

an acoustic

sensor to electronically detect

the onset of safety

valve opening.

AVK Correlation Factor

(CF):

The licensee

stated that in 1994 they had

conducted

a test

program testing the

HSSVs at the Westinghouse

Service Center

using both live steam

and the

AVK device.

The licensee

stated that they found

that there

was good correlation

between

the setpoints

measured

on live steam

and the

AVK device.

In

PGEE Letter DCL-95-241 of November

1,

1995,

the

licensee

committed to perform additional testing during the seventh refueling

outages for each unit to determine

the magnitude of the

AVK test equipment

bias

compared to live steam.

During the seventh refueling outages for each

unit, the licensee

measured

AVK test method liftdistributions to develop

CFs

between-live

steam

and

AVK testing.

Apparently,

due to equipment

problems at

the test facility and the licensee's

decision not to .delay the refueling

outage,

CFs were developed for only nine of the

20 Unit

1 HSSVs.

CFs were

developed for all five of Steam Generator

(SG)

1-1

HSSVs,

and four of five

SG 1-2 HSSVs.

CFs

have not yet been

developed for the

HSSVs of SGs

1-3 and

1-4.

CFs for the nine Unit

1 HSSVs averaged

about

1 percent with a maximum

CF

of 1.4 percent.

The licensee

did not inform the

NRC of the decision not to determine

the

magnitude of AVK test equipment bias for all 20 Unit

1 HSSVs

as committed in

the November

1,

1995, letter until after restart

from 1R7.

This is identified

as

an Unresolved

Item pending the licensee's

review and discussion with the

NRC of the basis for the decision

(URI 50-275/96012-01).

1.4

Periodic

TS Surveillance Testin

Versus

Au mented

HSSV Testin

The licensee

uses

AVK test equipment for both periodic

TS surveillance testing

and augmented

HSSV testing to obtain

HSSV setpoint pressures.

As-found

setpoints

are required to be within the

amended

TS tolerances.

One

HSSV at

a

time is'ested.

Before proceeding

to the next

HSSV to be tested,

the tested

HSSV is returned to within +1 percent of its nominal setpoint.

.This is

demons6 ated

by achieving

two consecutive lifts within the required tolerance.

Uncorrected out-of-tolerance

HSSVs are subject to the actions required

by

TS 3/4.7. 1 "Turbine Cycle, Safety Valves."

All 20 HSSVs of a unit are tested

during the periodic

TS surveillance testing.

Under the licensee's

commitment to perform augmented testing of the

HSSVs

(refer to

PG&E Letter DCL-95-241 dated

November

1,

1995,

and

LER 1-96-003-00),

the Unit

1 augmented testing involves testing the

HSSVs of one steam

header

at

a time conducted

on

a staggered

basis at

3 month intervals.

The

TS

surveillance testing is performed

under licensee

Test Procedure

STP H-77,

"Safety and Relief Valve Testing," which requires verification that the valves

meet lift setpoint requirements

of the

ASHE Boiler and Pressure

Code,

Section

XI, 1977, with Addenda through

Summer of 1978.

ASHE Section

XI requires

testing of additional valves, if any valves in the sample set are found to be

out-of-tolerance.

1.5

Assum tions

on the Causes of HSSV Set Pressure Drift

The licensee

postulated

causes for the set pressure drift of the

HSSVs

as

follows:

Thermal bonding/Hiero-welding:

The

HSSVs have different materials for the

disc

and nozzle seats.

The licensee

postulated that,

since the nozzle

and

disc seats

were of different materials with different coefficients of thermal

expansion,

during valve heatup the valve seats

could gall.

The licensee

postulated that galling would provide

a mechanism for micro-welding and

thermal

bonding of the seats

which would cause

the first liftto be high.

In

April 1996,

the licensee

believed that this was the probable

cause of the high

initial,set pressures.

