Informs of Upcoming Insps 50-275/95-98 & 50-323/95-98 to Review & Assess Safety Performance Experience of Terry Turbines in AFW or Rcicss.Also Forwards Insp Schedule & Performance Info to Be Made Available for Review
ML16342D001
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/28/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9508070117
Download: ML16342D001 (18)


See also: IR 05000275/1995098

Text

REGULATORYI~&fÃ$$1NESQ EDtXMftIIMTION SYSTEM

( RIDS )

ACCESSION NBR:9508070117

DOC.DATE: 95/07/28

NOTARIZED: NO

DOCKET I

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

TH.NAME

AUTHOR AFFILIATION

NN,T.P.

Region

4 (Post

820201)

RECIPE

NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Informs of upcoming insps

50-275/95-98

& 50-323/95-98

to

review

& assess

safety performance

experience

of Terry

turbines in AFW or RCICSs.Also forwards insp schedule

&

performance info to be

made available for review.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

EXTERNAL: LITCO BRYCEiJ

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

MILLERiM

AEOD/DEIB

AE~O/~C

FILE CENTE

RR/DORS/OEAB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

'1

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 'O'ASTE! CONTACTTHE DOCL'NIENTCONTROL

DESK, ROOlXI PI -37 (EXT. 504-20S3

) TO ELINilYATE YOUR NAME FROif

DIS"I'RlDl"I'IONLISTS FOR DOCI.'NIEYTSYOL'ON"I . PEED!

i

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

~

'

1 +8 REG(1~

~p

\\

np

IA

g

p

Cy

r+

~O

+**+~

UNIT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 6064

JUL 2 8 895

Pacific Gas

and Electric'ompany

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco,

Cali fornia

94177

SUBJECT:

REGION IV INITIATIVE INSPECTION -

NRC INSPECTION

REPORT 50-275/95-98:

50-323/95-98

The purpose of this letter is to announce

a Region

IV inspection at your

facility.

The inspection will consist of a site visit and in-office review of

information.

This inspection effort is intended to be completed at each site

by one inspector in about

2 days.

The schedule for the inspection is

contained in Attachment

1 to this letter.

We realize that Diablo Canyon Nuclear

Power Plant has

been recognized

as

a

superior performer with a reduced inspection plan as outlined in a letter

dated

May 8,

1995.

However,

due to the potential safety significance of

problems experienced

with the Terry turbines,

the need exists to perform this

inspection.

The purpose of this inspection is to review and assess

the safety

performance

experience of Terry turbines in auxiliary feedwater

or reactor

core isolation cooling'ystems,

as applicable.

While on site, this inspection

will emphasize

the gathering of site performance

data to support

an in-office

assessment.

The inspection will be conducted

using portions of Inspection

Procedure

93801 "Safety System Functional

Inspection."

Some facilities may

not receive

a site visit based

on recent inspection

and understanding

of

system configuration.

To assist in achieving the objectives of the inspection,

we request that you

make available for review the performance

information contained in

Attachment 2.

My staff will be contacting your staff by telephone to discuss

the information and the site visit schedule.

Should you have

any additional questions

concerning this inspection

or the

requested

information, please

contact

Mr. E. Collins at (817) 860-8291.

Sincerely,

homas

P.

Gwynn

D rec o

Division of Rea

r Sa

e y

9508070ii7 950728

PDR

ADOCV OSOOOV75

8

PDR

~

'

'

Pacific Gas

and Electric Company

-2-

Dockets:

50-275

50-323

Licenses:.

DPR-80

DPR-82

Attachments:

As stated

CC:

Sierra Club .California

ATTN:

Dr. Richard Ferguson

Energy Chair

1100 lith Street,

Suite 311

Sacramento.

Ca 1-i forni a

95814

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box 164

Pismo Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

. Pismo Beach., California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman BurnsNMr. Robert Kinosian

505 Van Ness,

Rm.

4102

San Francisco,

Cali fornia

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington.

Esq.

Legal Counsel

857 Cass Street.

Suite

D

Monterey, California

93940

~

'

Pacific Gas

and Electric Company

-3-

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West A Street,

Suite 700

San Diego. Cali fornia

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box

7442'an

Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto. Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

~

'

Pacific Gas

and 'Electric Company

4

E-Mail report to D. Sullivan (DJS)

E-Mai.l report to NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib. by RIV:

L. J. Callan

Resident

Inspector

DRSS-F IPB

MIS System

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

To receive copy of document, Indicate In box: "C"

Copy without enclosures

"E"

Copy with enclosures "N" ~ No copy

RIV:AC:EB

EECollins/lb

07/ag/95

D:DRS

TPGwynn

07

/95

D:DRP

JEDy

07

/95

AL

D:DRS

TPGw nn

07

/95

~

'

-4-

E-Mail report to D. Sullivan (DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

,bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB.

MS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

i

DOCUMENT NAME:

To receive copy of document, indicate In box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

RIV:AC:EB

EECollins/lb

07/s8/95

D:DRS

TPGwynn

07

/95

D:DRP

JEDy

07

/95

AL

D:DRS

TPGw nn

07

/95

t'4 jjQ'(3

ggo I

l((

~

'

ATTACHHENT 1

SITE VISIT SCHEDULE

Ins ector

1

August 3-4.

1995

August 7-9

~

1995

August 10-11.

1995

August 15-17.

1995

Palo Verde Nuclear Generating Station

San Onofre Nuclear Generating Station

Diablo Canyon

Wolf Creek

2

2

August 4,

1995

August 8,

1995

August 10-11.

1995

August

14.

1995

August 16-17,

1995

Comanche

Peak

South

Texas Project

Waterford

Arkansas

Nuclear

One

Cooper Nuclear Station

River Bend Station and Washington Nuclear Project

2 will be reviewed by telephone

with the option of performing

a site visit.

ATTACHMENT 2

AREAS OF INTEREST OF TERRY TURBINE PERFORMANCE

FOR INSPECTION

~Cate or

Design

and

Configuration

Lubrication

Governor

Procedures

Area of Interest

Designer of the system

and major design objectives

Automatic initiation signals

Initiation sequence

Design of the overspeed trip ball-tappet

Configuration of the system

Major modifications of the system

Steam admission

valves

Location of the steam admission valves

Leak tightness of the steam admission

valves

Condensate

removal capabilities

Supplier of replacement

parts

Specifications for replacement

parts

Recently purchased

parts

Storage of spare governors

and actuators

Environment in area of turbines

Type of lubricating oil system

Type of oils

Specifications for oi-ls

Operating limits based

on oils

Periodicity for changing oils

Type of governor installed

Type of governor control oil system

Periodicity of refurbishment of governor

Type of remote operation, if applicable

Governor valve stem material

Installation date of governor valve stem

Speed stability verification

DC electrical

system

Overspeed trip mechanisms

Speed

ramp provisions

Terry turbine manual

approved for use

Woodward governor

manual

approved for use

EPRI NP-6909 availability

Verification of governor valve coordination

Replacement

interval for governor

diaphragm

Disassembly/reassembly

of turbine,

governor valve,

etc.

Trip ball-tappet inspections

System operating

procedures

Test procedures

Test frequency

~

'

-2-

Operating

Experience

Generic

Communications

Documents

Required:

Start

demands

Failures

Causes of failures

Generic communication sources

Responses

to generic communications

Terry turbine users

group participation

Copy of system operating

procedure

Copy of system operability test procedure

Copy of governor valve assembly instructions

Copy of applicable

process

and instrumentation

diagrams

Copies of the reviews of:

Information Notices 94-66.

93-51,

86-14 and supplements;

NUREG 1275,

Volume

X