Text
P RIORIT'Y Z
REGULATORY(@5995RMQg ECf~gIITJSOTION SYSTEM
( RZDS )
~ (
ACCESSION NBR:9506280565
DOC.DATE: 95/06/21
NOTARIZED: NO
DOCKET
CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
BEACH,A.B.
Region
4 (Post
820201)
RECZP.NAME
RECIPIENT AFFILIATION
RUEGERPG.M.
Pacific Gas
a Electric Co.
SUBJECT:
Forwards
insp repts
50-275/95-08
6 50-323/95-08
& notice of
violation.
DISTRIBUTION CODE: IEOID
COPIES RECEIVED:LTRf ENCLj SIZE:
+2 0
TITLE: General
(50 Dkt)-Znsp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRCH/HHFB
OE DIR
RGN4
FILE
01
ERNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
MILLERISM
AEOD/DEZB
AEOD~
FIL
CENTER>
OTE,+OEAB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
VOTE TO ALL"RIDS" RECIPIEi~S:.
PLEASE HELP US TO REDUCE WASTE! COib'TACTTHE DOCL'MEYTCOYTROL
DESK, ROOM PI.37 (EXT. 504-2033
) TO ELIMIYATEYOUR iNAiiIEFROiI
~
~
DISTRIBI."I'IOY.LISTS FOR DOCUKIEYTS YOU DOi "I'.'PEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
C
C
0
$ ~
gpss RECT
(4
IWp0
'>J
Wy*y4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
JUN
2
I (995
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory H. Rueger,
Senior Vice
President
and General
Hanager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
PION
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION
REPORT 50-275/95-08;
50-323/95-08
AND NOTICE OF
VIOLATION
This refers to the inspection
conducted
by H. Tschiltz and
G. Johnston of this
office on April
2 through
Hay 13,
1995.
The inspection
included
a review of
activities authorized
for your Diablo Canyon Nuclear
Power Plant,
Units
1
and
2, facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
~
~
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation.
The violation is of concern
because it involved maintenance
that
affected the performance of the emergency
diesel
generators
(EDGs).
The
preplanning
and work controls utilized for the repair of pyrocrete failed to
properly consider the potential effect of scaffolding
and tenting
on
radiator cooling air flow.
The initial engineering
evaluations
of the
significance of the air flow reduction
based
upon engineering
judgment were
incorrect.
After the significance of the air flow reduction
was recognized,
a
detailed analysis
was required to determine
the past operability of Unit
1
EDGs.
Following identification of the problem during the work on Unit 1, the
corrective actions
taken failed to prevent
a similar problem with blockage of
EDG 2-2 radiator air flow during pyrocrete repairs
performed
on Unit 2.
One noncited violation was also identified.
The violation involved the
failure to perform required testing of containment
emergency airlock door
seals.
This violation is not being cited because
the criteria in
paragraph
VII.B.2 of Appendix
C to
10 CFR Part 2 of the
NRC's "Rules of
Practice"
were satisfied.
Additionally, this report documents
a number of instances
where your staff had
not displayed
a questioning attitude or had not adequately
followed through to
'orrect identified deficiencies.
These
examples
represent
a departure
from
950b2805b5
950b2i
ADQCK 05000275
8
g(~g/
r/)
0
the very strong
performance that
we have recognized
previously.
I encourage
you
and your staff to assess
these
examples for common 'cause.
You are required to respond
to this letter
and should follow the instructions
specified
in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence
of the
EDG violation.
Your response
may reference
or include previous docketed
correspondence, if the
correspondence
adequately
addresses
the required response.
After reviewing
your response
to this Notice, including your proposed corrective actions
and
the results of future inspections,
the
NRC will determine
whether further
NRC
enforcement
action is necessary
to ensure
compliance with NRC regulatory
requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
However, if you find it
necessary
to include such information, you should clearly indicate the
specific information that you desire
not to be placed in the
PDR and provide
the legal basis to support your request for withholding the information from
the public.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
. Bill Beach,
Director
Division of Reactor Projects
Dockets:
50-275
50-323
Licenses:
DPR-82
Enclosures:
I.
2.
NRC Inspection
Report
50-275/95-08;
50-323/95-08
0
Pacific
Gas
and Electric Company
cc w/enclosures:
Sierra
Club California
ATTN:
Dr. Richard
Ferguson
Energy Chair
6715
Rocky Canyon
Creston,
93432
San Luis Obispo
Mothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Hs. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
~
~
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505
Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857 Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Hr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
Pacific
Gas
and Electric Company
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific
Gas
and Electric Company
ATTN:
Christopher J.
Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power Plant
ATTN:
Warren
H. Fujimoto, Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific
Gas
and Electric Company
JUN 2
I t995
E-Mail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
Sr Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g DC'IIDC508rp.MDT
To receive copy of document, Indicate In born "C" a Copy without enclosures
"E" a Copy with
nclosures "ff" ~ No copy
RIV:SRI:DRP
E
C:DRP(E
C:WCFO
D:D
DTschiltz
DDCham
rlain
KEPerki
/
/95
6/
/9
6/
/95
OFFICIAL RECORD
COPY
6/Zl /95
i
~
JUN 2
I 1995
E-Mail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
@cc to.DRB (IEDI) ...W
iIr'dt Bis'friit: by,RIv'..
L. J.
Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9EIO)
Resident
Inspector
MIS System
Sr Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g DC)DC508rp.MDT
To receive copy of document, indicete in born
C
~ Copy without enclosures
E
~ Copy with
nclosures
N
a No copy
RIV:SRI:DRP
E
C:DRPiE
C:WCFO
D:D
DTschiltz
DDCham
rlain
KEPerki
6/
/95
6/
/95
OFFICIAL RECORD
COPY
6/Zl /95