The licensee further postulated that subsequent lifts

would tend to exhibit lift pressures

which would drift to the initial set

pressure

assuming

the valves

remained

at temperature.

The licensee

also

considered

that time,interval

between lifts might be

a factor in the thermal

bonding of the valve seats.

Setting

on Live Steam Versus

AVK Hethod:

The licensee

stated that differences

were observed in lift pressures

depen'ding

on whether the lift was achieved

entirely due to steam pressure

or in part due to steam pressure

plus hydraulic

I'

lift assist

from the

AVK test equipment

used at Diablo Canyon.

During the

April Unit 2 outage,

the licensee

performed

HSSV set pressure

testing

on the

20 Unit 2 valves at

a test facility.

The licensee

noted that there were

differences

in measured

set pressures

between testing using only steam

pressure

to initiate and measure lift point and testing

using partial

steam

pressure

(approximately

90 percent of the lift point) plus hydraulic assist

from the

AVK test

equipment.

The licensee

developed

CFs for each valve and,

as noted

above,

found that

on average

the

CFs were

+1 percent with a maximum

of +1.4 percent.

Lift Distribution/Signature:

As mentioned in Section

1.3 of this report,

the

licensee

concluded

from additional testing in September

1995, that each valve

had

a defined setpoint distribution similar to

a bell curve.

The licensee

also concluded that this distribution was valve dependent

and could range

outside of the setpoint tolerance.

This was

one consideration

in the

licensee's

application for a

TS amendment to increase

the allowable

HSSV

out-of-tolerance

setpoint values.

It appears

that the licensee

recognized this

phenomenon

as

a result of

investigating out-of-tolerance

problems with Diablo Canyon's pressurizer

safety valves.

The pressurizer

safety valve design is similar to the

HSSV

design.

The licensee identified that under lo'ading the safety valve spring

experiences

minute buckling which apparently

caused

the safety valve setpoint

pressure

repeatability problems,

an industry-wide problem.

The licensee

sponsored

development of a prototype valve with a modified upper

spring washer

assembly

designed

to reduce the spring buckling and pivoting.

Preliminary results of the prototype testing

showed

a significant reduction in

liftdistribution (i.e., significant improvement in setpoint pressure

repeatability).

The valve manufacturer

acknowledged that the modification

would not affect the ability of the valve to lift, relieve its rated capacity,

and close (i.e., maintain its overpressure

protection function and reclose

after blowdown).

2

SE(UENCE

OF

EVENTS

On April 2,

1996, the licensee

performed

augmented testing

on the five Unit 1,

Lead

1

HSSVs

as specified

in" the licensee's

TS amendment

submittal.

All five

Lead

1

HSSVs

had

AVK CFs.

Upon completion of the

Lead

1 testing

(and

resetting of HSSV lift setpoints

as necessary),

the licensee

noted that the

as-found setpoints

of three of the five HSSVs were out-of-tolerance

(high).

Initially, the site engineering

personnel

responsible

for performing the test

decided not to document

a prompt operability assessment

(POA),

because

they

believed that the conditions

observed

on April 2 were enveloped

by conditions

already evaluated

in a previous operability evaluation

(OE 94-02,

Revision 4,

"Operability of HSSVs with Potentially High Initial Lift Setpoints").

According to the licensee,

although the decision

was

made not to document

a

POA, offsite engineering

was tasked with analyzing the as-found conditions

observed

on the five Lead

1

HSSVs

and projecting the results to the other

three Unit

1 leads.

In addition to projecting the out-of-tolerance

high lift

setpoints

to the

HSSVs

on the other leads,

the in-tolerance

HSSVs were

assumed

to be high at the maximum allowable

(3 percent

above nominal) setpoint,for

their respective

HSSVs.

Engineering

also modelled

an additional

3 percent of

nominal pressure

to account for pressure

accumulation during the initial 'lift.

The results of the analysis

showed that the maximum allowable steam generator

pressure,

110 percent of design pressure,

would not have

been

exceeded.

