Forwards Insp Repts 50-275/95-04 & 50-323/95-04 & Notice of Deviation
ML16342C959
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/21/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C960 List:
References
NUDOCS 9506280629
Download: ML16342C959 (14)


See also: IR 05000275/1995004

Text

PRIDRI'TY Z

I

MIBRflM

~

~

ACCESSION NBR:9506280629

DOC.DATE: 95/06/21

NOTARIZED: NO

DOCKET g

ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323.

AUTH.NAME

AUTHOR AFFILIATION

GWYNNPT.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts

50-275/95-04

& 50-323/95-04

& notice of

violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTRj ENCL

I

SIZE:

(P + l I

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

P

R,

0

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

ERNAL: LITCO BRYCE,J

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

MILLERISM

AEOD/DEIB

~EG~

NRR/DORS/OEAB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

D

C

'

N

4

VOTE TO ALL"RIDS" RECIPIENTS:,

PLEASE HELP US TO REDUCE WASTE! COYTACTTHE DOCL'MEYTCOYTROL

DESK. ROOM Pl-37 (EXT. 504-20S3

) TO ELIMIYATEYOUR iNANIE FRO!i!

~

~

DISTRIBI.'TIOYLISTS FOR DOCUKIEYTS YOU DOi "I'EED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

0

1P,P AE00

<<>>*e>>

UN IT E 0 STATES

NUC LEAR R EG ULATOR Y COMMISS ION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

.VV 2

I t995

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-04'0-323/95-04

AND NOTICE OF

DEVIATION

This refers to the inspection

conducted

by Messrs.

Joseph

Tapia

and

Stephen

McCrory of this office on May 22-25,

1995.

The inspection

included

a

review of activities authorized for your Diablo Canyon Nuclear

Power Plant,

Units

1 and 2, facility.

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

report.

Subsequent

telephone

discussions

regarding the inspection

were held

on June 8,

1995.

Appropriate licenses

have

been

issued to the two applicants,

who successfully

completed'their

examinations.

Areas

examined during the inspection

included evaluation of two candidates

for

operator

and senior operator licenses,

review of ongoing licensed operator

requalification testing,

and assessment

of the capability to detect

and

respond to steam generator

tube leaks

and tube ruptures.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain of your activities appeared

to deviate

from your commitments

in the Final Safety Analysis Report

(FSAR),

as specified in the enclosed

Notice of Deviation (Notice).

We are concerned

about the deviation because it resulted

in the potential for inappropriate

command

and control

and communications

among control

room crews.

Filling the

position of Senior Control Operator with a licensed operator,

as

opposed to

your

FSAR submittal describing this position being filled by a senior operator

may place the licensed

operator in a position where

he could direct licensed

activities of other licensed operators,

contrary to his

and your license.

You are required to respond to this letter within 90 days

and should follow

the instructions specified in the enclosed

Notice when preparing your

response.

In your response,

you should

document the specific actions

taken

and

any additional

actions

you plan to prevent recurrence,

such

as were

950b280b29

950b2i

PDR

ADQCK 05000275

6

PDR

0

Pacific

Gas

and Electric Company

discussed

in a June

8,

1995, telecon with members of your staff.

Your

response

may reference

or include previous docketed

correspondence, if the

correspondence

adequately

addresses

the required response.

After reviewing

your response

to this Notice, including your proposed corrective actions

and

the results of future inspections,

the

NRC will determine

whether further

NRC

enforcement

action is necessary

to ensure

compliance with NRC regul-tory

requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosure(s),

and your response will be placed in the

NRC

Public Document

Room (PDR).

To the extent possible,

your response

should not

include any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed in the

PDR without redaction.

However, if you find it

necessary

to include such information, you should clearly indicate the

specific information that you desire

not to be placed in the

PDR,

and provide

the legal basis to support your request for withholding the information from

the public.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Thomas

P.

Gwynn,

Di

ctpr )

Division of Reac

Sa~

Enclosures:

1.

Notice of Deviation

2.

NRC Inspection

Report

50-275/95-04;

50-323/95-04

w/attachments

cc w/enclosures:

(see

next page)

0

Pacific

Gas

and Electric Company

-3-

cc w/enclosures:

Sierra Club California

ATTN:

Dr. Richard Ferguson

Energy Chair

6715

Rocky Canyon

Creston, California

93432

San Luis Obispo

Mothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns~Mr. Robert Kinosian

505 Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Honterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Hr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

0

Pacific

Gas

and Electric Company

State of California

ATTN:

Nr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific

Gas

and Electric Company

ATTN:

Jim Welsch

Operations

Training Supervisor

P. 0.

Box 56

Avila Beach,

CA

93424

0

~

~

Pacific Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB, HS:

Allegations Coordinator

(2)

G.

F. Sanborn,

EO

DRS AI file copy 95-070

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

Stuart Richards,

(NRR)

DOCUMENT NAME

R:tt DC:DC504RP/JIT

To receive copy of document, Cndtcate in box: "C"

Copy without enclosures

"E" ~ Copy with enciosures "N" ~ No copy

Previousl

concurred*

RIV:08

E

RIV:OB

E

Chief:OB

N

D:DRS

N

D:DRP

1a

c ror

e

e

w nn

eac

06/

/95

OFFICIAL RECORD

COPY

0

Pacific

Gas

and Electric Company

E-Hail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV Fi1 e

Leah Tremper

(OC/LFDCB, HS:

Allegations Coordinator

(2)

G.

F. Sanborn,

EO

DRS AI file copy 95-070

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9EIO)

B. Henderson

(PAO,

WCFO)

Stuart Richards,

(NRR)

DOCUMENT NAME:

R:tt DC:DC504RP/JIT

To receive copy cf document, indicate in bcxt "C i Copy without enclosures

"E" ~ Copy with enctosures "N" a No copy

Previousl

concurred*

RIV:OB

E

RIVOB

E

Chief:OB

N

D:DRS

D:DRP

la

c ror

e

e

w nn

eac

06/

/95

OFFICIAL RECORD

COPY

0