Forwards Insp Repts 50-275/96-01 & 50-323/96-01 on 960108- 12.Violations Noted
ML16342D262
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/11/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D263 List:
References
EA-96-123, NUDOCS 9604190009
Download: ML16342D262 (12)


See also: IR 05000275/1996001

Text

~p,q Agcy~~o

+

Op

I

+*l+K

EA 96-123

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

APR

l

I

lS96

Pacific Gas

and Electric Company

Nuclear Power Generations

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street.

Room 1451

P.O.

Box 770000

San Francisco.

California 94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/96-01;

50-323/96-01

This refers to the inspection

conducted

by Mr.

D.

W. Schaefer of this office

on January

8-12,

1996, at the Diablo Canyon Nuclear

Power Plant,

Units

1 and

2. facility.

The purpose of the inspection

was to determine

whether

activities authorized

by the license were conducted safely and in accordance

with NRC requirements.

At the conclusion of the onsite inspection.

the

findings were discussed

with those

members of your staff identified in the

enclosed

report.

A followup telephone

discussion

was also conducted

between

Messrs.

W.

Ryan

and

D. Sisk of your staff and Mr. Schaefer

on January

16

'996.

to clarify certain inspection findings.

This inspection also involved

an in-office review of your audit report of the Westinghouse

access

authorization

program,

dated February

29.

1996.

Your staff provided

a copy of

this audit report on March 21.

1996.

and our review of this report was

completed

on March 29 '996.

A followup telephone exit meeting

was held on

April 5.

1996,

between

Messrs.

B. Murray and

D. Schaefer of this office and

those

members of your staff identified in the enclosed

report. to inform you

of our disposition of the inspection results.

The purpose of this inspection

was to review Licensee

Event Report 95-S02-00.

dated

November

9

~

1995.

Areas

examined during the inspection are identified

in the report.

Within these areas'he

inspection consisted of selective

examinations of procedures

and representative

records'nterviews

with

personnel'nd

observation of activities in progress.

Based

on the results of this inspection,

one apparent violation was identified

and is being considered

for escalated

enforcement

action in accordance

with

the "General

Statement of Policy and Procedure for NRC Enforcement Actions"

(Enforcement Policy),

NUREG-1600.

This apparent violation involved your

failure to review and evaluate all pertinent

background information developed

during an access

authorization investigation before granting

an individual

unescorted

access.

Consequently,

an individual who should not have

been

granted

access

obtained

unescorted

access

authorization to Diablo Canyon

contrary to the requi rements of 10 CFR 73.56

and your Security Plan.

Additionally. this apparent violation led to the identification of weaknesses

in your access

authorization

program.

and in the Westinghouse

Electric

Corporation.

9604i90009 9604ii

PDR

ADQCK 05000275

6

PDR

Pacific Gas

and Electric Company

-2-

The ci rcumstances

surrounding this apparent violation, the significance of the

issues,

and the need for effective long-term corrective actions

were discussed

with members of your staff during the inspection

and at the inspection exit

meeting

on January

12,

1996.

As

a result, it may not be necessary

to conduct

a predecisional

enforcement

conference

in order to enable the

NRC to make

an

enforcement decision.

However.

a Notice of Violation is not presently being

issued for these

inspection findings.

Before the

NRC makes its enforcement

decision.

we are providing you an opportunity to either

(1) respond to the

apparent violation addressed

in this inspection report within 30 days of the

date of this letter. or (2) request

a predecisional

enforcement

conference

within 7 days of the date of this letter

.

Your response

should

be clearly marked

as

a

"Response to an Apparent Violation

in Inspection

Report, 50-275/96-01,

50-323/96-01"

and should include:

(1) the

reason for the apparent violation. or, if contested'he

basis for disputing

the apparent violation, (2) the corrective steps that have

been taken

and the

results

achieved,

(3) the corrective steps that will be taken to avoid further

violations.

and (4) the date

when full compliance will be achieved.

Your

response

should

be submitted

under oath or affirmation and

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

If an adequate

response

is not received

within the time specified or an extension of time has not been granted

by the

NRC. the

NRC will proceed with its enforcement

decision or schedule

a

predecisional

enforcement

conference.