On April 4,

1996,

Engineering

conveyed the results of this analysis

as

an

update to the action request

associated

with the April 2 testing.

Engineering

did not document their evaluation of the adequacy of AFW flow.

However, in

response

to questioning

by the inspectors,

offsite engineering

explained that

they did not document

an evaluation of AFW flow adequacy

because

they did not

consider it to be

a problem.

At the time, they did not believe it to be

a

problem because

AFW flow is not credited in the accident

analyses

until

60 seconds after the beginning of the design

basis event.

AFW flow depends

on

the lift pressure

of the

HSSV with the lowest lift point.

For the first

60 seconds

an

HSSV would be expected

to cycl'e open several

times.

The April 2

testing

showed that once the initial lift of the low setpoint

HSSV was

achieved,

subsequent lifts demonstrated

a lower lift pressure

than the initial

lift pressure.

This data

was consistent with the licensee's

thermal

bonding/micro-welding assumption.

On April 8,

1996, the licensee

discussed

the

Lead

1 test results with NRC

personnel

(Region- IV and

NRR).

During the April 8 discussion,

the licensee

expressed

their intention to tes't the Unit

1

Lead

2 HSSVs.

It was noted that

four of five of the

Lead

2 HSSVs

had

AVK CFs.

Upon completion of the

Lead

2 testing

on April ll, 1996, the licensee

noted

that the as-found setpoints- of thre'e of the five HSSVs

had

been

out-of-tolerance

(high).

On April 12,

1996,

the licensee's

operability

evaluation

concluded that

110 percent

maximum allowable pressure

(Steam

Generator

1-2) would have

been

exceeded

as

a result of the out-of-tolerance

Lead

2 HSSVs.

The licensee

reported

the condition to the

NRC in accordance

with 10 CFR 50.72.

On April 12, the

NRC questioned

the licensee

as to the

potential for the

HSSVs

on the other two untested

leads to be out-of-tolerance

and whether the plant remained within its design basis.

The licensee

erroneously

responded

that the plant remained within design basis

based

on the

first ten

HSSVs having been reset to +1 percent.

The licensee

did not test the

HSSVs

on the other 'two 'leads until Sunday,

April 14,

1996.

The April 14 testing revealed that five of five HSSVs

on

Lead

3

(Steam Generator

1-3) were out-of-tolerance

(high)

and

one of five

HSSVs on Lead

4 was out-of-tolerance

(high).

According to the licenseee's

calculations,

the

Lead

3 results

would put Steam Generator

1-3 outside its

design basis.

The inspectors

also noted that at the conclusion of the April 11,

1996,

testing,

one

HSSV on Lead

2 was left at 1.2 percent out-of-tolerance,

and at

the conclusion of testing

on April 14,

1996,

one

HSSV on Lead

3 was left at

1.2 percent out-of-tolerance.

This was discussed

with the

NRC.

On April 21,

1996,

the two HSSVs were reset to within +1 percent

using the

AVK test

equipment.

3

UNIT

1

AUGMENTED TESTING

3. 1

Evaluation of Data Followin

the

A ril 2

1996

Testin

Evaluation of OE 94-02, Revision 4:

Following the April 2,

1996, testing of

the Unit

1 Lead

1 HSSVs, onsite engineering

decided not to document

a

POA,

because

they believed that the conditions

observed

on April 2 were enveloped

by conditions already evaluated

in

a previous operability evaluation

(OE 94-02,

Revision 4).

The inspectors

reviewed

OE 94-02,

Revision 4,

and the

April 2 test results.

The inspectors

observed that

OE 94-02,

Revision 4,

evaluated

AFW flow adequacy

based

on the

1065 psig nominal setpoint valve

lifting at

3 percent high.

The April 2 as-found lift setpoint of the Unit 1,

Lead

1

1065 psig valve was 7.5 percent high,

and therefore,

not enveloped

by

the

OE 94-02 evaluati'on

as

assumed

by the licensee.

