Forwards Insp Repts 50-275/95-03 & 50-323/95-03 on 950327-31.No Violations Noted
ML16342C917
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/01/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342C918 List:
References
NUDOCS 9505050057
Download: ML16342C917 (10)


See also: IR 05000275/1995003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

AR LING TON, T E XAS 76011 8064

MAY "l t995

Pacific Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior Vice

President

and General

Manager

Nuclear

Power Generation .Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION

REPORT 50-275/95-03;

50-323/95-03

This refers to the inspection

conducted

by Mr. C. Clark of this office and

Mr. A. Singh of the Office of Nuclear Reactor Regulation

on March 27-31,

1995.

The inspection

included

a review of activities authorized for your Diablo

Canyon Nuclear

Power Plant,

Units

1 and 2, facility.

At the conclusion of the

inspection,

the findings were discussed

with Mr.

W. Fujimoto and those

members

of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The results of this inspection

are documented

on

page

1, in the enclosed

report.

A violation discussed

in paragraph

2.3 of the enclosed

report is not being

cited because

the criteria in paragraph VII.B.1 of Appendix

C to

10 CFR Part 2

of the NRC's "Rules of Practice,"

were satisfied.

This violation appears

to

be

an isolated

occurrence

and the licensee staff implemented

prompt and

effective actions to address

the problem.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Thomas

P.

Gwygn,

ct

Division of Y ac or Sa

ty

9505050057 95050i

PDR

ADGCK 05000275

6

PDR,

Pacific

Gas

and Electric Company

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

NRC Inspection

Report

50-275/95-03;

50-323/95-03

w/Attachments

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

Energy Chair

6715

Rocky Canyon

Creston,

California

93432

San Luis Obispo

Hothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Hs. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Hanaging Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Hr. Truman Burns)Hr. Robert Kinosian

505

Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington,

Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Honterey, California

93940

0

Pacific Gas

and Electric Company

I

Radiologic Health Branch

State

Department of Health Services

ATTN:

Nr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Hr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific

Gas

and Electric Company

ATTN:

Christopher J.

Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distri b.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB,

MS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

i

DOCUMENT NAME:

To receive copy of document, Indicate inbcxt "C" ea Copy without enclosures

"E" >

y with enciosures "N" ~ No copy

WCFO:PSB

E

CClark

Q@

4/27/95

D:DRS

TP

nn

NRR

E

ASingh

Dr,

04/27/95

C:PSB

6

D:DRS

tJ

WAng (Pate

~~

TPGwynn

for An

04/27/95

04/

/95

D:DRP

B each~

0

/95

/

/95

04/

/95

04/

/95

04/

/95

OFFICIAL RECORD

COPY

04/

/95

Pacific

Gas

and Electric Company

E-Mail report to 0. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IEOl)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper

(OC/LFDCB, HS:

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

I

DOCUMENT NAME:

To receive copy of document, indicate in box:

C

~ Copy without enciosures

E

a

y with enclosures "N" aa No copy

WCFO: PSB

E

NRR

E

C:PSB

6

0:DRS

tJ

0:DRP

CC1ark

Q~

Asingh

Qr,

WAng (Pate

~~

TPGwynn

for An

B each@@

4/27/95

D:DRS

TP

nn

04/27/95

04/27/95

04/

/95

0

/95

/

/95

04/

/95

04/

/95

04/

/95

OFFICIAL RECORD

COPY

04/

/95

0