If you choose

not to provide

a response

and would prefer participating in a

predecisional

enforcement

conference.

please

contact

Mr. Blaine Murray at

telephone

(817) 860-8126

as

soon

as possible.

In addition.

please

be advised that the number

and characterization

of

apparent violations described in the enclosed

inspection report

may change

as

a result of further

NRC review.

You will be advised

by separate

correspondence

of the results of our deliberations

on this matter.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of

this letter. its enclosures,

and your response (if you

will be placed in the

NRC Public Document

Room (PDR).

your response

should not include any personal

privacy,

safeguards

information so that it can

be placed in the

Practice."

a copy of

choose to provide one)

To the extend possible,

proprietary.

or

PDR without redaction.

The responses

to the apparent violation described

in the enclosed

inspection

report are not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980.

Pub.

L.

No. 96.511.

0

Pacific Gas

and Electric Company

-3-

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely.

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

NRC Inspection

Report

50-275/96-01;

50-323/96-01

w/attachment

cc w/enclosure:

Sierra

Club California

ATTN:

Dr. Richard Ferguson

Energy Chair

1100 11th Street,

Suite 311

Sacramento,

Cali fornia

95814

San Luis Obispo

Mothers f'r Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box 164

Pismo Beach. California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo. California

93406

as

P

fin

rector

visi on

Rev'or

Sa fety

Pacific Gas

and Electric Company

-4-

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman BurnshMr. Robert Kinosian

505 Van Ness'm.

4102

San Francisco,

Cali fornia

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street.

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H.

Kaufman

Deputy Attorney General

110 West

A Street.

Suite 700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher

J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Pacific Gas

and Electric Company

Diablo Canyon

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

0

Pacific Gas

and Electric Company

-5-

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

'bcc to

DMB (IE04)

bcc distrib. by RIV:

L. J. Callan

G.

F. Sanborn,

EO

W. L. Brown,

RC

OE:EA File,

HS: 7-H-5

Diablo Canyon Resident

Inspector

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

Branch Chief (DRP/TSS)

H.

Hammond

(PAO.

WCFO)

DRS-PSB Security File (Goines)

RIV File

RIV Security File

N. Ervin (NRR/DRPH/SGB.

MS: 9D24)

Elaine

Koup (NRR/DRPH/SGB.

HS:

9D24)

HIS S stem

I

DRS AI 96-G-0042

DOCUMENT NAME:

G:REPORTSNDC601RP.DWS

SS:

PSB

E

C:PSB

E

EO

E

D:DRS

N

PBE:DRP

E

To receive copy of document, indicate in box: "C" = Copy without enctosures

"E"-"Copy with enctosures "N" = No copy

g p~

DWSchaefer:cg*

BHMurray*

04/

/96

04

/96

GFSanborn*

04/

/96

TPGwynn*

04/

/96

HWong

viP V

04/a /96

n

D:DRS

TPGw nn

04/

/96 i

'80020

Pacific Gas

and Electric Company

-5-

E-Mail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB ( IE04)

bcc distrib. by RIV:

L. J. Callan

G.

F. Sanborn,

EO

W. L. Brown.

RC

OE:EA File,

HS: 7-H-5

Diablo Canyon Resident

Inspector

Senior

Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Branch Chief (DRP/TSS)

M.

Hammond

(PAO,

WCFO)

DRS-PSB Security File (Goines)

RIV File

RIV Security File

N. Ervin (NRR/DRPM/SGB.

HS:

9D24)

Elaine Koup (NRR/DRPH/SGB,

HS:

9D24)

MIS System

DRS AI 96-G-0042

DOCUMENT NAME:

G:REPORTStDC601RP.DWS

SS:

PSB

E

C:PSB

E

EO

E

D:DRS

N

PBE:DRP

E

To receive copy of document, indicate In box: "C" = Copy without enclosures

"E" = Copy with enctosures "N" = No copy

~c~ot

04

/96

04/

/96

DWSchaefer: cg*

BMMurray*

04/

/96

04/

/96

GFSanborn*

TPGwynn*

HWong vip 6

04/ ll /96

D:DRS

TPGw nn

04/

/96