The licensee

'acknowledged

the inspectors

observations.

Evaluation Considering

September

1995 Unit

1 Test Results:

The inspectors

noted that in addition to

OE 94-02,

information from the recent

September

1995

test results

was available.

The inspectors

compared

the April 2 Lead

1 test

results with the September

1995 data.

The inspectors

noted that the April 2,

1996, test results

were generally consistent

with the results of the September

1995 testing in that the as-found setpoints

were all above the nominal

setpoint.

The only exception

was

HSSV RV-6, which had

an as-found setpoint

1.9 percent

below the nominal setpoint.

This apparent

anomaly

may be

explained

by previously established

setpoint behavior characteristics,

namely,

the setpoint bell curve distribution and the

AVK CF for RV-6.

The inspectors

noted that the licensee's

evaluation of the September

1995 out-of-tolerance

HSSVs

was available at the time and that it demonstrated

that the

110 percent

design basis

steam generator

pressure

would have

been

exceeded.

Since the

Unit

1 April 2,

1996, test results

were generally consistent with the Unit

1

September

1995 test results, it would seem prudent to have considered

the

September

1995 results

as well as the April 2,

1996, results

when evaluating

the potential for out-of-tolerance

conditions to exist

on the remaining

untested

Unit

1 HSSVs.

3.2

Res

onse to Results of A ril 11

1996

Testin

On April 11,

1996,

the licensee

tested

the Unit

1 Lead

2 HSSVs

and found three

of five Lead

2 HSSVs to be out-of-tolerance

(high).

The licensee

performed

a

POA which was completed

on April 12,

1996.

The

POA showed that the

out-of-tolerance

HSSVs would have

caused

the

110 percent design basis

SG

pressure

to be exceeded.

The licensee

did not test the remaining ten Unit

1

HSSVs until April 14,

1996.

The inspectors

considered

that

on April 12,

1996, the licensee

had determined

that the out-of-tolerance

Unit

1

Lead

2 HSSVs would have placed the plant in a

-10-

condition outside of its design basis.

These conditions were steam lead

dependent.

In other words, the fact that the

Lead

2 HSSVs

had

been reset

had

no bearing

on the condition of the

MSSVs on steam

Leads

3 and 4. If the

HSSV

out-of-tolerance

conditions

on steam

Leads

3 or 4 were similar to those

found

on the'ead

2 HSSVs,

then their respective

SG would also

be outside of the

design basis.

The inspectors

considered that the test information available to the licensee

after completion of the

POA on April 12, provided

a reasonable

doubt about the

setpoint tolerances

on the remaining

10 Unit

1 HSSVs

and their ability to

. maintain their respective

steam generators

within the design basis in the

event of a postulated

accident.

3.3

Conclusion

I

The inspectors

considered that the lack of a documented

POA contributed to the

licensee's

incomplete evaluation of the April 2 test results,

which resulted

in a missed opportunity to promptly identify and correct the out-of-tolerance

conditions which existed for HSSVs

on the untested

steam leads.

Consequently,

the licensee

did not recognize

the potential for the untested

HSSVs to place

the steam generators

outside the design basis

(110 percent of design

pressure),

or to possibly exceed

the

TS setpoint tolerances.

On April 2,

1996, the pressure lift setpoints

on three of five HSSVs

on main

steam

Lead

1 were identified by testing to exceed their allowable

TS

tolerances,

a condition adverse

to quality.

Failure to promptly identify the

- possible out-of-tolerance conditions

on the remaining Unit

1

HSSVs resulted in

placing the plant in a condition outside of 'its design basis.

The

HSSVs

on

main steam

Lead

2 were not tested until April 11,

1996,

when three of five

MSSVs were found to be out-of-tolerance.

The HSSVs

on main steam

Leads

3 and

4 were not tested until April 14,

1996,

when six .of ten

HSSVs were found to be

out-of-tolerance.

