Notice of Deviation from Insp on 950522-25.Deviation Noted: Plant Senior Control Operator Position Being Filled by Individual Holding NRC OL Instead of Described Senior OL
ML16342C962
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/21/1995
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342C960 List:
References
50-275-95-04, 50-275-95-4, 50-323-95-04, 50-323-95-4, NUDOCS 9506280638
Download: ML16342C962 (2)


Text

ENCLOSURE 1

NOTICE OF DEVIATION Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant Dockets:

50-275 50-323 Licenses:

DPR-80 DPR-82 During an NRC inspection conducted on Hay 22-25,

1995, one deviation from your Final Safety Analysis Report was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Action," 10 CFR Part 2, Appendix C, the deviation is listed below Final Safety Analysis Report Section

13. 1.2.3, "Shift Crew Composition,"

and Figure

13. 1-3, describe the Senior Control Operator position as requiring an NRC senior operator license.

Contrary to the above, on Hay 23 and 24,

1995, the Unit 2 Senior Control Operator position was being filled by an individual holding an NRC operator license instead of the described senior operator license (275;323/9504-01).

Please provide to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control

Desk, Washington, D.C. 20555, with a copy to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas
76011, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, in writing within 90 days of the date of this Notice, (1) the reason for the deviation, or if contested, the basis for disputing the deviation, (2) the corrective steps that have been taken and the results
achieved, (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when your corrective action will be completed.

Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this 21st day of June, 1995 9506280638 95062i PDR ADQCK 05000275 6