ML16342C849
| ML16342C849 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/02/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342C850 | List: |
| References | |
| GL-89-10, NUDOCS 9503070078 | |
| Download: ML16342C849 (10) | |
See also: IR 05000275/1995001
Text
~P,R RE00(
~+,
p %~
I
Ch
C
0
~ .
'7 +y*y4
UNIT E D STATE6
NUCLEAR REGULATORY COMMISSION
REGION
IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
eR -a t995
Pacific Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
H. Rueger,
Senior
Vice
President
and General
Hanager
Nuclear
Power Generation
Bus. Unit
77 Beale Street.
Room 1451
P.O.
Box 770000
San Francisco.
Cali fornia
94177
SUBJECT:
NRC INSPECTION REPORT 50-275/95-01;
50-323/95-01
This refers to the inspection
conducted
by Hessrs.
C. Hyers and
H. Runyan of
this office on January
13-17
and 23-27
~ 1995.
The inspection
included
a
review of activities authorized for your Diablo Canyon Nuclear
Power Plant,
Units
1 and 2. f'acility.
At the conclusion of the inspection,
the findings
were discussed
with Hr. L. Womack and those
members of your staff identified
in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas.
the inspection consisted of selective examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection are documented
on
page
1, in the enclosed
report.
With some exceptions,
the inspection verified completion of your test program
to demonstrate
the design basis capability of your motor-operated
valves,
as
committed to in your response
"Safety-Related
Hotor-
Operated
Valve Testing
and Surveillance."
While the inspection generally
concluded that you had adequately
completed your initial motor-operated
valve
test activities, our verification of your efforts to complete Generic Letter 89-10 is contingent
upon you providing, for NRC review, additional
information and justification for the design basis capability for untested
valves, periodic verification, margin for valve factor degradation,
and the
status of outstanding quality assurance
findings.
Your written response to
the items identified in Attachment
2 is requested within 60 days of your
receipt of this letter
.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
9503070078
950302
ADDCK 05000275
8
Pacific Gas
and Electric Company
Should you have any questions
concerning this inspection.
we will be pleased
to discuss
them with you.
Sincerel
Dockets:
50-275
50-323
Licenses:
DPR-82
Enclosure:
NRC Inspection Report
50-275/95-01;
50-323/95-01
w/attachments
cc w/enclosure:
ATTN:
Dr. Richard Ferguson
Energy Chair
6715 Rocky Canyon
Creston, California
93432
San Luis Obispo
Mothers for Peace
ATTN:
Ms.
Nancy Culver
P.O.
Box 164
Pismo Beach, California
93448
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo Beach. California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
Thomas
P.
Gwynn, 't r
Division of Reactor Safe
Pacific Gas
and Electric Company
-3-
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San.Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman BurnsNMr. Robert Kinosian
505 Van Ness.
Rm.
4102
San Francisco.
Cali fornia
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington,
Esq.
Legal
Counsel
857 Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department
of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H.
Kaufman
Deputy Attorney General
110 West A Street,
Suite 700
San Diego. Cali fornia
92101
Pacific Gas
and Electric Company
ATTN:
Christopher J.
Warner.
Esq.
P.O,
Box 7442
San Francisco,
94120
Diablo Canyon Nuclear
Power
Plant
ATTN:
Warren
H. Fujimoto. Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
0
Pacific Gas
and Electric Company
f
i
E-Mail report to D. Sullivan (DJS)
bcc to
DMB ( IE01)
bcc distrib. by RIV:
L. J. Callan
DRSS- F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
HS:
RI
A
RIII DRS
C. Casto.
RII
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E.
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RII DRS
E. Kelly, RI
J.
Jacobson,
RIII
DOCUMENT NAME:
R:N DCNDC501r p.CJM
To receNe copy of document, Indicate in box: "C"
Co
ithout enclosures
"E" ~
p
~
~
th enclosures "N'
copy
RIY:EB: RI
RI: EB
C:EB
NRR/DE/EME 'RR/D
EH
NRR/DISP
CJMyers
HFRunyan
TFWest
rman
TScarbro
TChan
Rwess
02/
~ /95
02/'5
D:DRS
g
D:
02/j C/95
D:DRS
02/g//95
02/
/9
02/
5
TPGw nn
0 /
/95
ABBe
0 /7 /95
TPGw nn
/
95
0
-4-
E-Mail report to 0. Sullivan (DJS)
bcc to
DHB ( IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E.
WCFO)
RIV File
Leah Tremper
(OC/LFDCB,
HS:
RI
RIII ORS
C. Casto,
RII
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RII DRS
E. Kelly, RI
J.
Jacobson,
RIII
DOCUHENT NAME:
R:K DCNDC501rp.CJH
To receive copy of document, Indicate In box: "C" ~ Co
ithout enclosures
"E"
p
th enclosures "N'
copy
RIV:EB: RI
RI: EB
C:EB
NRRIOE/EME 'RR/D
NRR/DISP
CJMyers
02/
< /95
MFRun an
02/ '5
TFWest
rman
02/ N95
TScarbro
02/PI/95
TChan
Rwess
02/
/9
02/
5
0:ORS
8
D
0:DRS
TPGw nn
0 /
/95
ABBe
0 /
/95
TPGM nn
/
95
06005'-'
0