The operability evaluation,

which modelled the out-of-tolerance

HSSVs

showed

that the maximum allowable

SG pressures

on

SG 1-2 and 1-3, would have

been

exceeded

by 8 and

27 psi respectively

under design basis conditions.

Based

on the above,

the inspector identified an apparent violation of

10 CFR Part 50, Appendix B, Criterion XVI, which requires,

in part, that

conditions

adverse

to quality such

as deficiencies

are promptly identified and

corrected

(Violation 275/96012-02).

NRC Inspection

Manual, Part 9900,

"Operable/ Operability:

Ensuring the

Functional Capability of a System or Component," states

that timeliness of

corrective actions is determined

by the safety significance of the issue.

Specifically,

"The Allowed Outage

Times contained

in TS generally provide

reasonable

guidelines for safety significance."

Diablo Canyon's

TS allowed

outage

time for the

HSSVs is 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The inspectors

determined that the

licensee's

corrective actions to identify and restore

HSSV setpoints within TS

allowed tolerance

were untimely.

4

IMPLEMENTATION OF

PROCEDURE

FOR EVALUATING DEGRADED CONDITIONS

The inspectors

reviewed licensee

Procedure

OM7.IDS, Revision 2, "Operability

Evaluation"

and the licensee's

implementation of the procedure

during the

April 1996 augmented

testing of the Unit

1 HSSVs.

The inspectors

identified

two examples of an apparent violation for the licensee's

failure to follow

Procedure

OM7. IDS.

10,CFR Part 50, Appendix B, Criterion V,, requires that

activities affecting

quality shall

be prescribed

by documented

procedures

and shall

be accomplished

in accordance

with "those procedures.

Diablo Canyon Procedure

OM7. IDS,

Revision 2, Subsection

2.2.3,

requires that:

"For Degraded

Conditions

impacting Structure,

System

and

Component operabi.lity identified by physical

evidence at

DCPP,

the

POA should

be completed

and documented

during the

operating shift in which the physical

evidence

was identified.

In all cases,

the

POA shall

be completed

and documented within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following

identification of a Degraded Condition."

On April 2,

1996, licensee test engineers

identified three of five HSSVs

on

steam

Lead

1 of Unit

1 to be out-of-tolerance

(high), but as of May 14,

1996,

NRC inspectors

identified that the licensee

had not documented

a

POA of the

degraded

condition

(namely three of five NSSVs out-of-tolerance

high).

This

is considered

as

an example of an apparent violation for the failure to meet

the requirements

of 10

CFR Pa} t 50, Appendix 8, Criterion

V and Procedure

OH7.IDS (Violation 275/96012-03).

Diablo Canyon

Procedure

OH7. IDS, Revision 2, Subsection

4. 1 requires that

"The

individual

and his/her group supervisor identifying a Degraded

Condition or an

Issue

Needing Validation is responsible for:

Immediately notifying the Shift

Foreman, if the condition is an observed

physical

Degraded

Condition at the

plant that could adversely affect the Operability of a Structure,

System,

and

Component."

On April 2,

1996, licensee test engineers

identified three of five HSSVs

on

steam

Lead

1 of Unit

1 to be out-of-tolerance

(high), but did not notify the

Shift Foreman.

This is considered

as another

example of an apparent violation

for the failure to follow the requirements of 10 CFR Part 50, Appendix B,

Criterion

V and Procedure

OH7. IDS (Violation 275/96012-03).

The first example of the violation may have contributed to the delay in

testing the other

NSSVs following the April 2 Lead

1

NSSV testing.

The second

example,

in effect,

excluded Operations

from the process of responding

to the

NSSV deficiencies identified on April 2.

5

WEAKNESSES IN HSSV AUGMENTED TESTING

PROGRAM

Interviews of licensee

personnel

who performed the initial augmented testing

revealed that they had considered

the test to be important for gathering data,

but did not consider that it would require the

same actions in response

to

test results

as would be required with periodic surveillance testing.

The

-12-

inspectors

noted that one of the apparent violations, failure to inform the

Operations

Unit Shift Foreman of the degraded

condition (three of five HSSVs

out-of-tolerance)

on April 2,

1996, resulted

in part,

because

the individuals

who performed the augmented testing

had not considered

the test to be governed

by the licensee's

formal procedures.

The inspectors

did note that shortly

following the April 2 augmented testing,

the individuals performing the

HSSV

testing were

made

aware of the necessity

to follow the licensee's

formal

processes

for reporting

and evaluating test results.

The inspectors

observed

that the Shift Foreman's

log following the April ll, 1996, testing did contain

documentation

pertaining to the

HSSV as-found out-of-tolerance setpoints.

The inspectors

observed that the licensee

had not developed

an action plan

and

had not- documented

any guidelines or procedures

to be used

once the data from

the augmented testing

was obtained.

Interviews with licensee

personnel

revealed that

some of the delays

in testing after April 2 occurred

because

they were unsure

about which other

HSSVs should

be tested

and

how the as-found

test results

should

be evaluated

(e.g., there

was uncertainty about what would

be done with the as-found test results for the

HSSVs for which AVK CFs

had not

yet been developed).

The inspectors

concluded that two weaknesses

in the licensee's

HSSV augmented

testing program contributed to the problems

encountered

during the

implementation of the testing.

The licensee did not sufficiently formalize

the

HSSV augmented testing

program prior to its implementation,

and the

licensee

did not sufficiently plan for the evaluation

process

and actions to

be taken following the

augmented testing.

ATTACHNENT 1

1

PERSONS

CONTACTED

1. 1

Licensee

Personnel

  • S. Allen, ES/EOP,

Engineering

Services

  • J. Alviso, Regulatory Services,

NRC Engineering Assistant

  • ¹D. Brosnan,

Acting Director, Regulatory Services

  • W. Coley, Engineer,

Regulatory Services

  • W. Crockett,

Manager,

Nuclear guality Services

  • W. Fujimoto, Vice President,

Operations

and Plant Manager

¹S.

Furnis-Lawrence,

Engineer,

Nuclear guality

¹T. Grebel, Director, Licensing

and Design Basis

  • ¹C. Groff, Director, Engineering

Services

  • ¹C. Harbor, Regulatory Services,

NRC Interface

  • C. Joyce,

Engineer,

Nuclear Performance

Monitoring

  • D. Hiklush,

Manager,

Engineering Services

  • D. Taggart, Director, Nuclear Performance

Honitoring/NSE

  • B. Waltos, Director, Engineering

Services

1.2

NRC Personnel

  • S. Boynton, Resident

Inspector

  • ¹D. Corporandy,

Reactor

Engineer

  • ¹P. Goldberg,

Reactor

Inspector

.¹H. Tschiltz, Senior Resident

Inspector

¹H.

Wong, Chief, Reactor Project

Branch

E

  • Denotes those attending

the initial exit meeting

on Hay 17,

1996.

¹Denotes

those attending the telephone exit meeting

on Hay 28,

1996.

In addition to the personnel

listed above,

the inspectors

contacted

other

personnel

during this inspection.

2

EXIT MEETING

A preliminary exit meeting

was conducted

on Hay 17,

1996,

and

a final exit

meeting

was conducted

on Hay 28,

1996.

During these

meetings,

the inspectors

reviewed the scope

and findings of the report.

The licensee

acknowledged

the

inspection findings documented

in this report.

The licensee

did not i,dentify

as proprietary

any information provided to, or reviewed

by, the inspectors.

ATTACHNENT 2

AFM

CF

DCPP

HSSV

POA

SG

TS

ACRONYHS

auxiliary feedwater

correlation factor

Diablo Canyon

Power Plant

main steam safety valve

prompt operability assessment

steam generator

Technical Specifications